Entry   Entered by SC/JNC from 134.158.195.141 on Fri Feb 18 13:53:04 2022; Paramètres faisceau 
Energie laser sur photocathode : 40 - 45 uJ

Démarrage faisceau

Charge : 115 pC, faisceau instable, pas d'alignement pour l'instant sortie canon
Entry   Entered by Super Team from 134.158.195.142 on Tue Oct 5 10:23:47 2021; Paramètres RFs  Screenshot_from_2021-10-05_10-27-42.png
Signal à 150 mV -> Gradient de 80 MV/m

 
Entry   Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022; Paramètres Faisceau 
Alignement laser

On retrouve la phase pour la charge max phi = 313 degres (consigne chiller canon = 31.25 degres)

On enlève 40 degres à la phase de charge max pour arriver à la phase d'énergie maximum phi = 273 degres
Entry   Entered by Super Team from 134.158.195.141 on Mon Mar 7 16:30:22 2022; PSS redemarre 
Intervention Maher : PSS ok

 
Entry   Entered by HM from 134.158.195.141 on Mon Mar 7 13:40:36 2022; PSS en sdc arreté 
Le PSS ne tourne plus en SdC (roue crantée figées) depuis le 5 mars 7:40

HM
Entry   Entered by Super Team from 134.158.195.141 on Tue Feb 1 10:15:28 2022; PSS en alarme 
Le PSS est en statut spécial avec écran clignottant avec statut LB9000 + message Alarme Anoxie.

Harold est prévenu et va intervenir
Entry   Entered by Super Team from 134.158.195.141 on Tue Feb 1 11:44:50 2022; PSS : Pas de clef ThomX  
Impossible de démarrer sans cette clef.
Entry   Entered by Super Team from 134.158.195.142 on Fri Jan 14 15:02:49 2022; Ouverture iris laser 2022-01-14_mesure_charge.png
Ouverture de l'iris laser PC au maximum => augmentation de la charge a 65 pC +- 1.2pC
Entry   VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
9h30 Start of the modulator and lasser (GATE is closed).

9h46 Data is taken as background.

Cavity is tuned to 500.38 MHz. Optimization of the energy and phase. 
Entry   VK, IC. VM; Orbit correction, BLM in the Ring 7x
The BLM detector boxes were installed in the ring. We connected 3 fibers and 2 scintillator detectors in th ring to be able to observe the beam losses.

Cabling, connection and checks of the BLM without the beam.

Machine start-up. Modulator was switched on at ~9h30.
Entry   ND, SC, Marie Labat, IC, VM; Opérations caméra à balayage / MRSV 20x
8h50 Mise en chauffe modulateur

Changement de la carte mère pour la badgeuse de la ligne X

31.2degres, toujours dAlignement laser dans la casemate
Entry   IC, VM, VK, AL, JH; Optimization of the ring 6x
Start of the modulator at 9h45

11h30 Problem with water regulation. Probably falseread of GUN PT100. Hayg and Viktor is tryig to adjust manually the temperature of the chiller
for RF gun. We stopped at the settings as attached.
Entry   ND, IC, VK, VM; Optimisation LE scan_ext_kicker_from_-8150_to_-8050_step_5.pngscan_ext_kicker_from_-8100_to_-8080_step_1_v2.pngscan_EL_PS_DP_01.pngScreenshot_from_2025-01-09_17-49-53.pngScreenshot_from_2025-01-09_17-52-20.png
15h Scan extraction kicker vs EL/BPM.01.

See attached plots.

Some interferences with ring storage.
Entry   ND; Operations du 7/11/2022 Screenshot_from_2022-11-07_14-07-30.pngscan_charge_phase_min_0.0_max_360.0_14_5_57.pngscan_charge_phase_min_140.0_max_180.0_14_6_41.pngdispersion_figure.png
10:50 Fin intervention CFP

Intervention laser photocathode toujours en cours et prioritaire mais preparation casemate.

11:10 Pb vide dans health check resolu.
Entry   ND, VC, KD, VK; Operations du 13/10/2022 Screenshot_from_2022-10-13_14-44-35.pngscan_charge_phase.png2022-10-13_17_16_21_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.pngcamera_delay_scan_full.pngcamera_delay_scan.png
Les limites en courant ont été implémentées  dans les DS alimentation pour toutes la machine comformément au
fichier "https://atrium.in2p3.fr/c40d9e45-476b-4e9a-9a0b-e05bb635888a"

 
Entry   RC, DN, VC, ND; Operations 21/09  scan_Laser_vs_RF_phase_2023_09_21_15_53.png
Modulateur en chauffe avant 14h

mise en place d'une synchronisation compatible à la génération de X "synchrone"

1- un deuxieme synthé ring est mis en place qui délivre le 500.25MHz anneau à la cavité RF (le synthé n'est
Entry   VK,VM,IC,ND; Operations 18/1 10x
9:05 Git pull

9h14: Demarrage modulateur

10h22 Client 3 does not respond; Reboot the machine
Entry   ND/AM/LP/VK/VI; Operations  
Test interface démarrage automatisée:

9h30: Allumage modulateur Ok

9h35: Allumage Frigo OK
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023; Nouvelle position laser/cathode (du 29 mars) 
Nouvelle position laser/cathode du 29 mars : x=4.91mm / y=2.40mm
Entry   ND; Notifications sonores changement d'etat klystron Screenshot_from_2024-05-24_14-52-04.pngScreenshot_from_2024-05-24_14-52-37.png
Ajout d'un systeme de notification sonore sur client1 quand le klystron change d'etat.

Dans l'interfce on peut la tester/demarrer/arrete dans la ligne "sound"  (cf copie d'ecran).

Pour changer les sons dans jive aller dans LI/HFI/klystron_alarm et choisir le fichier son choisi.