ID Date Author Status Type Categorydown Important Subject Icon Text Attachments
  1059   Fri Apr 18 08:23:13 2025 VM, IC, NDFixedProblemLI Measurements 18/4 08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling
all magnets
 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png 
  1067   Mon May 12 16:27:09 2025 Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025Under ProcessLinacLI Conditionnement Demarrage du conditionnement :

Température : 30.90 pour
accorder le canon
 7x 
  1073   Tue May 20 15:18:09 2025 HG, SCUnder ProcessInfoLI Faisceau injecteur  14h : Faisceau, charge max = 200pC à
300 position attenuateur laser

15h : beaucoup de claquages dans
 RF_2025_05_20_0dB_consigne_temp28.45.pngvide_temp_2025-05-20_17-43-40.png 
  1093   Wed Jun 25 18:47:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025Under ProcessShift summaryLI Laser position icon1.gif New laser position :

5.041
4.448
  
  1097   Wed Jul 2 14:45:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025Under ProcessInfoLI   Vérif position laser photocathode
:

--> bouge de 1mm en Y et 0.2
  
  1132   Thu Oct 2 08:32:08 2025 Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025Under ProcessShift summaryLI  08h30 ThomX warm-up

08h37 Cycling all magnets

10h20 HV is ON
  
  1152   Tue Nov 18 11:11:33 2025 HG, JM, NDUnder ProcessShift summaryLI Prise de données 18/11 9h Intervention laser

Intervention pour realignement
el/dg/sst.01
  
  1156   Mon Nov 24 13:22:59 2025 ND + JM + HGUnder ProcessShift summaryLI Prise de données 24/11  9:15 Mise en chauffe

9h30 Arrivée du SPR: testsSSI
ce matin => pas de faisceau avant midi
  
  1191   Wed Feb 11 09:12:35 2026 VM && HGUnder ProcessShift summaryLI Linac commissioning  09h12 Warm-up ThomX: Modulator, Laser,
Fridge

09h21 Chillers were started, cycling
 Vacc_2026-02-11_11-05-31.pngScreenshot_from_2026-02-11_15-57-35.pngCharge_trend_2026-02-11_17-12-31.png 
  1192   Fri Feb 13 17:38:15 2026 Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026Under ProcessShift summaryLI SHift du jour The code for laser alignment does not work
properly --> done by hand 
H 5.244
  
  1208   Wed Mar 11 18:12:23 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026Under ProcessShift summaryLI Emittance vs Iris Some Quad scans with variying the Iris
opening.

Data :
  
  1240   Tue May 12 08:42:45 2026 Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026Under ProcessOtherLI manip Gplast Demarrage machine 8h40

pB reflechi canon... temp consigne
27.7C
 Screenshot_from_2026-05-12_10-33-26.png 
  1241   Wed May 13 08:35:16 2026 Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026Under ProcessOtherLI manip Gplast demarrage machine 8h30

faisceau ok vers 10H

14h mesure 50 MeV
  
  1247   Tue Jun 16 13:43:30 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026 FixLI   Hello,

I short-circuit the MPS input to
modulator, we can trig modulator, the klystron
  
  1254   Mon Jun 29 08:37:27 2026 VCUnder ProcessProblemLI redpitaya Les redpitaya baie 17 'RF" ne
"communiquent" plus avec JIVE.

IL faut les redémarrer...
  
  992   Thu Jan 9 16:03:52 2025 ND, IC, VK, VMUnder ProcessShift summaryLE Optimisation LE 15h Scan extraction kicker vs EL/BPM.01.

See attached plots.

Some interferences with ring storage.
 scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png 
  1120   Fri Sep 12 09:06:59 2025 VC, ND, KDUnder ProcessShift summaryLE Shift summary 12/9/2025 8h20: mise en chauffe en remote (Laser,
modulateur, frigo/chiller, cyclage)

9:00 Redemarrage mean_std qui etait
 wc3_shutter_effect.pngwc3_steererH_scan.pngScreenshot_from_2025-09-12_15-56-50.png 
  396   Thu Mar 10 09:15:36 2022 Entered by Super Team from 134.158.195.141 on Thu Mar 10 09:15:18 2022Under ProcessUrgentInfra | Linac Commissionning intervention M Langlet en sous sol 9h : M Langlet a besoin de façon
urgente d'acceder au sous-sol.

Deverouillage de la fosse Nord
  
  415   Thu Mar 24 10:34:15 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022FixedFixInfra | Linac Commissionning config clefs PSS Operateurs: VC, SC, ND

Pour memoire, cf photo...
 IMG_20220324_102230_1_copy_1248x1664.jpg 
  877   Fri Jun 7 09:24:59 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 7 09:24:42 2024New SolutionShift summaryInfra | Linac Commissionning Interventions du matin 9h Intervention sur les filtres de la CTA
(Dalkia, Stéphane)

9h Intervention dans les sous-sols
  