  Toutes les notes concernant les Commissionning de ThomX, Page 54 of 62  Not logged in ThomX    logo
ID Date Author Status Type Categorydown Important Subject Icon
  1059   Fri Apr 18 08:23:13 2025 VM, IC, NDFixedProblemLI Measurements 18/4 

08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling all magnets

09h32 HV is 'ON'

09h34 Cannot control the section attenuator

09h50 The issue with the section attenuator was fixed: its server was shut down and restarted, but it was set to 0 dB!!

11h17 RF Gun phase 171 dg., Sect phase is 211 dg. Att. 2.62 dB, TL/BPM2 X=2mm, Charges (from BPMs at Att. 31 dB): -77pC, -77pC, -86pC . Linac steerere: H [1.03 -3.47], V [-1.88 2.63]

Contradictions with ICTs:  -87 pC, -73 pC, -80 pC

Beam in the ring

11h40 RCDS on injection receipt all_20250418_11_39_40, RF cav. at 100 kV, phase 16.5 dg., screanshots

12h03 Linac was reajusted. RF Gun phase is 166 dg., sect. phase is 210 dg. Att. 2.58 dB, TL/BPM2 X=3 mm RF cav. 100 kV, phase 13.5 dg. screenshots

12h10 Ring dipoles were changed from 160.4 A to 159.3 A, ring quads were adjusted and tune as well was set back to 0.17. TL/BPM2 X = 0. Screenshots 

12h25 RF Gun phase was adjusted to 161 dg.

15:24 Initial Synchro delay for streak camera: -6.60us. Injection at delay of +99.3e3us

Measurements incuding single shots

Study of the injection and of long decays with the streak camera, cf images. Horizontal scale is 2ms, vertical scale is 600ps.

Operating the streak camera create instabilities on the ring 500MHz that may cause phase problems.

16h47 RF Gun phase is 149 dg. RF cav. was at  200 kV, phase 10.5 dg.

17h26 Stop thomx

Attachment 1: Screenshot_from_2025-04-18_09-42-24.png
Screenshot_from_2025-04-18_09-42-24.png
Attachment 2: injection_sequence_blank2ms_009.png
injection_sequence_blank2ms_009.png
Attachment 3: injection_sequence_blank2ms_003.png
injection_sequence_blank2ms_003.png
Attachment 4: injection_sequence_blank2ms_002.png
injection_sequence_blank2ms_002.png
Attachment 5: injection_sequence_blank2ms_036.png
injection_sequence_blank2ms_036.png
  1067   Mon May 12 16:27:09 2025 Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025Under ProcessLinacLI Conditionnement 

Demarrage du conditionnement :

Température : 30.90 pour accorder le canon
20dB 19dB ..... 15.5dB à 16h20: vide travaille cf plot. 
faut essayer d'accorder à nouveau le canon. Voir trend, avec la courbe du réfléchi qui diminue. A noter que je ne comprends pas la courbe du PiC qui semble pas bonne alors qu'elle vient de la RP3_CHA. cool
A noter aussi que le PiK semble perdre des coups, alors que les autres non ... indecision

 

17h35 : 11dB -> activité repart un peu à la hausse
17h55 : 8dB (PiC = 1.3 MW): très calme pour le moment
Température de régulation ajustée réguliièrement en augmentant la puissance pour garder un bon tuning (29.75°C)

18h : 7dB(PiC : 1.7 MW)

18h03 : 6.5dB(PiC : 1.9 MW) consigne : 29.5°C

18h06 : 6.dB(PiC : 2.1 MW) consigne : 29.5°C

18h10 : 5.dB(PiC : 2.7 MW) consigne : 29.4°C

18h14 : 4.5 dB(PiC : 3 MW) consigne : 29.3°C

18h20 : 3.5 dB(PiC : 3 MW) consigne : 29.3°C

entre 5 et 3.5 : le vide reste calme mais des claquages visibles dans les ignaux HF

18h22 : 3. dB(PiC : 3 MW) consigne : 29.3°C maintenant on va jouer sur la température pour diminuer le réflechi du canon. Les vides restent bons, pas de soucis de ce coté là.

Plot de la RF en PJ pour montrantque le réflechis s'est amélioré en passant à 3dB (de temp 29.20 --> à 29.45°C)

Résumé vide (plus d'activité apres 14dB, uniquement dégazage)

18h40 : FIN

 

Attachment 1: Vide_passage_15.5dB.png
Vide_passage_15.5dB.png
Attachment 2: RF_plot_15.5dB_NonAccorde.png
RF_plot_15.5dB_NonAccorde.png
Attachment 3: Trend_RF_Apres_Accord_30deg_15.5dB.png
Trend_RF_Apres_Accord_30deg_15.5dB.png
Attachment 4: Vide_11dB_activité_reprend.png
Vide_11dB_activité_reprend.png
Attachment 5: RF_3dB_Temp_29.45C.png
RF_3dB_Temp_29.45C.png
Attachment 6: Vide_at_3dB.png
Vide_at_3dB.png
Attachment 7: trend_RF.png
trend_RF.png
  1073   Tue May 20 15:18:09 2025 HG, SCUnder ProcessInfoLI Faisceau injecteur  

14h : Faisceau, charge max = 200pC à 300 position attenuateur laser

15h : beaucoup de claquages dans le canon, modulateur qui interlocke, et interlock vide en rouge sur le MPS

Le canon n'est plus adapté et impossible de re-démarrer meme à 3dB

Mesure energie laser : diminution du max de l'amplitude qui a diminué de 42 à 36 environ (25%), iris 1.3mm et attenuateur pareil

Maintenant max = 36uJ pour 420

16h04 : remise en route modulateur, on enlève le laser pour remettre la RF, HT = 1215V, att gun = 5dB, le canon n'est pas adapté (a priori c'est normal à 5dB)

Un peu de conditionnement canon pour finir la journée

16uJ le 6 mai et aujourd'hui on a 14 uJ après calculs de Viktor

17:28 att 0 dB (12.5 Hz & 3 µs) voir images température consigne : 28.45 °C

 

 

 

 

 

Attachment 1: RF_2025_05_20_0dB_consigne_temp28.45.png
RF_2025_05_20_0dB_consigne_temp28.45.png
Attachment 2: vide_temp_2025-05-20_17-43-40.png
vide_temp_2025-05-20_17-43-40.png
  1093   Wed Jun 25 18:47:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025Under ProcessShift summaryLI Laser position icon1.gif 

New laser position :

5.041
4.448

Charge : 1.3 mm Iris + 420 Attenuation : 500 pC (Qmax)

 

  1097   Wed Jul 2 14:45:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025Under ProcessInfoLI   

Vérif position laser photocathode :

--> bouge de 1mm en Y et 0.2 en X

Nouvelle position:

  • 5.003
  • 4.553

--> bouge de <0.3 en X et 0 en Y. 

Qmax : 321°
Emax : 271°

Quad Align :

  • 'steerers : ',  li/ps/str.01-h, v    1.0406, -2.4368
  • 'steerers : ',  li/ps/str.02-h, v    -3.2289, 2.8844

 

  1132   Thu Oct 2 08:32:08 2025 Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025Under ProcessShift summaryLI  

08h30 ThomX warm-up

08h37 Cycling all magnets

10h20 HV is ON

10h30 Beam is in the ring

  1152   Tue Nov 18 11:11:33 2025 HG, JM, NDUnder ProcessShift summaryLI Prise de données 18/11 

9h Intervention laser

Intervention pour realignement el/dg/sst.01

11h Fin interventions demarrage machine

12h Quad scans

14h Measures TL

16h Stop ThomX

 

 

  1156   Mon Nov 24 13:22:59 2025 ND + JM + HGUnder ProcessShift summaryLI Prise de données 24/11  

9:15 Mise en chauffe

9h30 Arrivée du SPR: testsSSI ce matin => pas de faisceau avant midi => machine off

12h30 Mise en chauffe,cyclage aimants

13h10 Demarrage

Claquage a 1200V.

13h30 Faisceau

ND : ajustement de cameras

Soleno Scan

Mesure emittance @soleno

 

  1191   Wed Feb 11 09:12:35 2026 VM && HGUnder ProcessShift summaryLI Linac commissioning  

09h12 Warm-up ThomX: Modulator, Laser, Fridge

09h21 Chillers were started, cycling all magnets.

RF 50 pps

1210 --> interlock 
1150 : ok 

enlightenedVacc : vac4 dominates (section) 

Q_max (420) = 700 pC !

Alignement cathode à vérifier
position [X ; Y] : [5.33822878121 ; 4.32296059091]
pente [X ; Y] : [685.183030303 ; 1644.7430303]
error [X ; Y] : [1197.22874693 ; 11425.5175959]

13h38 Standby

14h09 Steereing coils along the section were installed, HV is on, the laser gate was closed

14h10 Sect Att. 30 dB, RF gun Att. 20 dB, HV 1160 ==>1215 V

14h13 All seems OK, Sect. Att. 20 dB 

14h15 Sect. Att. 10 dB 

14h18 Att. 5 dB 

14h20 Att. 3 dB  

14h22 Att. 2.44 dB 

14h24 interlock, sect. vacuum jumps, restarted

14h30 RF Gun Att. 15 dB. Gun vacuum drops

14h32 Gun Att. 10 dB.

14h34 Interlock, unknown reasone, restarted

14h36 Interlock, unknown reasone, restarted

14h41 RF Gun Att. 8 dB.

14h46 RF Gun Att. 7 dB.

14h50 RF Gun Att. 6 dB.

14h53 RF Gun Att. 5 dB. (Gun vac01 1e-8)

14h55 RF Gun Att. 4 dB.

15h01 RF Gun Att. 3 dB.

15h05 Interlock, restarted (not a vacuum problem)

15h06 RF Gun Att. 2 dB.

15h10 RF Gun Att. 1 dB, Sect Att. 1.44 dB

15h11 Interlock, sect. Vacuum (Vac05), Sect Att. 2 dB 

15h15 Interlock, sect. Vacuum

15h20 RF Gun Att. 0.8 dB, Sect Att. 2.04 dB

15h22 Interlock, sect. Vacuum (Vac05)

15h24 RF Gun Att. 0.7 dB, Sect Att. 2.04 dB

15h27 RF Gun Att. 0.6 dB, Sect Att. 2.04 dB

15h32 RF Gun Att. 0.5 dB, Sect Att. 2.04 dB

15h34 RF Gun Att. 0.4 dB, Sect Att. 2.04 dB

15h36 Interlock, sect. Vacuum (Vac05)

15h37 RF Gun Att. 0.3 dB, Sect Att. 2.04 dB

15h39 RF Gun Att. 0.2 dB, Sect Att. 2.04 dB

15h42 RF Gun Att. 0.1 dB, Sect Att. 2.04 dB (gun breakdowns)

15h53 RF Gun Att. 0.0 dB, Sect Att. 2.04 dB (gun breakdowns)

16h00 HV off. 12.5 pps 

16h01 HV on

16h07 Gate open, Laser Att. 233, -100 pC, RF Gun phase 103 dg.

16h35 RF Gun phase 103 dg., Sect. phase 221 dg., Sect. Att. 2.36 dB -100 pC. Linac steerers to align QP1 - QP3 H [-0.22 -2.82], V [-2.52 3.15]. Li/BPM01 x=1.8, y =0, but not on the screen

from the code : QP1 - QP3 H [-0.23 -2.82], V [-2.53 3.16].

Charge is oscillating, do not see the reason. 

rechecked the laser alignment : it's seems to be within the variations of the beam position. Cannot do better. 

Remark concerning the timing ... 25 min more on the trend data (tango, libera side ? ) : see the trend file for the positions. 

H : 5.256
V : 4.643

QP1 scan to check the working point. 

18h30 Stop 

Attachment 1: Vacc_2026-02-11_11-05-31.png
Vacc_2026-02-11_11-05-31.png
Attachment 2: Screenshot_from_2026-02-11_15-57-35.png
Screenshot_from_2026-02-11_15-57-35.png
Attachment 3: Charge_trend_2026-02-11_17-12-31.png
Charge_trend_2026-02-11_17-12-31.png
  1192   Fri Feb 13 17:38:15 2026 Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026Under ProcessShift summaryLI SHift du jour 

The code for laser alignment does not work properly --> done by hand 
H 5.244
V 4.654

phiMax section = 224 

position change (yag screen in pixels)  vs delta phase 

phi posH posV
224 350 267
254 340 272
264 335 260
204 340 266
184 274 280

Sole 230: 

Eps X: 

  emit_norm  : 1.3682 mm.mrad
  beta       : 19.51 m
  alpha      : -6.673

Eps Y: 

emit_norm  : 1.7366 mm.mrad
  beta       : 10.60 m
  alpha      : -3.606
 

Scan_QP0118h01.mat : 230

Scan_QP0118h09.mat : 240

Scan_QP0118h22.mat : 235

Scan_QP0118h26.mat : 225 

Scan_QP0118h31.mat : 235 : 

Scan_QP0118h31.mat : 235 : gain 0 

Scan_QP0118h36.mat : 240  : Gain 0 

18:40 stop

  1208   Wed Mar 11 18:12:23 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026Under ProcessShift summaryLI Emittance vs Iris 

Some Quad scans with variying the Iris opening.

Data :

  • 17h17 : 2mm 120 pC
  • 17h31 : 1.3mm 100pC
  • 17h46 : 1mm 80pC
  • 18h00 : 1mm 100 pC
  • 18h27 : 1mm 100 C Sole 240 
  • 18h41 : 1mm 100 C Sole 245
  1240   Tue May 12 08:42:45 2026 Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026Under ProcessOtherLI manip Gplast 

Demarrage machine 8h40

pB reflechi canon... temp consigne 27.7C

10h50 redemarrage chiller gun ... 

Attenuateur laser 305mm

pB chiller section redemarrage.

Att section 2.24dB phase 232° dipole 158.6A

camera TLSST03 déconnectée du réseau

Timing SST TL 3 retard -6.66µs au lieu de -16µ

réseau très lent

arret machine 17h

 

Attachment 1: Screenshot_from_2026-05-12_10-33-26.png
Screenshot_from_2026-05-12_10-33-26.png
  1241   Wed May 13 08:35:16 2026 Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026Under ProcessOtherLI manip Gplast 

demarrage machine 8h30

faisceau ok vers 10H

14h mesure 50 MeV

16h : passage à 8MeV 

  1247   Tue Jun 16 13:43:30 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026 FixLI   

Hello,

I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time  icon9.gif , need 45 min, you can start at 14:35

Maher

  1254   Mon Jun 29 08:37:27 2026 VCUnder ProcessProblemLI redpitaya 

Les redpitaya baie 17 'RF" ne "communiquent" plus avec JIVE.

IL faut les redémarrer... je ne sais pas faire!

Nicolas passe en fin de matinée pour essayer de les redémarrer

 

Vincent

  992   Thu Jan 9 16:03:52 2025 ND, IC, VK, VMUnder ProcessShift summaryLE Optimisation LE 

15h Scan extraction kicker vs EL/BPM.01.

See attached plots.

Some interferences with ring storage.

Stay around -8us.

Testing reproductibility

Extraction timing=-8.088

Transmission 9%

16h40 Scanning EL/PS/DP.01...

Transmission 36% but it is not clear if the improvment comes from the ring or the transport.

Storage losses in the ring are about 50% so less than 15% losses due to ring injection+extraction.

 

 

 

Attachment 1: scan_ext_kicker_from_-8150_to_-8050_step_5.png
scan_ext_kicker_from_-8150_to_-8050_step_5.png
Attachment 2: scan_ext_kicker_from_-8100_to_-8080_step_1_v2.png
scan_ext_kicker_from_-8100_to_-8080_step_1_v2.png
Attachment 3: scan_EL_PS_DP_01.png
scan_EL_PS_DP_01.png
Attachment 4: Screenshot_from_2025-01-09_17-49-53.png
Screenshot_from_2025-01-09_17-49-53.png
Attachment 5: Screenshot_from_2025-01-09_17-52-20.png
Screenshot_from_2025-01-09_17-52-20.png
  1120   Fri Sep 12 09:06:59 2025 VC, ND, KDUnder ProcessShift summaryLE Shift summary 12/9/2025 

8h20: mise en chauffe en remote (Laser, modulateur, frigo/chiller, cyclage)

9:00 Redemarrage mean_std qui etait planté

9:10 Cyclage aimants

9:27 Git pull: Added EL/PS/DPi to IHM_Cycling

9:50 Discussion avec JNC. Changement de la valeur maximum d'alerte sur QP5 de 10.0 a 10.1A. Le probleme de cyclage persiste: la tension depasse parfois 6V quand I=10A. JNC va resserer des cables.

recette: good_20250821_17_14_40    70MeV

 

11:00 Observation signal FC EL avec et sans faisceau. wc3_shutter_effect.png   (11H22)

Vers l'échantillon 200 on voit la réponse de la FC.

11:50 Optimisation des steerers. EL/PS/STR.02-V.01 plante souvent, impossible de l'utiliser.

12:40 Extinction de l'anneau pour analyse bruit EP sur ICT et BPM.

13:00 arret faisceau

14:00 test cyclage QP5 succès (2 fois de suite)

Test mesure charge:

ICTs : Deux traitements de données ("Vincent" et "Hayg")

La méthode "V" est robuste aux bruits des EPs (avec une mesure de "dark current" à effectuer quand les EPs sont allumés),  La méthode "H" est très sensible aux EPs (pas de soustraction du bruit) mais semble plus "propre" dans la mesure de charge.

BPMs

après plusieurs tests (utilisation des fentes pour diminuer la charge) pour vérifier que la charge transmise dans la ligne n'est pas un pB physique, il semble que les BPM TL02 et TL03 on une mesure 20% supérieure à TL01
Check des configuration des liberas

(code pour calcul charge ICT taurustrend 'eval:a={er/ca/rac.05-elr.01-wac.01/ch0}; 1e9 * (a[650:950] - a[:200].mean()).sum() *10 / (3200 * 1e6 * 50) '  'eval:a={er/ca/rac.05-elr.01-wac.02/ch3}; 1e9 * (a[650:950] - a[:200].mean()).sum() *10 / (3200 * 1e6 * 50) ' 'eval:a={er/ca/rac.05-elr.01-wac.02/ch4}; 1e9 * (a[650:950] - a[:200].mean()).sum() *10 / (3200 * 1e6 * 50) ' &
 

 Avec un décalage timing des wavecatchers et le code ci dessus , la méthode "H" est moins sensible aux EPs...

Attention un recall de la rectte Timing est à faire ...   prévu par Nicolas ce soir!

17H15 ThomX OFF

 

 

 

 

===

Objectifs:

1) Utiliser EL/FC avec passage dans l 'anneau.

2) Comparer Signaux sur ICT, FC et BPM avec et sans EP

3) Comprendre probleme augmentation charge dans TL

 

 

 

 

 

Attachment 1: wc3_shutter_effect.png
wc3_shutter_effect.png
Attachment 2: wc3_steererH_scan.png
wc3_steererH_scan.png
Attachment 3: Screenshot_from_2025-09-12_15-56-50.png
Screenshot_from_2025-09-12_15-56-50.png
  396   Thu Mar 10 09:15:36 2022 Entered by Super Team from 134.158.195.141 on Thu Mar 10 09:15:18 2022Under ProcessUrgentInfra | Linac Commissionning intervention M Langlet en sous sol 

9h : M Langlet a besoin de façon urgente d'acceder au sous-sol.

Deverouillage de la fosse Nord

HM

  415   Thu Mar 24 10:34:15 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022FixedFixInfra | Linac Commissionning config clefs PSS 

Operateurs: VC, SC, ND

Pour memoire, cf photo...

Attachment 1: IMG_20220324_102230_1_copy_1248x1664.jpg
IMG_20220324_102230_1_copy_1248x1664.jpg
  877   Fri Jun 7 09:24:59 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 7 09:24:42 2024New SolutionShift summaryInfra | Linac Commissionning Interventions du matin 

9h Intervention sur les filtres de la CTA (Dalkia, Stéphane)

9h Intervention dans les sous-sols (infra) pour le pompage, ouverture des grands vantaux

9h20 CTA remise en route accès à la casemate à nouveau possible

9h20 Intervention Dalkia concernant les réglages de la pompe, arrêt de la pompe à prévoir qui va durer au moins toute la matinée

Cable coupé controlé par le SPR : ok pas de soucis, cable posé sur les dosimètres

L'intervention sur les pompes de la fosse nord n'est pas terminé et continuera cette apres midi : besoin acces fosse nord

 

 