Entry   VK, IC. VM, LS, JNC; Test of the new optics (27-28 July) 6x
Start of the modulator and laser at ~9h and hour later start the beam.

Working at 500.38 MHz to retrieve the previous state of the ring. Then switching to 500.33 MHz (assumed ring proper frequency).

- Optimization of the injection and ring (orbit, betatron/synchrotron oscyllations,  tune....)
Entry   VK, IC. VM, LS; Work on the new optics 
9h30 Start of the modulator and laser

Start of the beam. Problem with charge, the max charge at the end of the TL 60 pC. We can not increase it by the attenuator. To be understood.



Corrector ri-c2/ps/str.03-h.01 does not work => problem to control and tune the orbit. JNC will look
Entry   CB/JNC/SC; Faisceau linac 
9h20 Mise en chauffe modulateur, démarrage frigo et laser

Permis casemate en rouge sur le PSS mais impossible de rentrer dans la casemate pour appuyer sur les rondiers : Accés interdit. Pas de
faisceau possible.
Entry   CB/JNC; libera 2 problem 
Les BPm doivent être redémarré et réinitialisé dans jive toutes les 20 minutes environs.

 

 
Entry   VK, VM, IC, LS; Work on the new ring lattice (August, 2-4) 13x
Starting point nominal lattice D1Thomx_017_064_r56_02_chro00 with the MCF=0.014  chro=0/0

Goal: test the new lattice with MCF=0.0231  chro=0/0 which alows to decrease the RF frequesncy down to 500.25 MHz. This will make possible
operation witht eh FPC.
Entry   KD MJ;  
 
Entry   MJ KD; Essai de validation synchro electron / laserFPC 2023-10-10_14-21-43.png2023-10-10_17-38-46.png
** 500.25 MHz anneau

** laser locke tres instable

** Vers 13h : IP retrouvee pour z table = -2.75 mm (position non optimisee, le lock est trop instable ) - Signal
Entry   CB,KD,SC; Linac profiles_darkandbeam.pngsolenoscan16h05.pngsolenoscan16h32.png
8h30 Mise en chauffe modulateur (MO)

Problème synchro, Intervention

10h30 Réglage du laser dans l'iris avec M5, iris = 0.8 pour etre homogene, taille de sigx = 0.22 et sigy = 0.23mm rms. feedbackM4 
Entry   CB; Linac 
Température canon à 31.75° modifiée hier

8h59 Mise en chauffe modulateur et chillers

Tests interface start for ring
Entry   VC,SC, ND, IC, VK, CB, V; Linac 
8h30 Mise en chauffe

Pas d'internet sur client1 et client2

9:45 Pb Database Tanngo.
Entry   ND, Marie Labat; Prise de donnee Cerenkov 6x
9:30 Mise en chauffe

10:00 git pull

Alignement laser sur camera a balayage
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023; Restauration Base de donnée TANGO 
Restauration de la base de donnée TANGO faite aujourd'hui.

Tests des DSs prévus demain matin. Redémarrage des DSs nécessaires avant via astor.

 
Entry   Entered by Super Team from 134.158.195.141 on Fri Nov 3 10:02:34 2023; ThomX aujourd'hui erreur_server_images.pngimage_cameras_ok.png
10h02 : ce matin intervention de Dalkia, coupure de la ventilation, signal sonore en salle de controle, affichage debit ventilation insuffisant.

Remise en route à 11h ?

Problème laser pompe qui ne s'allume pas, Viktor investigue.
Entry   Entered by Nicolas Delerue from 157.136.192.228 on Tue Nov 14 11:09:26 2023; Intervention WAC 
10:50 Appel salle de contrôle. Pas de réponse.

Connexion à distance pour regarder les WAC.

Les réglages de déclenchement de ER/CA/RAC.05-ELR.01-WAC.01 et ER/CA/RAC.05-ELR.01-WAC.03 étaient incorrects. C'est
Entry   SC/IC/JNC/VK/HG/VM; Faisceau anneau point de fonctionnement Screenshot_from_2023-11-16_14-48-02.pngScreenshot_from_2023-11-16_14-49-27.pngScreenshot_from_2023-11-16_16-40-05.png
8h52 : mise en chauffe modulateur et chillers, cyclage des aimants

10h15 : Le laser n'est pas centré dans l'iris malgré le feedback

Modification de M5 à la main car non centré dans l'iris malgré le feedback (xposition 38 à 98), yposition non
Entry   Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023; Prise de donnees 21/11 
13:57 Mise en chauffe

15:00 Faisecau

Tests sur les ecrans
Entry   SC/KD; Faisceau LE 
8h50 Mise en chauffe modulateur

Mise en route chillers et frigo

Problème laser photocathode : en cours d'investigation par Kevin et Viktor
Entry   VC, ND; Tests synchro 
Objectif: Test nouveau code CPLD

14:44 Mise en chauffe modulateur

Le code semble fonctionner => tests avec modulateur
Entry   VC,ND; Tests synchro 
8H15 démarrage chiller et modulateur

Mesure synchro, cf https://elog.lal.in2p3.fr/THOMX/Synchronisation/76

Mesures utilisant la redpitaya ER/CA/RAC.17-ELR.01-RDP.04.
Entry   Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023; Changement de frequence linac Screenshot_from_2023-12-12_12-57-04.png
Suite discussion avec Jean-Boel et Vincent, la frequence linac a ete remise a 2998550000Hz (nominal).

La frequence anneau est inchangee a 500.250000 MHz

Les frequences peuvent etre verifiee dans PlateformIHM / Synchro / Synthetiser status