Entry   KD, VC; shift du 28 Novembre 2022 
Entry   KD; shift du 5 décembre 2022 
Entry   MJ KD; shift du 6 decembre 2022 Calibration_camera_SST-02.pptxScreenshot_from_2022-12-06_15-37-50_BUG_SST.png
Entry   ND, VK, VM, MJ; Shift 21/2 scan_charge_phase_min_0.0_max_360.0_13_43_30.pngscan_charge_phase_min_260.0_max_300.0_13_44_14.pnghealth_check_2023_02_21_14_03.pngquad_scan_tl_dg_sst.01_20230221_16_4_5-8_x.pngQuad_scan_21.02.2023.pptx
Entry   SC, ND; Effet changement de phase RF Canon sur TL/BPM.02 Screenshot_from_2023-06-13_13-50-23.png
    Reply   SC, ND; RE: Effet changement de phase RF Canon sur TL/BPM.02 
Entry   SC/CB/JNC; run du 3 juillet 2023 coil2scan_18h06.pngcoil2scan_18h06.png
Entry   CB; Linac 
Entry   Entered by Super Team from 134.158.195.141 on Thu Nov 2 16:51:56 2023; Restauration Base de donnée TANGO 
Entry   Entered by Super Team from 134.158.195.141 on Fri Nov 3 10:02:34 2023; ThomX aujourd'hui erreur_server_images.pngimage_cameras_ok.png
Entry   ND, Nida Riaz, Alfred Mishi; Shift summary 20/11/2023 health_check_2023_11_20_10_49.pngscan_Laser_vs_RF_phase_2023_11_20_10_58.pngcentrale_desactivee.jpg
Entry   ND, Anna K, Elene K, Marie L; Prise de donneees 5/02 mrsv_nobeam.pngmrsv_beam.png
Entry   SC/JNC; redemarrage linac apres elongation anneau 
Entry   MJ; Trends - conditionnement section 23 juillet 
Entry   ND, Manon Philit, Janine Issa; Shift summary 25/10 2024-10-25_12_25_26_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngscan_2024_10_25_16_36.pngscan_2024_10_25_16_41.pngscan_2024_10_25_16_51.png
Entry   KD; laser PC  2024-11-22_11_07_23_li_op_las_02_RAW.png2024-11-22_11_07_57_li_op_las_02_RAW.png
Entry   Entered by Super Team from 134.158.195.141 on Fri Mar 28 14:26:38 2025; Prep faisceau pour lundi 
Entry   Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study  Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png
Entry   VM, IC, ND; Measurements 18/4 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png
Entry   Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025; Conditionnement 7x