  964   Tue Nov 19 08:20:29 2024 MJ VC KD RC DNUnder ProcessShift summaryLinac Commissionning Shift summary 19/11/2024 icon3.gif 

8h20 demarrage machine

iris 1.3mm
att 440
phase Qmax 280   110pC
QEmax 90pC Ekin 4.6MeV  Etot 5.1MeV
arret pour cause d'alarme sf6 sur le MPS - cle thomx 0 pour verif pression : 2.4 mBar

Redemarrage

ph ch max  273
ph energie max -50
Recette 20241115_16_28_32
passage section
passage dipole - phase section disp min 207
Mesure energie YagTL1 Ekin=51.0
Faisceau sur Yag_TL3
Injection anneau

Relock de la cavite apres changement freq cavite RF

IP retrouvee - scan FPC pour mesure taille electrons : le flux X voit les kicks faisceau
Data a mettre en mode presentable ...

fin de shift 18h30

 

 

 

 

 

 

 

 

 


 

 

Attachment 1: YAG_TL3_beam.png
YAG_TL3_beam.png
Attachment 2: injection_ring.png
injection_ring.png
Attachment 3: Fluo_det.png
Fluo_det.png
  969   Wed Nov 27 08:04:44 2024 VCUnder ProcessShift summaryLinac Commissionning Shift summary 27/11 

8h : mise en chauffe (laser, modulateur, frigo, chiller, cyclage)

9H30 y'a eu une intervention non signalée dans les fosses toutes les rondes sont tombées! (Maher referme)
recette # operation_feedback_et_LE 20241126_17_43_31(faisceau non centré sur TL/QP.01)
Q max ICT1 120pC (att 340 iris 1.3mm)

Phase Emax 178°
Phase section 209°

Esectionkin 51.25MeV

Recette Operation_500_0913MHz241116_10_07_15

test quad scan

le soft matlab QP1_TLSST1_thomx_dark_dim  n'est pas fiable
=> nouveau script python Quad scan (dans  commintionning scrits\linac\aimants )

Isoleno : 220 et 235A : data à analyser

Test aimant néodynium sur tube faisceau :

Qmax pas de soléno pas de steerer

mesure 1
sans aimant 

------ YAG Max proj. Pixels -----
YAG X : 503.4 +/- 0.48989794855663565
YAG Y : 314.5 +/- 2.29128784747792
------ BPMs en mm -----
BPM X : 1.8827291000000002 +/- 0.058164067948261663
BPM Y : 0.44133750000000005 +/- 0.021049867535212655

On a vérifé la deviation du faisceau avec l'aimant placé sur la bride avec COL2. trop puissant mais on a le principe.

Attachment 1: QP1_scan.png
QP1_scan.png
Attachment 2: QP2_scan.png
QP2_scan.png
Attachment 3: QP3_scan.png
QP3_scan.png
  971   Fri Nov 29 08:22:14 2024 VC, Carlos Buitrago, Sudhanshu Thakur, NDUnder ProcessShift summaryLinac Commissionning TP 29-11--2024 

demarrage chauffage 8H20

test nouveau code synchro 50Hz => ne fonctionne pas

Le nouveau code 25Hz ne fonctionne pas  => code installé 25Hz (juin 2024)

10:30 Beam ON

Loading recipe: LI_TL_RI_good_20241114_15_27_46

11:30 RF section phase: 191 deg, Att=2.56dB

Start position feedbacks...

Beam seen in the LE (but very weak).

Recipe saved as TL_test_20241129_12_06_24

12:15 Access in Fosse nord for ALTO => 1h30 break.

13:45 Restart beam

Difficulty to tune...

15:12 Extraction at t=92.3

LIB.01 was at -7.48 moved to -4

15:41 Ext kicker very stable

Beam seen in EL/DG/BPM.01

Beam intensity on the BPM is varying with a long period. We can not identify the source of the variation.

Transmission is about 20% but most of the losses probably occur in the EL.

17:00 Beam OFF

 

 

 

 

 

 

  983   Wed Dec 18 08:37:08 2024 VCUnder ProcessShift summaryLinac Commissionning summary shift Dec 18  

demarrage chauffage 8h45

le modulateur refuse de passer en mode standby

Nouvelle position laser photocathode : [6.374, 3.360]

Phase Qmax : 222 --> Phase Emax : 172

Energie : 51.98 MeV

Mesures Quad Scan vs Soleno à 50 MeV, Taille Iris (1 point uniquement) et @ QP7.

Charge : d'abord mieux puis decroit avec un max à 420 deg d'attenuation.

18h30 fin

 

 


 

  989   Tue Jan 7 08:40:58 2025 VC MJ HGUnder ProcessShift summaryLinac Commissionning Shift summary 07/01/25 

demarrage machine 8h30
pB serveurs/IHMs
vide (peg) (pas de communication)
Camara laser (impossible de lancer l'IHM )
RF plots (pas de raffraichissement (sauf Pr gun)  dans RF plots alors que les  DS fonctionnent)
vide (peg) (pas de communication) === OKExternal_trigger_multi

Camara laser  ==== résolu sur PC client 2 (sur client 1 ça marche pas)  (la caméra ext trigger en mode externe LI/OP/LAS2  acq_trigger_mode  "External_trigger_multi"
Redpitaya redemarées avec bouton Camera power
Client 1 redémarré.... pB résolus..

Realignement laser photocathode
x=6.358
y=3.406

Passage section

Recette 20241219_18_13_51 charge --> QUAD 1 et 3 completement desalignes
Alignement QUAD 1 et 3

QUAD SCANS pour
   ** sol 230 et sol 250
   ** Q1 Q3 = 0 et  Q1 Q3 au val nominal
   ** Iris = 0.5 (charge 35 pC), 1.3 (charge 100 pC) et 5 (charge 215 pC)
   2 scan differents pour X et Y - data dans data/shared

Passage TL jusqu a SST03
Mesure fonction dispersion en fonction de la phase section sur les 4 bpmTL et YAG SST03
Quad scan QP7 Iris = 0.5, 1.3 et 5

 

 

 

 

 

 

 

 

 

 

 

  1032   Tue Mar 11 14:31:06 2025 VMUnder ProcessShift summaryLinac Commissionning   

14h31 Start ThomX/ Modulator, Frig, Laser

14h37 Cycling all magnets, Chillers started

15h34 HV is 'On'

There are problems with the servers. Therefore, some tools are not working: Trends,  Camera Laser and so on.
Servers restarted, we also used script from Kevin to restart properly DSs.
Beam Charge : 70 pC !!! RF gun phase is set to 109 dg.

17h30 Linac steerers H [0.67 -2.77], V [-2.95 3.19], RF Gun phase   214 dg. Att. 2.47 dB.

Measure dispersion in the TL

18h45 QP4 - QP7 set to 0

Screenshots of TL orbit for different Att.

18h53 HV is 'OFF', Stop thomX

 

Attachment 1: Screenshot_from_2025-03-11_15-45-29.png
Screenshot_from_2025-03-11_15-45-29.png
Attachment 2: Screenshot_from_2025-03-11_18-43-44.png
Screenshot_from_2025-03-11_18-43-44.png
Attachment 3: Screenshot_from_2025-03-11_18-42-52.png
Screenshot_from_2025-03-11_18-42-52.png
Attachment 4: Screenshot_from_2025-03-11_18-42-15.png
Screenshot_from_2025-03-11_18-42-15.png
Attachment 5: Screenshot_from_2025-03-11_18-41-47.png
Screenshot_from_2025-03-11_18-41-47.png
Attachment 6: Screenshot_from_2025-03-11_18-41-20.png
Screenshot_from_2025-03-11_18-41-20.png
Attachment 7: 2025-03-11_17_32_20_tl_dg_sst_01-ccd_01_RAW.png
2025-03-11_17_32_20_tl_dg_sst_01-ccd_01_RAW.png
Attachment 8: 2025-03-11_17_32_06_tl_dg_sst_01-ccd_01_RAW.png
2025-03-11_17_32_06_tl_dg_sst_01-ccd_01_RAW.png
Attachment 9: 2025-03-11_17_30_11_li_dg_sst_01-ccd_01_RAW.png
2025-03-11_17_30_11_li_dg_sst_01-ccd_01_RAW.png
  1074   Wed May 21 12:16:11 2025 MJ HG Shift summaryLinac Commissionning Axes Q1Q3 et Section apres chang cathode 

iris 0.5
100 pC
ph ch max 259

** Align SOLENO (courbe violette pj)

dtx 0.9645
dtz 3.3546
drx 10.5272
drz -4.2522

Ph -50
soleno 230

** Alignement Q1Q3 avec Q2=0

str1H 0.58
str1V -2.32
str2V 2.67
str2H -2.91

------ BPMs en mm -----
BPM X : 2.49165875 +/- 0.0264994214802
BPM Y : -1.58554115 +/- 0.0471457516329
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 196.0 +/- 32.9590655207
YAG Y : 301.8 +/- 1.12249721603
------ BPMs en mm -----
BPM X : -0.8536445 +/- 0.0224653251045
BPM Y : 0.13572405 +/- 0.0184326064258

=============================

------ BPMs en mm -----
BPM X : 2.47926945 +/- 0.0390444695309
BPM Y : -1.5873233 +/- 0.0378935718006
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 194.3 +/- 22.8365934412
YAG Y : 298.15 +/- 2.59374246987
------ BPMs en mm -----
BPM X : -0.85523945 +/- 0.0164860398807
BPM Y : 0.13411955 +/- 0.0205878360725

** Alignement Q1Q3 avec Q2=3.40

str1H 0.61
str1V -2.33
str2V 2.62
str2H -2.94

------ BPMs en mm -----
BPM X : 2.3799488 +/- 0.547166562882
BPM Y : -1.50053775 +/- 0.345440854739
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 391.45 +/- 0.497493718553
YAG Y : 260.85 +/- 0.572276157113
------ BPMs en mm -----
BPM X : -0.1347845 +/- 0.0147763972317
BPM Y : 0.3033404 +/- 0.0231588279526

==================================

------ BPMs en mm -----
BPM X : 2.50198645 +/- 0.0483311705284
BPM Y : -1.58757735 +/- 0.0292616993291
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 392.95 +/- 0.217944947177
YAG Y : 261.75 +/- 0.887411967465
------ BPMs en mm -----
BPM X : -0.15454465 +/- 0.0248612337109
BPM Y : 0.25563065 +/- 0.0172710036254

** Alignement SECTION - valeurs elog 1002 

str1H 1.64
str1V -1.94
str2V 2.87
str2H -3.77

------ BPMs en mm -----
BPM X : 3.7212973 +/- 0.0321787746381
BPM Y : -1.1086051 +/- 0.035323561294
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 272.85 +/- 13.7886728876
YAG Y : 63.95 +/- 2.24666419387
------ BPMs en mm -----
BPM X : -1.40359675 +/- 0.0180544044346
BPM Y : 3.44180095 +/- 0.0179048640807

=====================================

------ BPMs en mm -----
BPM X : 3.73180015 +/- 0.0385873207716
BPM Y : -1.103907 +/- 0.031825702561
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 273.3 +/- 9.61821189203
YAG Y : 65.0 +/- 3.25576411922
------ BPMs en mm -----
BPM X : -1.44032525 +/- 0.0264990471317

==========================================

** Affinage alignement horizontal section

str1H 1.0
str1V -1.94
str2V 2.87
str2H -3.5

phas section de 208 a 254 ==> bouge de 1/2 carreau sur le yagtl1

------ BPMs en mm -----
BPM X : 2.99469935 +/- 0.0349682538158
BPM Y : -1.1059392 +/- 0.0299572389909
-------------  TL -------------------
------ YAG Max proj. Pixels -----
YAG X : 214.25 +/- 1.9461500456
YAG Y : 38.6 +/- 11.1462998345
------ BPMs en mm -----
BPM X : -2.7490436 +/- 0.0227112488283
BPM Y : 3.96375725 +/- 0.023805124412

 

Nouvelles mesures 22 mai

Essai 1

-------------  LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 543.673067141 +/- 0.0
YAG Y : 151.648274933 +/- 0.0
------ YAG Max proj. Pixels -----
YAG X : nan +/- nan
YAG Y : nan +/- nan
------ BPMs en mm -----
BPM X : 2.4632059 +/- 0.0316530005069
BPM Y : -1.6726479 +/- 0.0265819058438
-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 369.257120833 +/- 1.56616565007
YAG Y : 273.547982641 +/- 0.683787323708
------ YAG Max proj. Pixels -----
YAG X : 334.3 +/- 2.96816441593
YAG Y : 271.1 +/- 2.66270539114
------ BPMs en mm -----
BPM X : -0.1525054 +/- 0.0236681262596
BPM Y : -0.0879924 +/- 0.0200531052269

 

Essai 2 (pour Xcheck)

-------------  LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 543.673067141 +/- 0.0
YAG Y : 151.648274933 +/- 2.84217094304e-14
------ YAG Max proj. Pixels -----
YAG X : nan +/- nan
YAG Y : nan +/- nan
------ BPMs en mm -----
BPM X : 2.4823413 +/- 0.0608051287237
BPM Y : -1.65147505 +/- 0.0539867056102
-------------  TL -------------------
------ YAG LimaBPM Pixels -----
YAG X : 364.379556839 +/- 1.46350878787
YAG Y : 272.024693198 +/- 1.50274460733
------ YAG Max proj. Pixels -----
YAG X : 329.95 +/- 4.25998826289
YAG Y : 266.85 +/- 2.26439837484
------ BPMs en mm -----
BPM X : -0.1913847 +/- 0.0317457400782
BPM Y : -0.08146295 +/- 0.0201487667773

 

STR1 = [0.59, -2.40]

STR2 = [-2.89, 2.68]

Attachment 1: Sole_Align.png
Sole_Align.png
  Draft   Fri Jun 13 08:41:04 2025 VM,ICUnder ProcessShift summaryLinac Commissionning   

08h40 ThomX was started: Modulator, Frig, Laser

08h45 Chillers were started, cycling all magnets

09h56 HV is 'ON'

10h14 There is problem with Wavecatchers (see screenshot). Even dark current is absent

Wave catcher power supply 2 (5V) is dead... changed temporaly with a spare. (solved)

There is problem with the section phase shifter

12h10 All problem fixed, beam in the ring 50 MeV

Going to 40 MeV

13h25 Sect. Att. 4.03 dB, Phase 203 dg., RF Gun phase 166 dg. Charge -85 pC, receipt 20250613_13_25

Going to 43.7 MeV

14h20 Sect. Att. 3.5 dB, Phase 210 dg., Gun phase 162 dg  TL/BPM2 X=-1.5 mm, Receipt 20250613_14_19_57

16h00 35 MeV. Sect Att. 4.98 dB, phase 202 dg. Receipt for the linac 

16h10 HV  on standby Access to the bunker

Attachment 1: health_check_Diag_charge_wavecatcher_2025_06_13_10_13.png
health_check_Diag_charge_wavecatcher_2025_06_13_10_13.png
Attachment 2: Screenshot_from_2025-06-13_11-11-22.png
Screenshot_from_2025-06-13_11-11-22.png
Attachment 3: Screenshot_from_2025-06-13_14-31-57.png
Screenshot_from_2025-06-13_14-31-57.png
Attachment 4: Screenshot_from_2025-06-13_14-31-45.png
Screenshot_from_2025-06-13_14-31-45.png
  1089   Wed Jun 18 12:45:49 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025Under ProcessInfoLinac Commissionning Linac measurement + phase +  
  • Phi Qmax ; 324° : Phi Emax : 274°
  • Qmax : 70-80 pC (Att : 290°) and 300 pC (Att : 420°)
  • Recipt : 50MeV_100pC_20250527_14_10_19.txt
  • Att Section : 2.45 dB, phi min disp : 209°
  • Quad align done

13h20 : Pause

13h30 ND operateur.

Acces controle

Alignement ligne streak linac

14h50 Laser alignement.

Travail sur chassis laser en cours et prioritaire.

Allumage kicker injection

La voie 19 du generateur de retrad des diags etait toujurs connectee au scope avec le smemes regalges que la voie 8.

On remet les wavecatcher sur les reglages anterieurs.

15h40

img5=HV

img6=Trig

Beam ON

On observe pas de probleme sur les ICT.

Charge IC22 / ICT3 non lue soucis WC ...  ? On regarde Spsum sur BPM pour voir que la charge reste constante, les positions sur TLBPM2 ne bougent pas ( X=0.1 Y =2)

Trend de la phase cool

 

pas de mesure de longueur aujourd'hui broken heart

Quelques mesure

Goal: bunch length measurement in the transfert line to improve the model. Parameters to vary : phase (Section) , charge, laser size (? should not play a role), laser length (see with Viktor)

Attachment 1: Emit_QP7_phiS_218.png
Emit_QP7_phiS_218.png
Attachment 2: QP3_230A_Emit.png
QP3_230A_Emit.png
Attachment 3: QP3_250A_Emit.png
QP3_250A_Emit.png
Attachment 4: QP7_emit_phi206.png
QP7_emit_phi206.png
Attachment 5: QP7_Emit_phi_minDisp_208.png
QP7_Emit_phi_minDisp_208.png
Attachment 6: Phase_Laser.png
Phase_Laser.png
  1112   Wed Sep 3 07:47:42 2025 KD VC HG JMUnder ProcessShift summaryLinac Commissionning shift du 3 septembre 2025 

7h47: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)
8H50 demarrage machine
load recette godd_20250821_17_14_40
faisceau ligne dispersive (phase canon 272° phase section 247° DP.01 253.77A image 2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW)
quad scan

10H Moddulateur en standby PPS PA exploi OFF

14h30: Mesures d'émittance à QP3 pour différentes conditions de charge 100pC et 170 pC, fits et scans dans le dossier today
Soucis Iris : Moteur en erreur, valeur 1.35 mm (pas sûre ...)
but des mesures : vérifier le code Matlab (Viktor)
A faire : Xcheck avec le code py (Hayg)
Autre aspect : faire attention aux images saturées, ça change le scan, et donc l"emittance calculée.

17h45 : fin du shift, Kevin va venir voir le shutter.

 

 

 

 

==> il faut réaligner la ligne UV, charge max < 200pC

Attachment 1: 2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW.png
2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW.png
  1122   Wed Sep 17 09:22:32 2025 ND, VCUnder ProcessShift summaryLinac Commissionning shift 

Demarrage chauffage 9h30

branchement DEG4

Verification DEG4: Reglages OK.

Cycle termine sans plantage.

Machine laissee en Chauffe pour les operateurs de la journee.

 

 

 

 

 

 

  1133   Fri Oct 3 09:08:29 2025 ND VCUnder ProcessShift summaryLinac Commissionning Shift summary 

Demarrage machine 9H

test cyclage: OK (relecture courant parfois NAN)
Correction des fenetre d'intégration de mesure de charge des ICTs
Modification des coefficients des BPM TL 1 2 3 4 pour prendre en compte les  attenuations des cables  
Attention les coefficients doivent etre rechargés à chaque redemarrage du libéra
Libera 2 (TL) plante très souvant
 Arret machine 17h45


 

  1136   Mon Oct 13 13:40:05 2025 HaygUnder ProcessInfoLinac Commissionning Emittance QP3  

QP3 scan

vary Soleno
Iris 1mm ATT 400 (150 pC)

 

 

 

  1147   Fri Nov 7 18:45:54 2025 Entered by Super Team from 134.158.205.4 on Fri Nov 7 18:45:38 2025Under ProcessShift summaryLinac Commissionning   

08h34  Warm-up ThomX: Modulator, Laser, Fridge

08h40 Chillers were started, cycling all magnets

09h40 HV is ON but cannot trig because the interlock on low SF6 pressure. Assistance asked.

10h40 Modulator set to standby, because nobody responded.

SF6 pressure was fixed.

14h00 Beam started. The laser iris was set to 2 mm because at 1.3 mm beam was with two cores at the linac exit.

Receipt used: all_20251106_13_58_04

RF gun phase 233 dg. Sect. phase 211 dg., Motor position of the sect. Att. about 1700 steps to get 50 MeV. Charges (BPMs):  -110 pC, -110 pC, -113 pC, -113 pC. Do not use calc/li/hfi/att.01-mot.01 to adjust section RF power in dB, use li/hfi/att.01-mot.01 instead.  Level of a signal from the section output should be about -0.125 V at 50 MeV.

14h16 Beam is in the ring, RF 100 kV. TL/BPM02 X=-1mm.

BBA for a vertical direction.

BPM V [1 1] V offset = -0.054 mm

BPM V [1 6] V offset = 0.165 mm

BPM V [1 7] V offset = 0.025 mm

BPM V [1 12] V offset = 0.366 mm

16h29 Stop ThomX

  

Attachment 1: Screenshot_from_2025-11-07_16-24-10.png
Screenshot_from_2025-11-07_16-24-10.png
Attachment 2: Screenshot_from_2025-11-07_16-24-35.png
Screenshot_from_2025-11-07_16-24-35.png
Attachment 3: Screenshot_from_2025-11-07_16-23-58.png
Screenshot_from_2025-11-07_16-23-58.png
  1151   Tue Nov 18 07:56:42 2025 KDUnder ProcessShift summaryLinac Commissionning shift du 18 novembre 2025 

7h50: mise en chauffe en remote de la machine (laser, frigo/chiller, cyclage)

==> le modulateur ne répond pas aux commandes (il est peut être en local) ==> Ok le modulateur était bien en local (Maher est intervenu)

 

 

*** intervention laser (9h 11h) ***

* Pas de perte particulière sur la ligne observée, le faisceau  ne semblait pas non plus avec une forme dégradée. 

* nettoyage des optiques dans la salle laser, ajustement du téléscope de la casemate (pas d'effet notable mise à part une perte d'intensité sur la caméra sans perte de puissance côté canon)

** Mesure Laser PC **

- Sortie Laser: 250 uJ (en baisse)

- Injectée ligne transport: 235 uJ

- Sortie ligne transport: 188 uJ

- Sortie Iris (ouverture max): 175 uJ

- Injectée canon (iris max, 420 pas atténuateur): 105 uJ 

- Sortie iris (1.3mm): 51 uJ

- injectée canon (iris 1.3 mm, 420 pas) : 43 uJ

Attachment 1: 2025-11-18_10_56_51_li_op_las_02_RAW.png
2025-11-18_10_56_51_li_op_las_02_RAW.png
  1166   Wed Dec 10 10:45:33 2025 Entered by Super Team from 134.158.195.141 on Wed Dec 10 10:45:16 2025Under ProcessShift summaryLinac Commissionning   

8h30 : machine started on remote
50 MeV operation.
Problem with Yag-TL camera
--> try power off
Worked cool
Ajusterment retard camera : -20 µs / Gain 0 / exp 0.001s

Viktor : dispersion measurement.

Q-scan QP7, QP3

 

  1175   Tue Jan 6 08:00:18 2026 KDUnder ProcessShift summaryLinac Commissionning shift du 06 janvier 2026 

8h: mise en chauffe en remote (cyclage, modulateur, frigo/chillers, laser)

problème lancement cyclage RI-C1: QP.04, QP.09 et QP.10

Sole 238
Scan_QP0118h27.txt :

  E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.14313799542146532, 0.06033515695599282, 0.... 3.096494 0.031648 22.187073 -5.072226 1.204642 False Y QP1 96.810661

136.501018

E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.2899399170657115, 0.19572917921414953, 0.1... 1.749609 0.017882 17.973956 -3.768844 0.845901 False X QP1 109.374139

137.033452

recette pour les quads : /tmp_mnt/data/shared/recipes/saved/Studies_BMAD_Sole_Bunch/recipe_recipe_TL_Sole238_all_20260106_18_11_32.txt 

Solé 242A:

  E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.6426336031073789, 0.40883800851193447, 0.2... 1.121272 0.01146 78.079217 -13.863508 2.47437 False X QP1 107.263568 134.6379
E Sigma norm_emit emit beta alpha gamma error plane QP Q_LI Q_TL
0 50 [[0.7928102298373866, 0.3730560287510153, 0.11... 6.338747 0.064785 43.69964 -8.519464 1.683796 False Y QP1 107.52352 128.368469

recette :  /tmp_mnt/data/shared/recipes/saved/Studies_BMAD_Sole_Bunch/recipe_recipe_TL_Sole242_all_20260106_19_08_32.txt

 

en PJ : images à QP7 pour les 2 recettes

Attachment 1: 2026-01-06_19_17_58_tl_dg_sst_03-ccd_01_RAW.png
2026-01-06_19_17_58_tl_dg_sst_03-ccd_01_RAW.png
Attachment 2: 2026-01-06_19_17_20_tl_dg_sst_03-ccd_01_RAW.png
2026-01-06_19_17_20_tl_dg_sst_03-ccd_01_RAW.png
  287   Mon Jan 31 15:13:47 2022 Entered by Christelle Bruni from 134.158.195.142 on Mon Jan 31 15:13:29 2022Under ProcessQuestionLaser | SY | Linac Commissionning correlation phase salle laser/faisceau 

Démarrage modulateur sans problème

zero BPM correspond aux zero de charges, mais photodiode toujours présente. Est ce autre chose ?

La phase n'a pas bougé au niveau faisceau max charge à 246 degrés. Par contre, le pointé ainsi que la forme bouge.

Problème de stabilité de pointé du laser ?

Interlock modulateur à 16h46, remise en chauffe

Mesure stabilité laser  (stabilite_laser sous jupyter) :

mean x 7210.87 µm    +/- 44.26 µm
mean y 3573.02 µm    +/- 67.77 µm
FWHM x 1534.41 µm    +/- 116.67 µm
FWHM y 903.76 µm    +/- 49.75 µm

Stabilité P2P :

  380   Wed Mar 2 11:57:59 2022 CB/VCFixedInfoLaser | SY suivi mesure de phase 

taurustrend test/cc/osc.01/measurement1

A mettre dans l'archivage

  277   Fri Jan 21 16:45:10 2022 Entered by Super Team from 134.158.195.141 on Fri Jan 21 16:44:51 2022Under ProcessInfoLaser | RF D1 | Linac Commissionning arret 

arret des chillers section et canon + frigo

arret du laser

arret modulateur

 