HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 54 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Status Type Category Important Subject Icon Text Attachments
  1064   Fri May 2 17:47:18 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri May 2 17:47:04 2025 Shift summaryLinac Commissionning | Ring Commissioning Commissioning Spectro Vortex/FalconX 1) Setup (pj 1) : petite sphere "jaune"
devant le vortex (je ne sais pas en quoi
elle est faite, peut-etre un laiton ...)
 setup.jpeg20250502_Pulse_charac_Capture.PNG20250502_acquisition_Capture.PNG 
  1045   Fri Mar 21 17:57:40 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri Mar 21 17:57:25 2025 Shift summaryLinac Commissionning | Ring Commissioning 21 mars - Mesures X-rays - Bravin & co Det
Photonic fond de la X-hutch


Tomo : un
  
  Draft   Thu Oct 30 07:21:22 2025 Entered by Marie Jacquet from 134.158.205.9 on Thu Oct 30 07:21:05 2025Under ProcessShift summaryLI | TL | LE | Ring Programme shift (X-rays spectres vs atte & phases) 08h17 Warm-up ThomX: Modulator, Laser,
Fridge

08h24 Chillers were started, cycling
  
  1092   Tue Jun 24 18:33:20 2025 Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025 Shift summaryLI | TL | LE | Ring Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) *** Spectres
des 4 Echantillons Bazin + Backgroung avec
:
 10x 
  915   Mon Sep 16 23:59:24 2024 Entered by Marie Jacquet from 134.158.205.56 on Mon Sep 16 23:59:00 2024 Shift summaryLinac Commissionning alignement section de lundi 16/09 Alignement section, bilan du jour :

En partant de 
Li/STR1 [H,V] : [0.93 , -0.9]  
  
  686   Sat Feb 18 14:37:40 2023 Entered by Marie Jacquet from 134.158.205.50 on Sat Feb 18 14:37:01 2023 Shift summaryLinac Commissionning Comparaisons mesures-simuls ASTRA versus I_Soleno - Complements elog 676 et 681 En pj  2023-02-18-elog.pdf 
  Draft   Wed Mar 8 11:45:46 2023 Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023    I-dipole vs X_TLBPM02 - Mesures/Simul (suite elog 28 fev) Tue Feb 28 08:48:29
2023

8H50-demarrage chiller et chauffage
  
  708   Wed Mar 8 11:47:20 2023 Entered by Marie Jacquet from 134.158.205.47 on Wed Mar 8 11:45:31 2023 Shift summaryLinac Commissionning (suite elog 28 fev) data X_TLBPM02 vs I_Dipole - Plot Mesures/Simul  Tue Feb 28 08:48:29
2023

8H50-demarrage chiller et chauffage
 2023-02-28-I_Dip_vs_X_TLBPM02.png 
  591   Fri Oct 14 12:59:34 2022 Entered by Marie Jacquet from 134.158.205.43 on Fri Oct 14 12:59:10 2022 InfoLinac Commissionning Schema position elements LINAC Demande par plusieurs personnes, je vous
transmets ici mon schema de la position des
elements dans le LINAC
 LINAC-position-elements.bmp 
  623   Fri Nov 4 11:56:48 2022 Entered by Marie Jacquet from 134.158.205.43 on Fri Nov 4 11:56:17 2022Not FixedShift summaryLinac Commissionning Mesures BPM et YAG vs Steerers - 17/10, 24/10 et 26/10 Ci-joint le bilan BPM
et YAG vs steerer de 3 jours differents :
le 17 le 24 et le 26 octobre
 2022-11-04-BPM-YAG-STR.pdf 
  1024   Fri Feb 28 00:32:21 2025 Entered by Marie Jacquet from 134.158.205.38 on Thu Feb 27 23:45:19 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 27 fevrier (visite Alberto Paola Luca)  ** Nouvelle
prise d'images pour determiner les distortions
du det :
  
  556   Fri Sep 16 16:39:55 2022 Entered by Marie Jacquet from 134.158.205.33 on Fri Sep 16 16:39:35 2022 Shift summaryLinac Commissionning shifts des 12 et 13 septembre - axes MAG vs BPM_TL et YAG_TL Données prises les 12 et
13 septembre

Très faible charge (<10
  
  Draft   Fri Sep 16 16:13:55 2022 Entered by Marie Jacquet from 134.158.205.33 on Fri Sep 16 16:13:31 2022 Shift summaryLinac Commissionning       
  1030   Thu Mar 6 10:38:31 2025 Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Programme de la journee : preparation des valeurs a remplir  1 : Alignement Axe
Q1-Q3 avec SCRIPT - Conditions
 Compare_Align_ALL.pngTrend_Position_Yag_Sautes.pngJauges_2025-03-06_18-47-14.png2025-03-06-Q1Q3_Q4Q5.pdf 
  1116   Tue Sep 9 15:19:47 2025 Entered by Marie Jacquet from 134.158.205.21 on Tue Sep 9 15:19:28 2025FixedShift summaryLI | TL | LE | Ring X-rays - Recherche on-axis avec script fwhm - Prise de qq spectres - Mesure taille source ** spectre CdTe avec feuille Au (pour calib)

** Utilisation du script FWHM des
spectres, mapping 2D - Enregistrment spectres
  
  1087   Wed Jun 11 08:46:58 2025 Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025 Shift summaryLI | Ring 2025-06-04 Fluo-spectro : Spectre du 2025-06-04    spectres_20250604.pdf 
  982   Tue Dec 17 23:26:45 2024 Entered by Marie Jacquet from 134.158.205.16 on Tue Dec 17 23:26:26 2024FixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning shift 17/12 - scan vert FPC - 50 MeV 8h10 : mise en chauffe de la machine (modulateur,
laser, frigo et chiller)

9h30: faisceau dans anneau avec
 6x 
  1042   Thu Mar 20 18:41:55 2025 Entered by Marie Jacquet from 134.158.205.16 on Thu Mar 20 18:41:39 2025 Shift summaryLI | Ring | Linac Commissionning | Ring Commissioning 19 et 20 mars - Mesures X-rays - Bravin & co 19
mars 2025

 spectre_42keV.png 
  672   Mon Feb 13 13:35:12 2023 Entered by Marie Jacquet from 134.158.195.141 on Mon Feb 13 13:34:44 2023Not FixedProblemLinac Commissionning problemes avec SST et YAGLI 1)  "Show camera" 
soit ca plante , soit ca finit par s'ouvrir
mais au bout de plusieurs minutes
 Screenshot_from_2023-02-13_13-36-34.png 
  673   Mon Feb 13 15:07:11 2023 Entered by Marie Jacquet from 134.158.195.141 on Mon Feb 13 13:34:44 2023Not FixedProblemLinac Commissionning RE: problemes avec SST et YAGLI 1) Je viens de tenter de reproduire le
problème. Il est normal que cela mette
du temps à charger, surtout au premier
  