  420   Fri Mar 25 10:26:06 2022 Entered by Maher OMEICH from 134.158.91.212 on Fri Mar 25 10:25:42 2022Under ProcessProblemRF D1 modulator Pour les problèmes du modulator
j'ai contacté par mail Scandinova,
j'ai relancé hier et aujoud'hui
  
  419   Fri Mar 25 08:22:18 2022 VC SC HG NDUnder ProcessLinacDiag | Linac Commissionning commisionning Charge et OTR  demarrage Modulateur 8h20

9h15 temp chiller ok

energie laser 32uJ atténuateur
 12x 
  418   Thu Mar 24 17:26:38 2022 Entered by Super Team from 134.158.195.142 on Thu Mar 24 17:26:25 2022FixedLinacLinac Commissionning Arrêt faisceau     
  417   Thu Mar 24 17:12:01 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022Reference SolutionLinacLinac Commissionning Paramètres Faisceau Alignement laser

On retrouve la phase pour la charge
max phi = 313 degres (consigne chiller canon
  
  416   Thu Mar 24 15:41:18 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 15:41:04 2022FixedLinacLinac Commissionning Alignement laser Position moteur M4 avant alignement laser
:

x = 380 et y = 5373
 2022-03-24_15_40_29_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_10.png2022-03-24_16_14_17_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_10_8.png 
  415   Thu Mar 24 10:34:15 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022FixedFixInfra | Linac Commissionning config clefs PSS Operateurs: VC, SC, ND

Pour memoire, cf photo...
 IMG_20220324_102230_1_copy_1248x1664.jpg 
  414   Thu Mar 24 09:44:28 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 09:43:47 2022FixedShift summaryDiag | CC | RF D1 Mesures 24/3/2022 Operateurs: ND, VC, SC

===

 
 Screenshot_from_2022-03-24_16-51-36.png 
  413   Thu Mar 24 09:26:22 2022 Entered by Super Team from 134.158.195.141 on Thu Mar 24 09:25:25 2022Under ProcessLinacDiag ThomX -commitionning diag Demarrage modulateur 9H

demarrage chiller 9h15
  
  411   Wed Mar 23 12:52:58 2022 Entered by Super Team from 134.158.195.141 on Wed Mar 23 12:52:44 2022Under ProcessLinacElectronique | Linac Commissionning Test des redpitaya baie 17 Point de départ :

- Signal d'entrée :
Générateur AFG Techtro, Sortie
 6x 
  410   Wed Mar 23 11:10:16 2022 Entered by Maher OMEICH from 134.158.91.212 on Wed Mar 23 11:09:58 2022 Shift summaryLinac Commissionning   10h40 Démarrage modulateur et chillers,
casemate encore ouverte à fermer vers
midi
  
  409   Tue Mar 22 11:28:11 2022 Entered by Super Team from 134.158.195.141 on Tue Mar 22 11:27:07 2022Not FixedLinacLaser | RF D1 Signal Redpitaya Signal Photodiode :

Pour comprendre les échelles
ainsi que le manque de dynamique, Viktor
 Screenshot_from_2022-03-22_11-28-59.png 
  408   Mon Mar 21 14:45:35 2022 Entered by Maher OMEICH from 134.158.91.212 on Mon Mar 21 14:45:17 2022 Shift summaryLinac Commissionning   ( 10h00 ) Démarrage modulateur et
refroidissement, fermuture casemate et zone
modulateur
  
  407   Mon Mar 21 09:53:11 2022 Entered by Iryna Chaikovska from 134.158.195.144 on Mon Mar 21 09:52:37 2022 InfoAimants Cyclage QUAD (TL) The cycling of the following quads ( to
zero current) were tested. The corresponding
cycling cuves were loaded in the DS (checked).
  
  406   Fri Mar 18 10:34:19 2022 Entered by Viktor Soskov from 134.158.195.153 on Fri Mar 18 10:34:03 2022FixedInfoLinac Commissionning Laser status L'energie UV sur la cathode = 30µJ   
  405   Thu Mar 17 17:54:29 2022 Entered by JNC/HG/AM/SC from 134.158.195.143 on Thu Mar 17 17:54:14 2022Under ProcessLinacLinac Commissionning Faisceau MeanStd fonctionne

Cyclage des dipoles Q01 Q02 et
Q03 fait
  
  404   Thu Mar 17 16:04:24 2022 Entered by HG/JNC/SC from 134.158.195.143 on Thu Mar 17 16:04:06 2022Under ProcessLinacLinac Commissionning Shutter laser photocathode Le problème sur le shutter qui reste
en orange à l'ouverture du laser
perdure.
  
  403   Thu Mar 17 15:27:35 2022 Entered by HG/JNC/SC from 134.158.195.142 on Thu Mar 17 15:27:21 2022Under ProcessLinacLinac Commissionning Transport faisceau Modulateur en marche

Transport faisceau jusqu'à
TL/DG/SST.01 
 2022-03-17_15_26_47_tl_dg_sst_01-ccd_01_RAW.png2022-03-17_15_30_48_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_20_18.png 
  402   Wed Mar 16 15:25:48 2022 CB/HG/JNC Shift summaryLinac Commissionning run du 16 mars 2022 plusieurs passage en standby modulateur,
pas très productif pour les mesures
aujourd'hui.
  
  401   Tue Mar 15 10:45:28 2022 CB/HG/JNC Shift summaryLinac Commissionning run du 15 mars 2022 Pompage du chemin optique laser

Position laser 818, 573 pixels,
dimension 0.5mm,  0.38mm, energie 48
 7x 
  400   Tue Mar 15 08:55:41 2022 Entered by Maher OMEICH from 134.158.91.212 on Tue Mar 15 08:55:25 2022 Shift summaryRF D1   Démarrage Modulateur et chillers   
ELOG V3.1.4-395e101