Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png
Entry   LS, ND; Prise de donnees 23/05 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg
Entry   NC,IC, VM,lS;  ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png
Entry   VK, IC. VM, LS; Studies on the beam revolution frequency 12x
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
Entry   VK, IC. VM; Reestablishing running conditions at 500.38 MHz scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png
Entry   VK, IC. VM, ND, LS; beam storage closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png
Entry   VK, IC. VM; Srart of the beam physics measurements 14x
Entry   VK, IC. VM; Orbit correction, BLM in the Ring 7x
Entry   VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023; Bruit de fond diodes ligneX 2023-06-22-bruit-de-fond-diodes-ligneX.pdf
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023; recherche IP e-/laser 
Entry   VK, IC, DN, RC, JN; search for X-rays 
Entry   all; X detectes aujourd'hui 2023-06-23-Shift.pdf
Entry   SC/CB/JNC; run du 3 juillet 2023 coil2scan_18h06.pngcoil2scan_18h06.png
Entry   SC/CB/ME; Faisceau linac et cavite RF 
Entry   ND,LS, KD, JNC; Shift du 24/07/2023 
Entry   VK, IC. VM, LS, JNC; Test of the new optics (27-28 July) 6x
Entry   VK, IC. VM, LS; Work on the new optics 