179
|
Wed Nov 24 16:52:29 2021 |
Entered by Super Team from 134.158.195.141 on Wed Nov 24 16:52:10 2021 | Under Process | Linac | Linac Commissionning |
|
Mesure d'energie | | Calibration Ecran TL-SST01
|
|
|
461
|
Thu May 19 08:55:55 2022 |
Entered by VC, JNC, SC, HG from 134.158.195.141 on Thu May 19 08:55:39 2022 | Under Process | Linac | Linac Commissionning |
|
Mesure courant obscurité | | But : mesure du courant d'obscurité
Démarrage chauffage modulateur
et refroidissement à 8h45 |
|
|
1059
|
Fri Apr 18 08:23:13 2025 |
VM, IC, ND | Fixed | Problem | LI |
|
Measurements 18/4 | | 08h21 Thomx Started: modulator, frig, laser
08h27 Chillers started, cycling
all magnets |
    |
|
1164
|
Fri Dec 5 14:48:46 2025 |
Marie Julien Hayg Sophie | | Shift summary | LI | TL | LE | Ring |
|
Matching ring-TL - Recherche des bons twiss pour la TL | | Programme
shift : etudes matching anneau-TL - Recherche
param twiss TL |
|
|
1239
|
Mon May 11 09:33:17 2026 |
Vincent | Under Process | Linac | LI | TL |
|
Manip Gplast | | 9h30 test radioprotection OK (mesure en
dessous du bruit de fond)
13h30 fenetre installée |
|
|
1210
|
Thu Mar 12 15:17:49 2026 |
MJ, KD | Fixed | Shift summary | Linac Commissionning | Ring Commissioning |
|
MONOCHROMATEUR - 12 mars 2026 | | Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2
0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20 |
|
|
1226
|
Tue Apr 7 07:49:37 2026 |
IC,VM, KD, DN, MJ | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
MONO 61.5 MeV - 07 avril 2026 | | 7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
09h30 HV is ON |
|
|
631
|
Mon Nov 28 14:25:46 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Mon Nov 28 14:25:31 2022 | | Shift summary | Linac Commissionning |
|
Lmag STR 3 (steerer après la LIL) | | Nouvelle détermination
de Lmag du Steerer 3
Lmag |
|
|
645
|
Wed Dec 7 16:58:54 2022 |
Entered by Super Team from 134.158.195.142 on Wed Dec 7 16:58:42 2022 | | Shift summary | Linac Commissionning |
|
Linac measurements @ différent modulator voltage settings | |
Modulateur : 1070 V
On se met à la phase de |
|
|
1089
|
Wed Jun 18 12:45:49 2025 |
Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025 | Under Process | Info | Linac Commissionning |
|
Linac measurement + phase + | |
Phi Qmax ; 324° : Phi Emax
: 274°
Qmax : 70-80 pC (Att
: 290°) and 300 pC (Att : 420°)
Recipt |
6x |
|
533
|
Mon Aug 29 08:14:22 2022 |
VC | Under Process | Shift summary | Linac Commissionning |
|
Linac commitionning | | 8h15 demarrage regulation température
8h45 chauffage Klystron
10H chauffage ready => machine |
|
|
1191
|
Wed Feb 11 09:12:35 2026 |
VM && HG | Under Process | Shift summary | LI |
|
Linac commissioning | | 09h12 Warm-up ThomX: Modulator, Laser,
Fridge
09h21 Chillers were started, cycling |
  |
|
651
|
Mon Dec 12 10:26:13 2022 |
SC/MJ | | Shift summary | Linac Commissionning |
|
Linac + TL divers | | Mise en chauffe modulateur et refroidissement
modulateur 1090 - iris 1.3
- phase ch max 142 - energie |
 |
|
808
|
Tue Oct 24 10:58:26 2023 |
CB,KD,SC | | Linac | LI | Linac Commissionning |
|
Linac | | 8h30 Mise en chauffe modulateur (MO)
Problème synchro, Intervention
10h30 Réglage du laser dans |
  |
|
809
|
Wed Oct 25 08:59:10 2023 |
CB | | Linac | LI |
|
Linac | | Température canon à 31.75°
modifiée hier
8h59 Mise en chauffe modulateur |
|
|
810
|
Thu Oct 26 09:02:33 2023 |
VC,SC, ND, IC, VK, CB, V | | Linac | LI | TL | Ring |
|
Linac | | 8h30 Mise en chauffe
Pas d'internet sur client1
et client2 |
|
|
713
|
Mon Mar 13 13:54:31 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!! | | Le bouton PHASE CANON sur le panneau
IHM NE FONCTIONNE PLUS !
plus d'acces a la phase canon. |
|
|
953
|
Tue Nov 5 17:30:10 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024 | Fixed | Info | Laser |
|
Laser-cathode | | Bonjour, le laser (miroirs du parcours
optique) a ete realigne.
L'etat actuel: l'enrgie |
|
|
984
|
Wed Dec 18 11:59:49 2024 |
Entered by Viktor Soskov from 134.158.195.153 on Wed Dec 18 11:59:34 2024 | Fixed | Info | Laser |
|
Laser-cathode | | Bonjour, le laser-cathode a ete realigne
(miroir M5, miroir dans la salle laser).
L'energie UV sur la cathode 55 µJ, |
|
|
344
|
Wed Feb 16 11:25:44 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Wed Feb 16 11:21:22 2022 | Fixed | Info | Linac Commissionning |
|
Laser status, entered from 134.158.195.153 | | Le fasceau laser est bloqué avec
l'option "Gate_Int" - True,False |
|