  Draft   Fri Mar 13 08:33:25 2026 Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026      08h32 Warm-up ThomX: Modulator, Laser,
Fridge

08h37 Chillers were started, cycling
  
  Draft   Thu Mar 19 07:46:50 2026 Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026    , entered from 127.0.0.1 7h45: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

8h46 The photocathode laser image
  
  Draft   Wed Mar 25 07:28:22 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026 Shift summaryLinac Commissionning | Ring Commissioning Ring studies 7h30 : mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

08h40 HV ON
  
  Draft   Wed Apr 8 07:29:51 2026 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)    , entered from 127.0.0.1 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

8h30 HV is ON
  
  Draft   Tue Apr 14 08:03:01 2026 IC,VM Shift summaryLinac Commissionning | Ring Commissioning Beam studies. preparation for 40 MeV 8h00 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

10h Problem with modulator; It
  
  Draft   Thu Apr 16 07:32:25 2026 Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026    , entered from 127.0.0.1 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

9h00 HV is ON
 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png 
  Draft   Fri Apr 17 07:40:22 2026 IC,VM, HG, RC, DN Shift summaryLinac Commissionning | Ring Commissioning beam studies. FPC.  7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

08h45 HV is on
  
  Draft   Mon Apr 20 10:37:11 2026 IC Shift summary    10h30 : mise en chauffe  (frigo/chillers,
modulateur, laser, cyclage)

All rondes are broken, THOMX key
  
  Draft   Wed Apr 22 10:26:28 2026 IC,VM      Dalkia solved the problem with vooling
circuit in the morning

10h15 mise en chauffe  (frigo/chillers,
  
  Draft   Thu Apr 23 09:06:22 2026 IC, VM      9h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  Draft   Fri Apr 24 08:05:11 2026 Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026    , entered from 127.0.0.1 8h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  Draft   Wed Jun 3 08:41:41 2026 IC, HG, JNC Shift summary  Restart of the accelerator 02/06/2026

~15h30 Starting all system

16h Start up of the modulator,
  
  Draft   Tue Jun 9 10:13:24 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026      10h02 Start-up modulator, laser, fridge,
chillers

The SF6 pressure is low. Magnet
  
  Draft   Tue Jun 16 11:34:11 2026 IC, VM Shift summary  Restart of the accelerator 11h20 Try to restart the accelerator. Start-up
modulator, laser, fridge, chillers

Problem, with all magnets control
  
  1247   Tue Jun 16 13:43:30 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 16 13:43:02 2026 FixLI   Hello,

I short-circuit the MPS input to
modulator, we can trig modulator, the klystron
  
  Draft   Thu Jun 18 07:37:17 2026 IC, VM Shift summary  Ring working point studies 07h35 Start-up modulator (does not go to
standby), laser, magnets, cycling.

9h50 HT ON
  