Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study    
|
Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du
faisceau.
|
VM, IC, ND; Measurements 18/4    
|
08h21 Thomx Started: modulator, frig, laser
08h27 Chillers started, cycling all magnets
09h32 HV is 'ON' |
Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025; Conditionnement 7x
|
Demarrage du conditionnement :
Température : 30.90 pour accorder le canon
20dB 19dB ..... 15.5dB à 16h20: vide travaille cf plot. |
HG, SC; Faisceau injecteur 
|
14h : Faisceau, charge max = 200pC à 300 position attenuateur laser
15h : beaucoup de claquages dans le canon, modulateur qui interlocke, et interlock vide en rouge sur le MPS
Le canon n'est plus adapté et impossible de re-démarrer meme à 3dB |
Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025; Laser position
|
New laser position :
5.041
4.448 |
Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025;
|
Vérif position laser photocathode :
--> bouge de 1mm en Y et 0.2 en X
Nouvelle position: |
Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025;
|
08h30 ThomX warm-up
08h37 Cycling all magnets
10h20 HV is ON |
HG, JM, ND; Prise de données 18/11
|
9h Intervention laser
Intervention pour realignement el/dg/sst.01
11h Fin interventions demarrage machine |
ND + JM + HG; Prise de données 24/11
|
9:15 Mise en chauffe
9h30 Arrivée du SPR: testsSSI ce matin => pas de faisceau avant midi => machine off
12h30 Mise en chauffe,cyclage aimants |
VM && HG; Linac commissioning  
|
09h12 Warm-up ThomX: Modulator, Laser, Fridge
09h21 Chillers were started, cycling all magnets.
RF 50 pps |
Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026; SHift du jour
|
The code for laser alignment does not work properly --> done by hand
H 5.244
V 4.654 |
Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026; Emittance vs Iris
|
Some Quad scans with variying the Iris opening.
Data :
17h17 : 2mm 120 pC
17h31 : 1.3mm 100pC
17h46 : 1mm 80pC
18h00 : 1mm 100 pC
18h27 : 1mm 100 |
Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026; manip Gplast
|
Demarrage machine 8h40
pB reflechi canon... temp consigne 27.7C
10h50 redemarrage chiller gun ... |
Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026; manip Gplast
|
demarrage machine 8h30
faisceau ok vers 10H
14h mesure 50 MeV |
Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026;
|
Hello,
I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time , need 45 min, you can start at 14:35 |
VC; redpitaya
|
Les redpitaya baie 17 'RF" ne "communiquent" plus avec JIVE.
IL faut les redémarrer... je ne sais pas faire!
Nicolas passe en fin de matinée pour essayer de les redémarrer |
ND, IC, VK, VM; Optimisation LE    
|
15h Scan extraction kicker vs EL/BPM.01.
See attached plots.
Some interferences with ring storage. |
VC, ND, KD; Shift summary 12/9/2025  
|
8h20: mise en chauffe en remote (Laser, modulateur, frigo/chiller, cyclage)
9:00 Redemarrage mean_std qui etait planté
9:10 Cyclage aimants |
Entered by Super Team from 134.158.195.141 on Thu Mar 10 09:15:18 2022; intervention M Langlet en sous sol
|
9h : M Langlet a besoin de façon urgente d'acceder au sous-sol.
Deverouillage de la fosse Nord
HM |
Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022; config clefs PSS
|
Operateurs: VC, SC, ND
Pour memoire, cf photo... |