HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 4 of 62  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   VK, IC. VM, LS; Work on the new optics 
Entry   VK, IC. VM; Reestablishing running conditions at 500.38 MHz scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png
Entry   VK, IC. VM; Srart of the beam physics measurements 14x
Entry   VK, IC. VM; Orbit correction, BLM in the Ring 7x
Entry   VK, IC. AL; Understanding of the shift in RF frequency 18x
Entry   VK, IC, DN, RC, JN; search for X-rays 
Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png
Entry   VK, AL, IC; Beam is stored 6x
Entry   VK VM; Shift 03 
    Reply   VK VM; RE: Shift 03 
    Reply   VK VM; RE: RE: Shift 03 
Entry   VK VC HG SC ME; commitionning 
Entry   VC/SC; Commissionning LE 
    Reply   VC/ND; RE: Q beam versus E laser 
Entry   VC/KD/SC; Faisceau linac 
Entry   VC/KD/HM/HG; Shift Linac + LT 25 aout 2022 
Entry   VC-VM; Shift summary Screenshot_from_2024-09-24_11-15-45.pngScreenshot_from_2024-09-24_11-21-49.pngScreenshot_from_2024-09-24_17-41-23.png
Entry   VC-MJ; Demarrage faisceau 
Entry   VC-KD; commitionning 10x
Entry   VC-CB-KD; run du 26 aout 2022 Etat_Machine_2022-08-26_17-37-28.png2022-08-26_17_34_13_tl_dg_sst_03-ccd_01_RAW_18.png
ELOG V3.1.4-395e101