HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 38 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  179   Wed Nov 24 16:52:29 2021 Entered by Super Team from 134.158.195.141 on Wed Nov 24 16:52:10 2021Under ProcessLinacLinac Commissionning Mesure d'energie Calibration Ecran TL-SST01

 
  
  461   Thu May 19 08:55:55 2022 Entered by VC, JNC, SC, HG from 134.158.195.141 on Thu May 19 08:55:39 2022Under ProcessLinacLinac Commissionning Mesure courant obscurité But : mesure du courant d'obscurité

Démarrage chauffage modulateur
et refroidissement à 8h45
  
  1059   Fri Apr 18 08:23:13 2025 VM, IC, NDFixedProblemLI Measurements 18/4 08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling
all magnets
 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png 
  1164   Fri Dec 5 14:48:46 2025 Marie Julien Hayg Sophie Shift summaryLI | TL | LE | Ring Matching ring-TL - Recherche des bons twiss pour la TL Programme
shift : etudes matching anneau-TL - Recherche
param twiss TL
 Screenshot_from_2025-12-05_18-26-56.png 
  1239   Mon May 11 09:33:17 2026 VincentUnder ProcessLinacLI | TL Manip Gplast 9h30 test radioprotection OK (mesure en
dessous du bruit de fond)

13h30 fenetre installée
  
  1210   Thu Mar 12 15:17:49 2026 MJ, KDFixedShift summaryLinac Commissionning | Ring Commissioning MONOCHROMATEUR - 12 mars 2026 Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2
0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20
  
  1226   Tue Apr 7 07:49:37 2026 IC,VM, KD, DN, MJUnder ProcessShift summaryLinac Commissionning | Ring Commissioning MONO 61.5 MeV - 07 avril 2026 7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
09h30 HV is ON
  
  631   Mon Nov 28 14:25:46 2022 Entered by Marie Jacquet from 134.158.89.45 on Mon Nov 28 14:25:31 2022 Shift summaryLinac Commissionning Lmag STR 3 (steerer après la LIL) Nouvelle détermination
de Lmag du Steerer 3

Lmag
 2022-11-28-STEERER_3_Lmag.pdf 
  645   Wed Dec 7 16:58:54 2022 Entered by Super Team from 134.158.195.142 on Wed Dec 7 16:58:42 2022 Shift summaryLinac Commissionning Linac measurements @ différent modulator voltage settings   

Modulateur : 1070 V

On se met à la phase de
  
  1089   Wed Jun 18 12:45:49 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025Under ProcessInfoLinac Commissionning Linac measurement + phase +  
Phi Qmax ; 324° : Phi Emax
: 274°
Qmax : 70-80 pC (Att
: 290°) and 300 pC (Att : 420°)
Recipt
 6x 
  533   Mon Aug 29 08:14:22 2022 VCUnder ProcessShift summaryLinac Commissionning Linac commitionning 8h15 demarrage regulation température

8h45 chauffage Klystron

10H chauffage ready => machine
  
  1191   Wed Feb 11 09:12:35 2026 VM && HGUnder ProcessShift summaryLI Linac commissioning  09h12 Warm-up ThomX: Modulator, Laser,
Fridge

09h21 Chillers were started, cycling
 Vacc_2026-02-11_11-05-31.pngScreenshot_from_2026-02-11_15-57-35.pngCharge_trend_2026-02-11_17-12-31.png 
  651   Mon Dec 12 10:26:13 2022 SC/MJ Shift summaryLinac Commissionning Linac + TL divers Mise en chauffe modulateur et refroidissement

modulateur 1090  - iris 1.3 
- phase ch max 142  -  energie
 yag_TL2.pngBPM_LI.png 
  808   Tue Oct 24 10:58:26 2023 CB,KD,SC LinacLI | Linac Commissionning Linac 8h30 Mise en chauffe modulateur (MO)

Problème synchro, Intervention

10h30 Réglage du laser dans
 profiles_darkandbeam.pngsolenoscan16h05.pngsolenoscan16h32.png 
  809   Wed Oct 25 08:59:10 2023 CB LinacLI Linac Température canon à 31.75°
modifiée hier

8h59 Mise en chauffe modulateur
  
  810   Thu Oct 26 09:02:33 2023 VC,SC, ND, IC, VK, CB, V LinacLI | TL | Ring Linac 8h30 Mise en chauffe

Pas d'internet sur client1
et client2
  
  713   Mon Mar 13 13:54:31 2023 MJNot FixedUrgentLinac Commissionning Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!!  Le bouton PHASE CANON sur le panneau
IHM NE FONCTIONNE PLUS !

plus d'acces a la phase canon.
  
  953   Tue Nov 5 17:30:10 2024 Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024FixedInfoLaser Laser-cathode Bonjour, le laser (miroirs du parcours
optique) a ete realigne.

L'etat actuel: l'enrgie
  
  984   Wed Dec 18 11:59:49 2024 Entered by Viktor Soskov from 134.158.195.153 on Wed Dec 18 11:59:34 2024FixedInfoLaser Laser-cathode Bonjour, le laser-cathode a ete realigne
(miroir M5, miroir dans la salle laser).
L'energie UV sur la cathode 55 µJ,
  
  344   Wed Feb 16 11:25:44 2022 Entered by Viktor Soskov from 134.158.195.153 on Wed Feb 16 11:21:22 2022FixedInfoLinac Commissionning Laser status, entered from 134.158.195.153 Le fasceau laser est bloqué avec
l'option "Gate_Int" - True,False
  
ELOG V3.1.4-395e101