ID Date Author Status Type Category Important Subject Icondown Text Attachments
  737   Thu Apr 20 10:36:19 2023 Entered by Super Team from 134.158.195.142 on Thu Apr 20 10:36:01 2023Reference SolutionShift summaryLI | TL | Aimants | Linac Commissionning référence axe mag Canon Voici la référence tete de
machine pour l'axe mag canon :

Laser Iris position  [H;V]
  
  Draft   Fri Apr 21 14:30:19 2023 Entered by Super Team from 134.158.195.141 on Fri Apr 21 14:30:03 2023 LinacLinac Commissionning Faisceau Linac 13h49 Démarrage faisceau

Position laser H = 4.9 et V = 2.42,
scan charge phase : phase de focalisation
  
  Draft   Tue Apr 25 09:11:29 2023 ND,DN,SC,NE, EMNew SolutionShift summaryRing Quart collectif 25/4 9h10 (ND): Mise en chauffe modulateur et
laser

9h15 mise en chauffe Chiller (SC)
  
  740   Tue Apr 25 13:53:05 2023 SC,ND,VK, VM, IC Shift summaryLinac Commissionning | Ring Commissioning Démarrage faisceau Point initial faisceau canon :

- soleno LI/AE/COL.01-MOT.02 =
3.3 mm, LI/AE/COL.01-MOT.01 = 0.8 mm, LI/AE/COL.02-MOT.01
  
  742   Wed Apr 26 19:03:56 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed Apr 26 19:03:42 2023 Shift summaryLinac Commissionning shift du 26/04 - Quads scans + stabilite 1) Quad scans Isol = 155,
175, 190, 200, 220 pris avec script classique
ET avec script FWHM LIMA - Taille a comparer,
  
  743   Thu Apr 27 09:24:26 2023 ND, LSNew SolutionShift summaryRing | Diag Prise de donnee 26/4/2023 9:24 Mise en chauffe

9:30 Cyclage des aimants

11h44 Démarrage faisceau
 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png 
  744   Fri Apr 28 09:20:00 2023 ND, LS, IC, VM, VKNew SolutionShift summaryRing Prise de donnee 27/4/2023 9:19: Mise en chauffe

10:24 Cycling magnets

10:50 Demarrage faisceau
 10x 
  745   Wed May 3 09:04:24 2023 KDNew SolutionShift summaryLI | TL | LE | Linac Commissionning shift du 03 mai 2023 9h : Mise en chauffe machine (frigo,
chiller, modulateur, PA, Laser)

13h30 : Démarrage Machine
 8x 
  746   Wed May 3 20:10:40 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 Shift summaryLinac Commissionning Stabilite LINAC Pour illustrer la fin de l'entree
elog 745 d'aujourd'hui  :

 2023-05-03-traitement_Data20230424et26.pdf 
  747   Thu May 4 10:09:43 2023 Entered by Viktor Soskov from 134.158.195.153 on Thu May 4 10:09:22 2023FixedInfoLinac Commissionning Laser status Bonjour l'énergie UV actuelle
sur la cathode = 58µJ avec l'iris
1.3mm
  
  748   Thu May 4 11:41:53 2023 VK, VM, IC, LS Shift summaryRing Commissioning Restart storage in the Ring ~9h Start of the modulator

10h Tuning of the injector with
KD
  
  749   Thu May 4 16:14:06 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 Shift summaryLinac Commissionning RE: Stabilite LINAC  




  
  750   Fri May 5 08:47:28 2023 KD VM VK JN SLUnder ProcessShift summaryRing Commissioning shift du 5 mai 2023 8h30 : accès casemate controlé 

==> septum et kickers OFF et
cavité RF OFF
 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png 
  751   Mon May 15 11:31:43 2023 ND, LS, IC, VK, VM, SWUnder ProcessShift summaryRing Commissioning Ring operation 15/5 10:00 Machine warm up

Magnets cycling

11:00 Start machine
 7x 
  752   Tue May 16 10:28:43 2023 LS, ND, IC, VKUnder ProcessShift summaryRing Commissioning Ring operation 16/5 9:33 Start warming up

9:45 Ducre is working on the plumbing
but it shuld not affect operations
 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png 
  753   Wed May 17 09:16:47 2023 VK, IC. AL Shift summaryRing Commissioning Understanding of the shift in RF frequency 8:40 Start warming up, problem with PSS.
It was restarted.

Problems to start and tune the
 18x 
  754   Fri May 19 18:05:29 2023 VK, IC Shift summaryRing Commissioning RF frequency of the Ring In the morning, after the start-up pf the
machine, scan phase-charge and small tuning
it was possible to store the beam with the
 scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png 
  755   Fri May 19 20:22:42 2023 MJ, KDUnder ProcessShift summaryRF Anneau | Ring Commissioning RF et anneau Apres 18h30 : prise ne main de la machine
pour aller dans la LE ==> le kicker d'extraction
est interlocké (abdandon) 
 24_4mm.png22_4mm.png 
  756   Tue May 23 11:36:24 2023 LS, ND Shift summaryLI | Diag Prise de donnees 23/05 9:30 Demarrage machine

Fin installation Cerenkov + tests
MRSV
 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg 
  757   Thu May 25 15:08:18 2023 NC,IC, VM,lS Shift summaryRing   9:10 warm up modulator

10:30: cycling of magnets

10:20 : scan charge phase
 ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png 