HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 53 of 62  Not logged in ThomX    logo
ID Date Author Statusdown Type Category Important Subject Icon Text Attachments
  543   Fri Sep 9 18:26:51 2022 Entered by Moutardier Alexandre from 134.158.195.145 on Fri Sep 9 18:26:38 2022 InfoDiag First injection in the ring  Injection dans l'anneau.

Signaux sur les 5 premier BPM de
l'anneau without kicker.
 injection_ring.pngtbt_sum_injection.png 
  Draft   Fri Sep 16 16:13:55 2022 Entered by Marie Jacquet from 134.158.205.33 on Fri Sep 16 16:13:31 2022 Shift summaryLinac Commissionning       
  556   Fri Sep 16 16:39:55 2022 Entered by Marie Jacquet from 134.158.205.33 on Fri Sep 16 16:39:35 2022 Shift summaryLinac Commissionning shifts des 12 et 13 septembre - axes MAG vs BPM_TL et YAG_TL Données prises les 12 et
13 septembre

Très faible charge (<10
  
  560   Wed Sep 21 20:07:01 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLinac Commissionning BPM LINAC + TL : dispersion tir a tir ? Aujourd'hui Iriya m'a montre en
salle de controle une "etendue"
de ~4mm de l'orbite du faisceau mesuree
  
  561   Thu Sep 22 00:00:43 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLI | Diag | Linac Commissionning RE: BPM LINAC + TL : dispersion tir a tir ? CALC/DG/MeanStd1 permet déjà
d'avoir la déviation standard
de la position mesurée sur 100 tirs
  
  564   Fri Sep 23 08:48:20 2022 Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022 Shift summaryRing Shift du 23/09/2022 AM :


État a l'arrivé
:
 6x 
  569   Wed Sep 28 19:14:11 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 28 19:13:52 2022 Shift summaryLinac Commissionning Shift du 12-13/09 en image  En pj, les donnees "Alignement LINAC"
du 12-13/09, en image (donnees brutes notees
dans le elog le 16/09).
 2022-09-28-elog.pdf 
  570   Thu Sep 29 07:59:51 2022 AM, IC, VK, VI, SC, ND Shift summaryLI | TL | Ring | Diag Shift du 29/09/2022 AM :

git pull sur $HOME_IHM


pression vanne vide : 5.7
 9x 
  Draft   Tue Oct 4 15:47:22 2022 MJ/HG/SC LinacLinac Commissionning Alignement linac Modulateur HV=1090V enregistrement des
Pic

Faisceau linac en cours
  
  Draft   Tue Oct 4 17:34:09 2022 Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 Shift summary  Planning shift Thursday 6th October - Study beam position on SST and BPM vs
iris size / TL/BPM.01

- Start AcQAttrManager
  
  Draft   Wed Oct 5 19:02:28 2022 VK, VM, HG,IC, AL      Shift started with machine receipy from
Monday .

Scan parameters, injection to find
  
  578   Thu Oct 6 10:18:03 2022 VK/ND/SC AnneauRing Commissioning Faisceau Anneau Modulateur Impossible à passer en
Standby ==> problème manque d'eau.

     
 10x 
  579   Fri Oct 7 00:30:24 2022 Entered by Marie Jacquet from 88.165.97.136 on Fri Oct 7 00:30:03 2022 Shift summaryLinac Commissionning shifts LINAC 4/10 et 6/10 4/10 : Prise de donnees "Alignement
LINAC" (Hayg Marie)

Iris
  
  585   Tue Oct 11 11:57:19 2022 HG/CB InfoLI | TL | LE | Linac Commissionning run du 11/10/2022 Iris de 2mm, prise d'image @12h -->
dimension H 0.37mm et V 0.34mm

iris 1mm, prise d'image @12h14
 BPM_saturation_2022-10-11_15-07-37.png 
  589   Thu Oct 13 17:41:13 2022 Entered by Marie Jacquet from 134.158.89.45 on Thu Oct 13 17:41:00 2022 Shift summaryLinac Commissionning Alignement LINAC (canon-LIL-QUADs) Ci-joint le bilan, au jour d'aujourd'hui,
des reconstructions Horizontales et Verticales
des axes MAG Canon, LIL et QUADs a l'aide
 2022-10-13-elog.pdf 
  591   Fri Oct 14 12:59:34 2022 Entered by Marie Jacquet from 134.158.205.43 on Fri Oct 14 12:59:10 2022 InfoLinac Commissionning Schema position elements LINAC Demande par plusieurs personnes, je vous
transmets ici mon schema de la position des
elements dans le LINAC
 LINAC-position-elements.bmp 
  593   Mon Oct 17 18:18:23 2022 MJ KD Shift summaryLinac Commissionning axe MAG de QP4 et de QP5 vs axe MAG Q1-Q3 - degrossissage ... str1H -1.37  - str1V 0.51 
- strTL1H -5 =  a peu pres
axe mag Q1-Q3
  
  598   Thu Oct 20 08:56:39 2022 SC, ND AnneauDiag Shift du 20/10/2022 8h56 Démarrage modulateur et refroidissement

9h20: git pull => mise a jour
des IHM SST et BPM (git pull qui n'avait
 8x 
  600   Mon Oct 24 10:28:57 2022 MO Shift summaryLinac Commissionning   10h30 lancement des IHM ( via Terminal
) , démarrage modulateur, frigo et
chillers
  
  602   Mon Oct 24 14:08:11 2022 Entered by Super Team from 134.158.195.141 on Mon Oct 24 14:07:57 2022 ProblemLinac Commissionning positions en mm ont disparu sur lIHM SST Les positions en mm ont disparu sur lIHM
SST !

est-il possible de les remettre
  
ELOG V3.1.4-395e101