Toutes les notes concernant les Commissionning de ThomX, Page 43 of 62
Not logged in
Find
|
Last day
|
Login
|
Help
Full
| Summary |
Threaded
1238 Entries
Goto page
Previous
1
,
2
,
3
...
42
, 43,
44
...
60
,
61
,
62
Next
ID
Date
Author
Status
Type
Category
Important
Subject
Icon
Text
1162
Thu Dec 4 08:59:07 2025
Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025
Shift summary
LI | TL | Ring
Preparation/check of the 70 MeV WP for X-ray run
Goal: preparation and checking the machine
operation at 70 MeV and 40 MeV (ideally with
X-rays)
Draft
Thu Dec 2 14:54:52 2021
Entered by Super Team from 134.158.195.141 on Thu Dec 2 14:54:39 2021
Under Process
Linac
Laser | Linac Commissionning
Run Linac alignement
Laser:
Viktor est intervenu
pour tourner le hublot afin d'améliorer
la distribution du spot laser sur la photocathode.
440
Thu Apr 14 08:04:58 2022
Entered by Super Team from 134.158.195.141 on Thu Apr 14 08:04:41 2022
Under Process
Other
Diag | Electronique | Linac Commissionning
ThomX -commitionning diag
Demarrage modulateur et chiller 8h06
729
Thu Apr 6 12:57:29 2023
Entered by Super Team from 134.158.195.141 on Thu Apr 6 12:57:15 2023
Linac
Linac Commissionning
Faisceau Linac
12h57 Mise en chauffe modulateur et refroiddissement
canon et section
Vide dans l'anneau de l'ordre
557
Mon Sep 19 11:15:51 2022
Entered by Super Team from 134.158.195.141 on Mon Sep 19 11:15:38 2022
Under Process
Linac
LI
Démarrage technique
Démarrage modulateur et chillers
(MO)
Problème avec les icepap
538
Mon Sep 5 15:58:21 2022
Entered by Super Team from 134.158.195.141 on Mon Sep 5 15:58:08 2022
Under Process
Info
Linac Commissionning
Shift Linac + TL
15h30 : intervention equipe Diag : redemarrage
wavecatcher et DS associés
16h claquage qui stoppe la machine
602
Mon Oct 24 14:08:11 2022
Entered by Super Team from 134.158.195.141 on Mon Oct 24 14:07:57 2022
Problem
Linac Commissionning
positions en mm ont disparu sur lIHM SST
Les positions en mm ont disparu sur lIHM
SST !
est-il possible de les remettre
936
Mon Oct 7 09:31:13 2024
Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024
Fixed
Info
Linac Commissionning
pression SF6: 2.3 bar
(nb: redémarrage pc modulateur
demain mardi 8/10 à 9h00)
465
Mon May 23 09:12:08 2022
Entered by Super Team from 134.158.195.141 on Mon May 23 09:11:49 2022
Shift summary
RF D1
9h10 Démarrage modulateur et chillers
casemate ouverte
- 11H : casemate fermée
1072
Mon May 19 17:57:15 2025
Entered by Super Team from 134.158.195.141 on Mon May 19 17:56:57 2025
Under Process
Info
LI | TL
Data : Sole scan, Q scan, random linac Yag_TL1
Today's data :
- coil scan (+ images)
- Q3 scan
1067
Mon May 12 16:27:09 2025
Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025
Under Process
Linac
LI
Conditionnement
Demarrage du conditionnement :
Température : 30.90 pour
accorder le canon
7x
1047
Mon Mar 31 09:46:56 2025
Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025
Not Fixed
Problem
Vide
Problem with vacuum in the septum. TL-V3 and EL-V1 are closed.
09h45 Problem
with vacuum in the septum. TL-V3 and EL-V1
are closed.
720
Mon Mar 27 13:55:41 2023
Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023
Under Process
Info
LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning
Etat ThomX
Cavité FP a terminé son intervention
Mise sous vide possible cette après-midi
14h Intervention IHM cavité
387
Mon Mar 7 16:30:36 2022
Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022
Fixed
Problem
RF D1 | Linac Commissionning
PSS redemarre
Intervention Maher : PSS ok
853
Mon Mar 4 08:58:01 2024
Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024
Under Process
Shift summary
Ring | Ring Commissioning
Recomissioning of the SR, search for the revolution frequency
08h50 Start up of the machine
- Problem with the vaccum,
the valves around the RF cavity are down.
43
Mon Jun 28 15:53:17 2021
Entered by Super Team from 134.158.195.141 on Mon Jun 28 15:53:02 2021
Under Process
Linac
RF D1 | Linac Commissionning
Conditionnement de la section
Conditionnement de la section
Verification
et correction de la chaine de mesure
Ajustement
des atténuations des 3 voies :
42
Mon Jun 28 11:45:12 2021
Entered by Super Team from 134.158.195.141 on Mon Jun 28 11:24:57 2021
Under Process
Linac
RF D1 | Linac Commissionning
Attenuations
RF attenuations :
GUN
(Maximun atténuation) Limite Hard
= 1667 steps
Section
477
Mon Jun 13 09:50:13 2022
Entered by Super Team from 134.158.195.141 on Mon Jun 13 09:49:41 2022
Shift summary
Linac Commissionning
9h45 Mise en chauffe modulateur
11h : enfin du faisceau
Nous avons 50 uJ en sortie Diphragme
504
Mon Jul 11 14:56:39 2022
Entered by Super Team from 134.158.195.141 on Mon Jul 11 14:56:17 2022
Shift summary
RF Anneau
Arret à 15h00
239
Mon Jan 10 15:29:06 2022
Entered by Super Team from 134.158.195.141 on Mon Jan 10 15:28:51 2022
Under Process
Linac
SY | Linac Commissionning
Mise en route
Opération : HG, JNC
but
: alignement de la tête de machine.
Nous reprenons l'alignement du Laser,