  Toutes les notes concernant les Commissionning de ThomX, Page 54 of 63  Not logged in ThomX    logo
Entry   Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study  Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png
Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du
faisceau.
 
Entry   VM, IC, ND; Measurements 18/4 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png
08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling all magnets

09h32 HV is 'ON'
Entry   Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025; Conditionnement 7x
Demarrage du conditionnement :

Température : 30.90 pour accorder le canon
20dB 19dB ..... 15.5dB à 16h20: vide travaille cf plot. 
Entry   HG, SC; Faisceau injecteur  RF_2025_05_20_0dB_consigne_temp28.45.pngvide_temp_2025-05-20_17-43-40.png
14h : Faisceau, charge max = 200pC à 300 position attenuateur laser

15h : beaucoup de claquages dans le canon, modulateur qui interlocke, et interlock vide en rouge sur le MPS

Le canon n'est plus adapté et impossible de re-démarrer meme à 3dB
icon1.gif   Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025; Laser position  
New laser position :

5.041
4.448
Entry   Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025;  
Vérif position laser photocathode :

--> bouge de 1mm en Y et 0.2 en X

Nouvelle position:
Entry   Entered by Super Team from 134.158.195.141 on Thu Oct 2 08:31:43 2025;  
08h30 ThomX warm-up

08h37 Cycling all magnets

10h20 HV is ON
Entry   HG, JM, ND; Prise de données 18/11 
9h Intervention laser

Intervention pour realignement el/dg/sst.01

11h Fin interventions demarrage machine
Entry   ND + JM + HG; Prise de données 24/11  
9:15 Mise en chauffe

9h30 Arrivée du SPR: testsSSI ce matin => pas de faisceau avant midi => machine off

12h30 Mise en chauffe,cyclage aimants
Entry   VM && HG; Linac commissioning  Vacc_2026-02-11_11-05-31.pngScreenshot_from_2026-02-11_15-57-35.pngCharge_trend_2026-02-11_17-12-31.png
09h12 Warm-up ThomX: Modulator, Laser, Fridge

09h21 Chillers were started, cycling all magnets.

RF 50 pps
Entry   Entered by Super Team from 127.0.0.1 on Fri Feb 13 17:38:00 2026; SHift du jour 
The code for laser alignment does not work properly --> done by hand 
H 5.244
V 4.654
Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026; Emittance vs Iris 
Some Quad scans with variying the Iris opening.

Data :


17h17 : 2mm 120 pC
17h31 : 1.3mm 100pC
17h46 : 1mm 80pC
18h00 : 1mm 100 pC
18h27 : 1mm 100
Entry   Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026; manip Gplast Screenshot_from_2026-05-12_10-33-26.png
Demarrage machine 8h40

pB reflechi canon... temp consigne 27.7C

10h50 redemarrage chiller gun ... 
Entry   Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026; manip Gplast 
demarrage machine 8h30

faisceau ok vers 10H

14h mesure 50 MeV
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026;  
Hello,

I short-circuit the MPS input to modulator, we can trig modulator, the klystron filmant time goes to full time   , need 45 min, you can start at 14:35
Entry   VC; redpitaya 
Les redpitaya baie 17 'RF" ne "communiquent" plus avec JIVE.

IL faut les redémarrer... je ne sais pas faire!

Nicolas passe en fin de matinée pour essayer de les redémarrer
Entry   ND, IC, VK, VM; Optimisation LE scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png
15h Scan extraction kicker vs EL/BPM.01.

See attached plots.

Some interferences with ring storage.
Entry   VC, ND, KD; Shift summary 12/9/2025 wc3_shutter_effect.pngwc3_steererH_scan.pngScreenshot_from_2025-09-12_15-56-50.png
8h20: mise en chauffe en remote (Laser, modulateur, frigo/chiller, cyclage)

9:00 Redemarrage mean_std qui etait planté

9:10 Cyclage aimants
Entry   Entered by Super Team from 134.158.195.141 on Thu Mar 10 09:15:18 2022; intervention M Langlet en sous sol 
9h : M Langlet a besoin de façon urgente d'acceder au sous-sol.

Deverouillage de la fosse Nord

HM
Entry   Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022; config clefs PSS IMG_20220324_102230_1_copy_1248x1664.jpg
Operateurs: VC, SC, ND

Pour memoire, cf photo...