Entry   VM, IC, RC;  Screenshot_from_2025-03-31_18-06-59.pngScreenshot_from_2025-03-31_17-52-04.pngScreenshot_from_2025-03-31_17-14-56.png2025-03-31_10_40_04_li_dg_sst_01-ccd_01_RAW.png
08h00 ThomX started by Maher

09h50 Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.

ThomX configuration changed to 'Linac'.
Entry   VM, IC, DN;  
08h42 Start ThomX: Morulator, firg, laser

08h47 Chillers, cycling all magnets

10h40 HV is 'ON'
Entry   Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025; Programme mercredi 2/04 spectres_synchro_desynchro.png
9h: mise en chauffe machine depuis bureau (Modulateur, laser, frigo/chiller, cyclage aimants)

Problème sur les Dipôles TL et EL (erreur à acquitter sur place)
Erreurs acquittees
Entry   KD; shift du 3 avril 2025 
9h: mise en chauffe machine en remote (Modulateur, frigo/chiller, laser, cyclage aimants).
Entry   ML, VM, DN, ND; Prise de données 4/04 10x
8:59 Mise en chauffe

9:15 Installation laser alignement SR

10:30 Problem Astor et Jive (see screenshot)
Entry   KD; shift du 8 avril 2024 2025-04-08_17_34_45_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.pngcharge_transportee_7MeV.pngNote_technique_atténuateur_MEGA_industries_V3.pdf
10h10 : mise en chauffe machine (frigo/chiller, modulateur, laser) + remise de SF6

recette sauvé pour 7MeV jusqu'à TL/SST.03, phase section 53° @34dB (canon energie max @ 3dB)

==> il faut jouer sur le klystron car trop de puissance RF dans la section (atténuation max ~38dB @ 2460pas)
Entry   KD, HG, ND, ML, VM; shift du 10 avril 2025 Screenshot_from_2025-04-10_17-10-09.pngScreenshot_from_2025-04-10_17-09-56.png
9h : mise en chauffe en remote (frigo/Chiller, Modulateur, laser, cyclage)

 

*** programme ***
Entry   VC SC HG; shift du 11 avril  align_soir.png
demarrage chauffage 8hh50

faisceau sur Yag 1 depuis 1heure....

le script d'alignement solenoide est introuvable!!!!! 
Entry   KD; shift du 15 avril 2025 
8h10 : mise en chauffe de la machine à distance (modulateur, chiller/frigo, cyclage)

* redémarrage des DS client5

* impossible de lancer le laser (il faut intervenir en local)
Entry   Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025; Beam study  Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png
Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du
faisceau.
 
Entry   VM, RC, DN, ND;  health_check_Vide_Jauge_2025_04_17_09_25.pnghealth_check_RF_Redpitaya_2025_04_17_09_27.pngbpm_1_vs_kicker_second.pngviewer_2025_04_17_12_44_06.png20250417_175615.jpg
08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets cycling

Filesystem very slow
Entry   VM, IC, ND; Measurements 18/4 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png
08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling all magnets

09h32 HV is 'ON'
Entry   Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025; Hayg / Thibault 
 

Position moteur actuels (on ne les vois pas dans le log du shift Sophie/Vincent)

Col-01 Mot-01 : 1.213
Entry   Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025; Data taking for ML  
Demarrage ACQ pour ML 

Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3 
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran 
Entry   VC, DN, MJ, IC, VM; Recherche position image camera MRSV 2025-04-30_16-23-33_MRSV_fwhm_trends.png2025-04-30_17-14-26_total_beam.png2025-04-30_17-15-03_coupe_moitie_basse.png2025-04-30_17-15-54_coupe_moitie_haute.png
Start chauffage 9H

There were some problems: the phase section motor was in the wrong position, although the readings were normal; The rear door of the septum
power supply was not fully closed.
Entry   VM;  
08h22 ThomX was started: modulator, frig, laser

08h28 Chillers was started, all magnets cycling

09h45 HV is 'ON'
Entry   Entered by Marie Jacquet from 134.158.89.45 on Fri May 2 17:47:04 2025; Commissioning Spectro Vortex/FalconX setup.jpeg20250502_Pulse_charac_Capture.PNG20250502_acquisition_Capture.PNG
1) Setup (pj 1) : petite sphere "jaune" devant le vortex (je ne sais pas en quoi elle est faite, peut-etre un laiton ...)

2) "pulse characterisation" (pj2) --> fichier  20250502.ini  cree

3) Acquisition avec 20250502.ini (pj3) 
icon4.gif   VS, AG, KD; changement PhotoCathode 6x
lundi 5 mai : remise à l'air et démontage de l'ancienne cathode (Cu)

- Le faiscea laser est remis sur les réferences et le faisceau passe au travers de la cathode trouée (OK pour le Mg). NB. Le trou
de la cathode trouée fait la taille de la pastille de Mg. (cf. Photos)
Entry   Entered by Kevin Dupraz from 109.222.35.58 on Mon May 12 07:58:41 2025; shift du 12 mai 2025 : conditionnement GUN Screenshot_from_2025-05-12_08-02-15_vacuum_problem.pngScreenshot_from_2025-05-12_14-36-54.png
8h: mise en chauffe modulateur et frigo/chiller

- problème de lecture de vide (visible sur toute les jauges LINAC)

--> Réparé : un switch (de fin de ligne etait on et mis OFF)
Entry   Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025; Conditionnement 7x
Demarrage du conditionnement :

Température : 30.90 pour accorder le canon
20dB 19dB ..... 15.5dB à 16h20: vide travaille cf plot. 