| ID |
Date |
Author |
Status |
Type |
Category |
Important |
Subject |
Icon |
|
926
|
Fri Sep 27 10:52:33 2024 |
VC-MJ | Fixed | Shift summary | Linac Commissionning |
|
Demarrage faisceau | |
faisceau... sur Li SST0.1
position laser était à 5.1 2.55 (on ne sait pas pourquoi)
mise à la nominale (5.4, 2.34)
pB synchro réapparait....
|
|
927
|
Fri Sep 27 17:03:34 2024 |
MJ HG | | Shift summary | Linac Commissionning |
|
Redemarrage machine apres probleme de synchro et/ou alim | |
Apres un OFF/ON des baies alim et des transfo + baie synchro OFF/ON la synchro semble etre de nouveau alive
16h15 Chauffe Klystron
ICT bpm et yag semblent ne pas se declencher au bon moment
Impossible de faire quoi que ce soit. On ne trouve pas le bon fichier delays diags etc ... Meme apres appel tel avec Vincent.
Bon we
|
| Attachment 1: ICT.png
|
 |
| Attachment 2: bpmLI.png
|
 |
|
928
|
Mon Sep 30 09:52:38 2024 |
VC MJ | Under Process | Problem | Linac Commissionning |
|
remise en route d'une synchro valide | |
9h50 démarrage chauffage Klystron
la sortie d'urgence porte casemate a été appuyé ce matin.... ça bloque la ronde
16H... le timing a sauté pendant quelques secondes et est revenu tout seul
16H15 le 50Hz c'est mis à mal fonctionner ... replug des sondes dans le chassis (scope R&S 162.168.229.80)
tout refonctionne...
160pC à charge Max (67°)
Passage section : charge transmise a 100%
* seulement pour SOLENO 220-230
* qq soit l'alignement (section ou quads)
* qq soit l'ouverture d'iris.
Sautes de faisceaux toujours presentes toutes les 2-3 minutes
Fin de shift.
Synchro OK pour demain matin
|
|
931
|
Wed Oct 2 08:08:52 2024 |
VC HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
demarrage chauffage 8h10
visite étudiant M2 => visite fini
vanne vide anneau
scan str LI 1 et 2 pour trouver l'axe section (script scan_IRIS_section.py)
on scanne avec un point fixe en sortie de section. on deplace le point de sortie pour avoir une symétrie cylindre sur la transmission de charge dans la section:
(c
# Scan entrée Iris
STR1_init = [0.93,-1.1]
STR2_init = [-2.86, 1.86]
# nouveau vertival pour se décaler de 21 à 40 en sortie vertical $
# STR V : -1.4037467103479566, 2.7489454498601917)
# Scan entrée Iris
STR1_init = [0.93,-1.40]
STR2_init = [-2.86, 2.75]
on passe en scan horizontal...
reduction de l'iris à 0.5mm
best point sortie section (sur script) (V21H-85) pour avoir une transmission de charge à symétrie cylindrique
=> on obtient un centre iris entrée section de (H0 V-10)
premier scan point fixe entrée (obligé de mettre TL/str.01 à -A10
optimisation transport avec charge:
He -0.3 Ve -10 Hs -88 Vs 20
correspond à
Li STR.01H 1.3
Li STR.01V -2.79
Li STR.02H 3.76
Li STR.02V -3.95
|
|
932
|
Thu Oct 3 08:27:17 2024 |
VC MJ HG | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
8h30 demarrage chauffage
pB de vanne vide (qui est fermée et en mode local...)
shutter laser sécu PSS en défaut (orange) impossible de le passer vert...
pour le strap MPS- Li TL EL=> si on arrete les dipoles le tir est interdit => strap ne fonctionne pas!
Passage en mode LInac
Mesure energie canon avec str1H E_kin=4.6 (calib modifiée CH : 39.4e-6 m
Prise de donnees
Essais
GUN passage à 0 dBpour essayer d'augmanter l'energie à 5 MeV mais il claque énromément ... 0.25 idem 0.3 plus stable
0.1 dB : E 4.8 MeV claquages nombreux mais se stabilise.
|
|
933
|
Fri Oct 4 08:31:27 2024 |
vc, VM,VK, IC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
démarrage chauffage 8h30
9h45 demarrage faisceau
12h Ring studies
RF Cavity on. Turns off afre 1 min by it elf reduces power to 0
Several times press start - RF Cavity OK
Orbit correction.
Dispersion measurements.
Stable storage.
slooooow computer
18.05 End shift.
|
| Attachment 1: Screenshot_from_2024-10-04_14-53-14.png
|
 |
|
934
|
Fri Oct 4 12:26:21 2024 |
MJ | | Shift summary | Linac Commissionning |
|
Charge vs soleno : OK ce matin | |
Ce matin la charge est parfaitement transmise de soleno 210 a 250, et decroit tranquillment ensuite. Je n'ai pas reussi a faire fonctionner le script donc j'ai pris un screenshot
12h07 sol=300
12h08 sol=280
12h09 sol=260
12h10 sol=250
12h11 sol=240
12h12 sol=230
12h13 sol=220
12h14 sol=210
12h15 sol=200
12h16 sol=190
12h17 sol=170
12h18 sol=150
12h19 sol=130
Les conditions etaient :
* alignement "quads"
* canon 0.5 db
* iris=1.3
--> Pb de shutter "orange" et/ou "faussement vert " les jours precedents ??
|
| Attachment 1: charge_vs_soleno_screenshot.png
|
 |
|
936
|
Mon Oct 7 09:31:13 2024 |
Entered by Super Team from 134.158.195.141 on Mon Oct 7 09:30:50 2024 | Fixed | Info | Linac Commissionning |
|
| |
pression SF6: 2.3 bar
(nb: redémarrage pc modulateur demain mardi 8/10 à 9h00) |
|
938
|
Tue Oct 8 15:29:17 2024 |
VC MJ HG JN | Under Process | Shift summary | Linac Commissionning |
|
Shift summary | |
Pas de charge (20 pC Q max) car shutter PSS orange
Apres plus de 30 minutes : shutter vert enfin ...
charge canon 105 pC
Charge transmise 120 pC
influence de Li str2 sur les bump après la section
Premier test avec
str2 à zéro mais allumé
str1 H -2.5 V 0.62
Il n'y a plus que de petits sauts sur bpmTL1 (~ 0.1 mm) cf screenshot
yagTL1 490 / 318
bpmTL1 1.81 / -1.19
17h32 avec Align QUADS (screenshot kicks)
YagTL1 365 / 274
bpmTL1 0.07 / 0.02
YagTL1 326 / 247
bpmTL1 -0.04 / 0.34
YagTL1 368 / 230
bpmTL1 0.60 / 0.70
YagLI faisceau pas sur l'ecran
bpmLI 4.23 / -1.12
18h15 avec Align section + str3V = -5 (screenshot kicks)
YagTL1 274 / 115
bpmTL1 -0.87/ 2.96
YagTL1 261 / 137
bpmTL1 -1.16 / 2.51
YagLI faisceau pas sur l'ecran
bpmLI 4.73 / -2.77
18h35 Acces casemate avec JN pour mettre un fil de masse entre les brides ICT1 pour le courcicuiter
19h appel Maher car la ronde est cassee (sans doute un arret d'urgence appuye sans s en rendre compte). Merci Maher !!!
19h25 Reprise de l'etude kicks faisceau
La tresse de massse sur ICT ne change rien aux kicks (screenshot)
Steerers 20h02
H1=-1.04 V1=0.10 H2=-0.82 V2=0.66
Faisceau sur yagtl1 (screenshot)
Bpmtl1 presque plus de kicks en horizontal - kicks en vertical toujours presents (screenshot)
bpmLI 0.17 / 1.52
yagTL 596 / 303
bpmTL 3.61 / 0.01
Steerers 20h25 : j'essaie de diminuer encore les str horizontaux
H1=-0.54 V1=0.10 H2=-0.52 V2=0.66 + STRLI_H = -10 pour que le faisceau reste sur le yagTL1
bpmLI 0.8 / 1.53
yagTL 628 / 269
bpmTL 5.48 / 0.73
yagLI 404 / 211
20h50 fin de shift |
| Attachment 1: bpmTL1_str2_0_str1_H-2.5_V0.62.png
|
 |
| Attachment 2: bpmtl1_alignQUADs.png
|
 |
| Attachment 3: bpmtl1_align_SECTION.png
|
 |
| Attachment 4: bpmtl1_align_SECTION_masseICT.png
|
 |
| Attachment 5: yagtl1_str_20h02.png
|
 |
| Attachment 6: bpmtl1_str_20h02.png
|
 |
| Attachment 7: bpmtl1_str_20h25.png
|
 |
|
939
|
Wed Oct 9 08:04:20 2024 |
shift team | Under Process | Shift summary | Linac Commissionning |
|
Production de rayons X | |
demarrage machine 8h
11h: modulateur passe sur "OFF" sans raison apparente.
12h: faisceau en route
Programme :
* injection faisceau dans l'anneau
Phase canon charge max (86°)
Energie Max (36°) avec 100pC
- On essaye d'optimiser l'injection et le stockage car le stockage n'est pas "bon" beaucoup de perte
* Stockage puissance Laser
* Recherche des rayons-X en phase (500MHz, 33MHz)
- Pas de rayons-X visible à première vue. On bouge la table hexapode pour trouve le faisceau
- On scan la table Optique en vertical (en mode désynchro). On trouve les rayonsX vers -1.85mm en Z
- On essaye de synchroniser
Phase 500MHz (ER/CA/RAC.05-API.AO1/A06), 6.2V
Phase 33MHz 265°
Delay scope Laser/Trig : 1.25ns
On fait un scan vertical de la table en désynchronisé (impossible en synchrone)
(~80 pC injecté et ~ 83kW dans la cavité)
* Mesure flux, stabilité spectre des rayons-X
Le flux est assez instable à cause de la machine et ou des jitters de synchronisation (on mesure ~ 0.6-0.7 10^10 ph/s : 15 - 20 10^4 pA)
Vers 18h :
La charge est devenue tres instable vers 18h car le feedback ne fonctionnait plus (etait coché pourtant). On l'a redémarré. Stabilité charge revenue apres.
Idem TBT sum trend plus stable après.
|
| Attachment 1: Scan_vertical_recherche_rayonsX.png
|
 |
| Attachment 2: Synchronized_Xray.png
|
 |
| Attachment 3: tbtsum_trend_all.png
|
 |
| Attachment 4: charge_18h.png
|
 |
|
941
|
Wed Oct 23 08:15:09 2024 |
KD | Under Process | Shift summary | Linac Commissionning |
|
shift du 23 octobre 2024 | |
8h15: mise en chauffe de la machine (en remote)
11H HT ON! recette goog_20241009_17_38_49
Phase E max : 61° Q 85pC
12h15: test canon fini (le canon semble conditionné et ne claque pratiquement plus)
**** Programme ****
- Verifier la dépendance de la position du courant d'obscurité à l'énergie canon
On baisse l'atténuateur à 0dB. image à 0.5 et à 0dB
Il ne semble pas y avoir de mouvement du barycentre en fonction de l'énergie.
- aller à 0dB d'attenuation
Fais, il y a quelque claquage, on laisse conditionné gentillement. à 0dB l'énergie est de 5.3MeV (kinétique), 5.8 MeV totale
|
| Attachment 1: bary_11h59.png
|
 |
| Attachment 2: 2024-10-23_11_25_24_li_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 3: 2024-10-23_11_45_23_li_dg_sst_01-ccd_01_RAW.png
|
 |
|
942
|
Wed Oct 23 17:30:58 2024 |
Entered by Super Team from 134.158.195.141 on Wed Oct 23 17:27:14 2024 | Under Process | Shift summary | Linac Commissionning |
|
| |
Gun phase 50 dg., At 0.5 dB; Sect phase 230 dg. At 2.65 dB; Sol. 220 A, Gun charge -131 pC, Linac -112 pC, TL -120 pC.
Linac steerers: H [2.2 -3.83], V [-1.46 2.1].
It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure.
It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. It is unpossible to check TL/BPM2 with the TL/SST.02 camera because a lot of bright spots on the image.
17h50 end of the shift. |
| Attachment 1: DispersionTLBPM2.png
|
 |
|
943
|
Thu Oct 24 07:15:40 2024 |
KD, VM | Under Process | Shift summary | Linac Commissionning |
|
shift du 24 octobre 2024 | |
7h15: mise en chauffe machine (modulateur, laser, refroidissement, cyclage), en remote
Gun Att. = 0.0 dB, Phase=47 dg., Sect. Att. = 2.555 dB, Phase = 206 dg.
Gun Charge -130pC
Linac steerers H [1.94 -4.0]; V [-1.83 2.25] to align with QP1 - QP3
RCDS script: /tmp_mnt/data/shared/commissioning_scripts/Ring/Injection_Scans/First_Turns/RCDS/study_RCDS/scan_RCDS500_7Operateur.m
Beam injected to the ring W/O RF. Recipe all_20241024_11_16_58 see screenshots.
Dispersion measurement with Attenuator
About 13h50 beam ustable at TL/BPM04. X position correlates with vertical position at TL/BPM02
14h22 modulator on Standby
A PERLE delivery occured in the afternoon. The entrance door is no longer working...
17h10: Modulator on trig: No RF signal!
Laser position is jittering a lot... Fixed by openinng/closing the gate
Still no RF signal on RF plot...
17h30 Stop ThomX
|
| Attachment 1: TbTSumW_O_RFScreenshot_from_2024-10-24_13-18-57.png
|
 |
| Attachment 2: Osc_W_O_RFScreenshot_from_2024-10-24_13-21-59.png
|
 |
| Attachment 3: Orbit_WO_RF_TLBPM2plus4mmScreenshotFrom2024-10-24_13-25-15.png
|
 |
| Attachment 4: DispersionTLBPM2.png
|
 |
| Attachment 5: UnstableTLBPM4Screenshot_from_2024-10-24_14-09-07.png
|
 |
|
946
|
Fri Oct 25 18:07:48 2024 |
KD | Under Process | Shift summary | Linac Commissionning |
|
performance estimation alignement QP | |
On aligne dans QP1 et QP3 et on regarde pour une variation de +- 1A la derive sur TL/BPM.01
valeur nominal QP1-QP3 (0.1A, 3.4A, -3.4A)
autour de QP1-QP3 à 0 pour l'alignement :
* valeur nominal BPM initale (0.3mm, -0.3mm)
* QP3 +1A : (0.3mm, -0.1mm)
* QP3 -1A : (0.5mm, 0mm)
* QP1 +1A : (0.4mm, -0.1mm)
* QP1 -1A : (0.3mm, -0.2mm)
* valeur nominal BPM finale (0.3mm, -0.2mm)
autour de QP1-QP3 à aux valeurs nominales pour l'alignement :
* valeur nominal BPM initale (0.4mm, 0mm)
* QP3 +1A : (0.3mm, 0mm)
* QP3 -1A : (0.4mm, 0mm)
* QP1 +1A : (0.4mm, 0.mm)
* QP1 -1A : (0.3mm, -0.1mm)
* valeur nominal BPM finale (0.3mm, -0.1mm)
*** We go to the ring ***
No Steerer and we can transport to the ring. Alignement used : QP1-QP3 @nominale current
==> no loss of charge.
==> good beam on last screen
==> I suggest to used this alignement : saved in recipe "all_20241025_19_18_14"
==> with steering impossible to enter in the ring when at 0 on TL/BPM.03 and TL/BPM.04 (on axis beam). Why ? Ring configuration ? Kick from Ring magnets or EP ? Especially in vertical.
==> by setting the nominal current on the steererqs (of TL) we can inject in the ring. The 2 alignement of QP1 - QP3 seems to be close enougth.
*** Scan coil Vs beam dim at TL/SST1
==> see figure and data
20h40: stop machine
|
| Attachment 1: 2024-10-25_19_18_27_tl_dg_sst_03-ccd_01_RAW.png
|
 |
| Attachment 2: Screenshot_2024-10-25_19-19-29_BPM.png
|
 |
| Attachment 3: Screenshot_2024-10-25_19-20-50_charge.png
|
 |
| Attachment 4: Screenshot_2024-10-25_19-21-27_steerer.png
|
 |
| Attachment 5: Screenshot_2024-10-25_19-20-50_charge.png
|
 |
| Attachment 6: charge_VS_coil_20h35.png
|
 |
| Attachment 7: dim_VS_coil_20h35.png
|
 |
|
948
|
Tue Oct 29 10:31:45 2024 |
HG, SC | Under Process | Info | Linac Commissionning |
|
Etude faisceau linac | |
9h30 : Mise en chauffe
10h31 : mise en route faisceau
On se place à 0 dB,
Programme :
- etude du transport de charge (transport 0.5dB vs 0dB sur le canon) avec alignement quads et vérification alignement section
- Avec trois gradient different (0,0.5,1.5) phase de foc max : comparer les centroides du faisceau et mesure du delta sur les BPMs
- Mesure energie entre 0 et 0.5dB
- Mesures Iris (0.5;0.7;0.9;1.3) (scan taille vs soleno pour chaque valeurs iris et sauvegarder les images)
Phase canon = 92 degres, charge = 88 pC, Att canon = 0dB, HT = 1215V
mesure energie canon = 2.14 MeV à focalisation maximum
Passage a energie maximum (phi - 50° = phi =40°), mesure energie = 4.75 MeV ?? avec B = 225A sur solenoide de focalisation
refait avec soleno de 250 A : Ekin = 4.98 MeV.
phi=40°, B=225A soleno foc, Att = 0.5dB E=4.68MeV
repassage à Att = 0dB
phi=40°, B=225A soleno foc, Att=0dB, E=4.85MeV
Faisceau sur LI Yag sans steerer ni Soleno à Q max pour différentes atténuations du GUN :
------------- LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 342.83700592463555 +/- 0.2987062015620488
YAG Y : 353.61659184894637 +/- 0.6060406633412789
------ YAG Max proj. Pixels -----
YAG X : 406.6 +/- 2.7276363393971708
YAG Y : 289.6333333333333 +/- 4.651045282753352
------ BPMs en mm -----
BPM X : -0.021341 +/- 0.07459332423079161
BPM Y : 0.7380352666666664 +/- 0.044706324439191175
------------- LI -------------------
------ YAG LimaBPM Pixels -----
YAG X : 352.51520329015966 +/- 3.65250088707645
YAG Y : 331.1754260161254 +/- 1.6402533446535188
------ YAG Max proj. Pixels -----
YAG X : 399.4 +/- 2.9393876913398134
YAG Y : 292.1 +/- 3.6546773683413787
------ BPMs en mm -----
BPM X : -0.7615831666666665 +/- 0.0619905022021295
BPM Y : 0.3951680666666666 +/- 0.08264741380060775
------ YAG LimaBPM Pixels -----
YAG X : 409.8982218428248 +/- 1.2628531500760658
YAG Y : 301.77912624916667 +/- 2.1864024049264907
------ YAG Max proj. Pixels -----
YAG X : 408.3 +/- 1.4640127503998497
YAG Y : 306.6 +/- 3.6018513757973594
------ BPMs en mm -----
BPM X : -0.214663 +/- 0.05110790976094927
BPM Y : 0.3527072 +/- 0.059748713428491494
------ YAG LimaBPM Pixels -----
YAG X : 381.58572418037227 +/- 71.06890884269704
YAG Y : 307.78869245804236 +/- 1.3230868455223541
------ YAG Max proj. Pixels -----
YAG X : 394.3333333333333 +/- 2.102908039411667
YAG Y : 309.96666666666664 +/- 2.213343373471204
------ BPMs en mm -----
BPM X : -0.7139440666666665 +/- 0.06876073088613555
BPM Y : 0.41046903333333334 +/- 0.0675616866468382
--> Centroid is changing in vertical
Solenoid :
Questions à propos de l'alignements.
Essais avec Col1 = Eteint
Start : DTx= 0.783 DTz= 3.427 DRx= 10.4511 DRz= -4.3594
Step 1:
DTx= 1.091 DTz= 3.4597 DRx= 10.4473 DRz= -4.4186
Step2 :
DTx= 1.3382 DTz= 3.541 DRx= 10.4036 DRz= -4.3143
Step3:
DTx= 1.5055 DTz= 3.5749 DRx= 10.3716 DRz= -4.2729
Step4:
DTx= 1.5682 DTz= 3.5948 DRx= 10.3393 DRz= -4.1506
step5:
DTx= 1.5682 DTz= 3.5948 DRx= 10.3393 DRz= -4.1506
step6:
DTx= 1.6532DTz= 3.587 DRx= 10.345 DRz= -4.0593
Step7:
DTx= 1.7192 DTz= 3.5943 DRx= 10.3186 DRz= -3.9799
Step8:
DTx= 1.8 DTz= 3.6069 DRx= 10.2761 DRz= -3.887
step9:
DTx= 1.8447 DTz= 3.6139 DRx= 10.2849 DRz= -3.7875
step10:
DTx= 1.9285 DTz= 3.5794 DRx= 10.3361 DRz= -3.729 |
| Attachment 1: Soleno_Align_noCol1.png
|
 |
|
952
|
Tue Nov 5 10:09:35 2024 |
SC VC | Under Process | Shift summary | Linac Commissionning |
|
shift linac | |
demarrage modulateur 9H
erreur vanne acquitée
10H intervention Viktor sur le laser PC
alignement laser en cours => pB de passage dans atténuateur (at least)
il faudra vérifier le point de référence alignement faisceau dans COL2 par rapport à la position
11h15 machine éteinte
priorité à Viktor pour alignement du laser PC;;; aujourd'hui et demain si nécessaire
dossier : /data/shared/Trend_scripts
changer environement : opt
choisir le script : ./trend.sh "nom script"
|
|
954
|
Wed Nov 6 08:06:51 2024 |
VC MJ | Under Process | Shift summary | Linac Commissionning |
|
shift | |
demarrage chauffage 8h
autorisation PSS zone modulateur interdite => il faut venir valider la zone
PB MPS appel nourredine
plus les bouton mode de tir (solution mode expert/tir/forçage choix tir)
acquitement defaut vide: (solution mode expert /vide/validation)
pb MPS regle
shutter orange - on laisse refroidir 10 min - shutter vert
camera laser a bouge le point cathode est perdu
phase ch max = 58
charge = 180 pC avec att laser = 320
Essai de Realignement point cathode
Script alignement_photocathode_BPM (phase_max -5) --> va completement dans le decor (pos x=21 et posy=-6 !!) ... cf screenshot signal BPMLI
Je relance le script en partant d'une autre position depart pour M4 (13h56)
script arreté à pos (pos x=31 et posy=-17 !!)
Viktor réaligne le laser PC sur les références physiques
M4.01 (Cathode H) 470
M4.02 (Cathode V) 5488
On retroouve le faisceau sur YAGLI pour
M4.01 (Cathode H) 800
M4.02 (Cathode V) 5120
Mais le faisceau n'est plus sur la camera
Viktor acces casemate pour rerentrer le faisceau image laser sur la camera UV avec les miroirs de renvoie (16h19)
on regle à la main alignement laser sur cathode
optimisation sur BPM
M4.01 (Cathode H) 880
M4.02 (Cathode V) 5133
réaligneent avec script BPM
pos asservissement
H iris pos 6.33 mm (855)
V iris pos 3.56 mm (5133)
Point cathode realigne pour prochain shift
Prise de donnees rapide a la fin (note sur une feuille papier pour l'instant)
(Une belle journee de mer ...)
|
| Attachment 1: BPMLI_align_photocathode_13h15.png
|
 |
| Attachment 2: BPMLI_align_photocathode_13h56.png
|
 |
| Attachment 3: Laser_sur_cameraUV_16h19.png
|
 |
|
957
|
Tue Nov 12 08:12:06 2024 |
MJ KD VC | Under Process | Shift summary | Linac Commissionning |
|
shift du 12 novembre 2024 | |
8h10 : mise en chauffe en remote (modulateur, laser, chillers).
redemarrage serveur camera UV
vide canon à sauté
Arret synchro (Dialkia a coupé le courant des ampli 41.6MHz)
intervention dans la fosse (infra)
11H nouvelle ronde
Programme journée
Mesure dans LI pour Kick faisceau
(+Passage LE direct puis par anneau si ya le temps)
Mesure dans LI pour Kick faisceau
- Donnees prises (fichier de mesures dans datashared, a traiter)
Mesures test Alignement DPI et SEPTUM
- SCAN du premier bpm anneau (ri-ci_bpm02) en fonction du courqnt DPI puis courqat SEPTUM
- Fichier dans /data/shared dans repertoire Scan_ring_injection
Passage LE direct puis par anneau --> pas eu le temps
|
|
959
|
Wed Nov 13 08:26:05 2024 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Shift summary 13/11/24 | |
demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC sDev 13pC
Température canon pas optimale: 31.6°C le reflichi cann remonte en fin de pulse nouvelle consigne à 31.8°
Etude transmission charge à travers section en fonction de Col02n
( Q_transport_vs_Soleno.png =>faisceau non centré dans la section (recette # good_injection_no_good_storage )
Centrage faisceau dans la section ref Elog Commitionning 917_1
srt1 [H,V] 1.50 , -1.57
srt2 [H,V] -3.83 , 2.37
Etude transmission charge à travers section en fonction de Col02n (Q 50pC 100pC 205pC 280pC)
Centrage faisceau dans la section ref Elog Commitionning 917_2
srt1 [H,V] 2.26 , -3.30
srt2 [H,V] -4.42 , 4.16
Etude transmission charge à travers section en fonction de Col02n (Q 180pC, 100pC)
Attention alignement 917_2 très mauvais du point de vue de la charge
comparaison charge BPM ICT ==> gros probleme de lecture sur les BPMs somme....
Voir trends en pj dans lesquels on fait varier l'atténuation du laser, et on regarde les variations de charge et du signal Spsum.
Autour de 80pC de charge le signal Spsum fait des sauts pour ensuite à environ 90 pC de charge baisser d'environ 50% ...
Note : la charge a diminué pendant le shift passant de 300 pC à 420 degrés d'atténuation sur le laser à 160 pC .... Il faut monitorer l'energie du Laser ...
Mesures de la taille en fonction du Soleno : /data/shared/mesure/today/Taille_Soleno/
|
| Attachment 1: Q_transport_vs_Soleno.png
|
 |
| Attachment 2: Q_transport_vs_Soleno_Align_917_1.png
|
 |
| Attachment 3: Q_transport_vs_Soleno_Align_917_2.png
|
 |
| Attachment 4: ICT_Att_320_to_400.png
|
 |
| Attachment 5: SPSum_LI_Att_320_to_400.png
|
 |
|
960
|
Thu Nov 14 08:33:34 2024 |
Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024 | Under Process | Info | Linac Commissionning |
|
| |
08h30 Start ThomX
10h00 HV is 'ON'
11h03 RF Gun phase 230 dg. Att. 0.0 dB, Laser Att. 360.00, Charge -145 pC, Section Att. 2.59 dB, Phase 207 dg.
Linac steerers: H [2.69 -4.45]; V [-2.14 2.32],
11h20 Ring injection, Orbit studies
11h25 RF gun breakdowns, HV is 'OFF'
11h28 Restart HV, Problems with the Shutter,
11h36 Fixed
Frequent interlocks on V1
Set RF Gun temperature to 31.7 dg. (Clarinette temperature 31.5 -31.6)
11h40 Ring RF is 'ON'
15h43 Freaq. RF=500.1003
16h20 RF GUN Phase 229 dg., Charge -88 pC, Sect. Phase 213 dg. TL/BPM2 X=-2, Att. 2.703
17h00 Trying BBA
QP02 Ri-C2 BPM.01-Lib.04, 0.4 mm on X
QP02 Ri-C1 BPM.01-Lib.03, 1.8 mm on X
QP03 Ri-C1 BPM.02-Lib.03, 0.4 mm on X
QP03 Ri-C2 BPM.02-Lib.04, 0.2 mm on X
17h50 Stop ThomX |
| Attachment 1: TL_SST3Screenshot_from_2024-11-14_16-10-34.png
|
 |
| Attachment 2: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_RAW_16bits.tiff
|
| Attachment 3: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_RAW.png
|
 |
| Attachment 4: 2024-11-14_16_10_01_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 5: TL_SST2Screenshot_from_2024-11-14_16-06-27.png
|
 |
| Attachment 6: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_RAW.png
|
 |
| Attachment 7: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 8: 2024-11-14_16_05_27_tl_dg_sst_02-ccd_01_RAW_16bits.tiff
|
| Attachment 9: Screenshot_from_2024-11-14_15-35-17.png
|
 |
| Attachment 10: Screenshot_from_2024-11-14_15-31-58.png
|
 |
| Attachment 11: Screenshot_from_2024-11-14_15-30-14.png
|
 |
| Attachment 12: Screenshot_from_2024-11-14_15-29-27.png
|
 |
| Attachment 13: Screenshot_from_2024-11-14_15-29-15.png
|
 |
| Attachment 14: Screenshot_from_2024-11-14_15-29-02.png
|
 |
| Attachment 15: Screenshot_from_2024-11-14_12-33-27.png
|
 |