Entry   Entered by Super Team from 134.158.195.141 on Thu Dec 16 09:53:20 2021; Demarage machine 
Les chillers sont démarrés et le modulateur en chauffe

Test de l'influence sur les erreurs de synchro
Entry   Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025; Data taking for ML  
Demarrage ACQ pour ML 

Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3 
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran 
Entry   ND, Anna K, Elene K; Data taking 26/01 7x
9:30 Warm-up

11:00 Modulator OFF => restart warm-up

Pb temperature section.
Entry   Entered by Super Team from 134.158.195.141 on Mon May 19 17:56:57 2025; Data : Sole scan, Q scan, random linac Yag_TL1 
Today's data :
- coil scan (+ images)
- Q3 scan
Entry   Entered by Super Team from 134.158.195.143 on Wed Sep 29 16:57:52 2021; Dark current First_DarkCurrent.tif
Pemiere image du courant d'obscurité. 

L'image est prise sur la station SST01 du Linac.
icon1.gif   Hayg; DS pour les températures des chillers 
Listes des Ds pour les températures des chillers


GUN : ER/HF/RAC.17-API.AI1/AI2
Section : ER/HF/RAC.17-API.AI1/AI1


Emplacements :


Sortie Chiller : 
Entry   Entered by Super Team from 134.158.195.141 on Wed Oct 27 16:48:32 2021; DS calc en défaut 
Les DS CALC sont en défaut et impossible de les relancer sur client3. Ils n'apparaissement pas dans astor.

Quelqu'un peut il résoudre le problème ?

 
Entry   Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 9 10:30:34 2025; DS ThomX_PhotoCathode using a lot of CPU Screenshot_2025-01-09_10-30-03.pngScreenshot_from_2025-01-09_10-32-26.png
The load on client5 is 29 making all operations slow.

Appently the DS ThomX_PhotoCathode is using a lot of CPU, slowing the rest.

 
Entry   Entered by Iryna Chaikovska from 134.158.89.93 on Tue Nov 23 13:12:22 2021; Cyclage quadrupoles Screenshot_2021-11-23_at_13.14.26.pngScreenshot_from_2021-11-23_14-09-27.pngScreenshot_from_2021-11-23_14-10-15.pngcylage_quad.pngcylage_quad2A.png
23/11/2021

We would like to cycle the quadrupoles in the linac. The procedure of the cycling was provided by Cynhia (attached). 

The magnet current should be ramped from 0 to IMAX , decreased down 0 and ramped back to IMAX three more times. Measurement current
Entry   Entered by Iryna Chaikovska from 134.158.195.143 on Tue Nov 23 10:56:34 2021; Cyclage dipole cylage_dipole.pngScreenshot_from_2021-11-23_12-16-04.pngScreenshot_2021-11-23_at_14.40.52.png
 For 22/11/2021

There is the remaining field from the dipoles in the TL. In order to go straight to the dump, the idea was to cycle the dipole to have 0 field.
We have tried the cyclage given by the ALBA peopel/Cynthia. Total time ~ 17 min. After two cycling, the remaining filed alwayd stays at ~20 G.
Entry   Entered by Iryna Chaikovska from 134.158.195.144 on Mon Mar 21 09:52:37 2022; Cyclage QUAD (TL) 
The cycling of the following quads ( to zero current) were tested. The corresponding cycling cuves were loaded in the DS (checked).

 TL/PS/cycleQP.01

TL/PS/cycleQP.02 
Entry   Emmanuel Goutierre; Conversion valeur moteur rotation solénoïde Conversion_mm_avec_angle_de_rotation_solenoide.pdf
Conversion des valeurs des moteurs de rotation du solénoïde

axmo_z

Diamètre de rotation : 552mm
Entry   Entered by Super Team from 134.158.195.142 on Thu Nov 25 17:07:16 2021; Contrôle terminé 
 
Entry   Entered by Super Team from 134.158.195.142 on Thu Nov 25 15:01:41 2021; Contrôle Radioprotection 
Les controles radioprotection ont commencé vers 14h50

Paramètres faisceau : 100 - 110 pC de charge, E=50 MeV et 10 Hz
Entry   M.O, M ELK, Hayg, Slava; Conditionnement section SC/ME/MO/VK/HG  Vide_Screenshot_2024-07-30_17-13-24.png
signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs
Entry   M EK, SC, ND, VC; Conditionnement section 6/06 1100V_3us_10Hz_attsec_16dB.png1120V_3us_10Hz_attsec_16dB.png
8h20 : mise en chauffe de modulateur

start frigo et chiller section

Pression SF6 2.6 bar
Entry   M.O, M ELK, Slava , Iryna; Conditionnement section 31/07 image_de_splitter_.pngbreakdown_25Hz_3us_09dB_14h52.png
signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs
icon8.gif   MEK, ND, VC, ; Conditionnement section 30/05 1.5_dB_2µs_5Hz_RF_breakdown.png1.1dB_2µs_5Hz_RF_breakdown_réseau_HF.png
08h30: set to stanby modulator

start frigo & chiller section

start cond. @ 2 dB ( Pis= 16 MW) @ 2µs & 5 Hz.
Entry   M ELK, Slava, Iryna, Hayg; Conditionnement section 29/07 Interlock_Sec_0.2dB_10Hz_3µs_15_19.pngInterlock_Sec_0.2dB_10Hz_3µs_15_35.png
signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs
Entry   M EK, KD, DN, HG; Conditionnement section 29/05 1dB_1us_5Hz_interlock.png
8h45: set to standby Modulateur

start Frigo et chiller section

start cond. @ 1.4 dB ( Pis=18 MW) @1µs & 5Hz vide <1.3 e-8 mbar