HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX  Not logged in ThomX    logo
Message ID: 441     Entry time: Thu Apr 14 09:56:11 2022
 Author: Entered by VC/ND/SC from 134.158.195.141 on Thu Apr 14 09:55:56 2022 
 Status: Fixed 
 Type: Info 
 Category: Linac Commissionning 
 Important:
 Subject: Faisceau pour les diagnostics 
 Icon:  

Le programme de la journée :

- Morning: Iryna, Slava + Viktor

- From 13h : Nicolas+Vincent+Sophie
Alexandre is only available remotely

Measures (by priority):

- Faraday Cup impedance (Vincent) [May require several access]
- Take 1000 shots (raw ICT+FC+BPM) with stable beam to the TL dump
for charge measurement calibration (Nicolas)
- Test quadrupoles (Iryna+Slava+Viktor)
- Record BPM reading versus screen reading while steering the beam
and repeat after cycling the quads (Nicolas)
- Take 100 YAG images and 100 OTR images (Nicolas)
- Switch to AcqAttrManager mode (Nicolas)
- Test GUIs (Nicolas):
- Beam recipe
- AcqAttrManager switching IHM
- Beam start
- Beam steering
- Charge transport GUI

ELOG V3.1.4-395e101