  683   Thu Feb 16 19:25:09 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 16 19:24:54 2023Not FixedUrgentDiag   Voila en pj le status de cette semaine
sur les calib LINAC BPM et Yag

Calib BPM LI BPMTL1 YAGTL1
 calib-bpm-yag.pdf 
  690   Tue Feb 21 10:23:56 2023 MJ KD HGNot FixedUrgentLinac Commissionning Synchro HS 10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas
 sst1charge.png 
  Draft   Fri Mar 3 11:49:50 2023 VK VMNot FixedShift summaryLI | Ring | Linac Commissionning | Ring Commissioning Shift 03 Start modulator; alims;

We cannot start machine. No e-beam.
Timing laser RF? Need help of linac team. 
  
  701   Fri Mar 3 12:08:59 2023 VK VMNot FixedShift summaryLI | Ring | Linac Commissionning | Ring Commissioning RE: Shift 03 evreything is ok

The laser shutter was closed !
Becareful the shutter state is inverted.
  
  702   Fri Mar 3 12:29:49 2023 VK VMNot FixedShift summaryLI | Ring | Linac Commissionning | Ring Commissioning RE: RE: Shift 03 Il se passe des choses pendant la nuit
qui mette les diags de la machine en radent
:
  
  703   Fri Mar 3 19:19:18 2023 KD, SC, VCNot FixedProblemLI | TL | Ring | Diag | SY | Electronique | Linac Commissionning | Ring Commissioning Jitter énergie icon4.gif Aujourd'hui lors du shift un phénomène
étrange a été observé
:
  
  706   Mon Mar 6 12:16:31 2023 MJ HG KD VCNot FixedUrgentLinac Commissionning URGENT SST off  Camera SST inutilisable en debut de shift.
IL FAUT ABSOLUMENT ARRETER de faire
des trucs sur les cameras entre 2 shifts
 SST_HS_023-03-06_12-14-40.png2023-03-06_14-44-27.png2023-03-06_14-49-54.png 
  711   Mon Mar 13 12:18:02 2023 MJNot FixedUrgentLinac Commissionning IHM SST HS - URGENT IHM sst HS en debut de shift cf image :
toutes les cases show camera sont blanches
yag 2 3 4 !! RIEN ne marche
 IHM_HS_2023-03-13_12-42-01.pngScreenshot_from_2023-03-13_12-55-32.png 
  713   Mon Mar 13 13:54:31 2023 MJNot FixedUrgentLinac Commissionning Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!!  Le bouton PHASE CANON sur le panneau
IHM NE FONCTIONNE PLUS !

plus d'acces a la phase canon.
  
  812   Mon Oct 30 09:39:05 2023 MaherNot FixedProblemInfra eau refroidissement circuit principal Bonjour

J'ai trouvé ce matin
( lundi 30/10 ) la pompe du circuit de refroidissement
  
  838   Thu Feb 1 11:50:28 2024 MJNot FixedShift summaryLI | TL | LE | Ring | Linac Commissionning Attenuateur LIL / Puissance LIL / Energie electrons La puissance entree canon a ete verifie
et conforme a l'atterndu (6 MW = 18/3
MW)
  
  860   Wed May 15 15:23:14 2024 MEK, HG, DNNot FixedProblemLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section Disjonction de PA 15h00=

Disjonction de PA 15h36

Etape 1 conditionnement : 1µs
 plots_vide_section.png 
  891   Fri Jul 26 10:12:42 2024 M.O, M ELK , Iryna, HaygNot FixedLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 26/07 signaux RF mesurés :

avec Oscillo :

orange
 0.1dB_2us_10Hz_16-41-51.png0.1dB_2us_10Hz_16-34-07.pn0.1dB_2us_10Hz_17-15.png 
  963   Fri Nov 15 12:13:42 2024 Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024Not FixedInfoTL Charge excess in the TL By looking at the BPM transmission tool
one can see that there is more charge on
TL/BP.03 than on TL/BPM.02 (see attached
 Screenshot_from_2024-11-15_12-12-55.pngScreenshot_from_2024-11-15_12-12-46.png 
  987   Fri Dec 20 14:00:06 2024 Entered by Nicolas Delerue from 134.158.195.142 on Fri Dec 20 13:59:52 2024Not FixedProblemInfra Alarme sur les rondes A 13h30 j'ai tent'e de faire un
acces controle dans la casemate.

Quand j'ai pris la 1ere clef
  
  988   Sat Dec 21 01:08:59 2024 Entered by Nicolas Delerue from 80.119.21.73 on Sat Dec 21 01:08:39 2024Not FixedQuestionInfra Question de logique... Ci-joint, message sur l'affichage à
l'entrée de la casemate ce midi.

Question de logique: Si l'accès
 IMG_20241220_132433_1.jpg 
  991   Thu Jan 9 10:31:11 2025 Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 9 10:30:34 2025Not FixedProblemCC DS ThomX_PhotoCathode using a lot of CPU The load on client5 is 29 making all operations
slow.

Appently the DS ThomX_PhotoCathode
 Screenshot_2025-01-09_10-30-03.pngScreenshot_from_2025-01-09_10-32-26.png 
  1044   Fri Mar 21 08:37:09 2025 VMNot FixedProblemLI | RF D1 Modulador problem 08h38 There is problem with the Linac modulator

08h55 Fixed with Maher help
  
  1047   Mon Mar 31 09:46:56 2025 Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025Not FixedProblemVide Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 09h45 Problem
with vacuum in the septum. TL-V3 and EL-V1
are closed.
  
  1160   Tue Dec 2 09:28:15 2025 Entered by Super Team from 134.158.205.28 on Tue Dec 2 09:27:54 2025Not FixedInfoLI | TL | LE | Ring | Diag | Linac Commissionning | Ring Commissioning Shift ThomX/Xrays : Soucis démarrage icon4.gif Last Recettes for 50 MeV: