HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 33 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Importantdown Subject Icon Text Attachments
  636   Wed Nov 30 11:44:22 2022 HG/CB/KDUnder ProcessLinacLI | Linac Commissionning Twiss = F(Solé) Phase de Q max : 195, on decale de -50
degrés

IRIS :0.7 mm, att  400, charge
  
  637   Thu Dec 1 01:14:36 2022 Entered by Nicolas Delerue from 80.119.21.73 on Thu Dec 1 01:14:20 2022New SolutionShift summaryRing | Diag Beam time / Thursday 1st December 

9:10 Il y a quelqu'un de DEKRA
qui deambule seul dans l'IGLEX sans dosimetre.
 11x 
  638   Fri Dec 2 08:27:45 2022 KD, ND, IC, VM, VKUnder ProcessShift summaryRing | Ring Commissioning shift du 2 décembre 2022 8h15 : démarrage de la chauffe (Frigo,
Modulateur, laser) 
Problème avec le login operateur
 7x 
  639   Mon Dec 5 08:34:54 2022 KDUnder ProcessShift summaryLI shift du 5 décembre 2022 8h15 - 8h30 : Vidange de la fosse Nord
et mise en chauffe de la machine.

Remise en eau de la boucle primaire
  
  640   Tue Dec 6 09:05:17 2022 MJ KDUnder ProcessShift summaryLI shift du 6 decembre 2022 9h : Mise en chauffe modulateur et Frigo
et Chiller
- Remise en eau de la boucle
 Calibration_camera_SST-02.pptxScreenshot_from_2022-12-06_15-37-50_BUG_SST.png 
  641   Tue Dec 6 09:54:56 2022 ND, VCUnder ProcessInfoRing Intervention synchro 9:55 Intervention synchro en cours pour
regler l'ajustement de la phase et la
puissandce de la cavite RF.
  
  642   Wed Dec 7 09:07:27 2022 KDUnder ProcessShift summaryLI | Linac Commissionning shift du 7 decembre 2022 9h : Mise en chauffe 
ajout d'eau dans la boucle principale
(3 bars --> 4bars)
  
  643   Wed Dec 7 11:39:22 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Dec 7 11:39:09 2022 Shift summaryLinac Commissionning Dipole extraction : signe du courant a mettre Selon les mesures qu'on vient de faire
Hayg et moi : Il faut mettre une intensite
NEGATIVE sur le dipole d'extraction pour
  
  644   Wed Dec 7 14:17:55 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Dec 7 14:17:27 2022 LinacLinac Commissionning realignement 1er doublet de dipole Les 2 tetes (tete = partie cote mur) du
premier doublet de dipoles viennent d'etre
legerement "remontees" --> rotation
  
  645   Wed Dec 7 16:58:54 2022 Entered by Super Team from 134.158.195.142 on Wed Dec 7 16:58:42 2022 Shift summaryLinac Commissionning Linac measurements @ différent modulator voltage settings   

Modulateur : 1070 V

On se met à la phase de
  
  647   Thu Dec 8 10:05:38 2022 ND, IC, VK, VM, MEUnder ProcessShift summaryRing | Ring Commissioning Shift 8/12 9h: Mise en Chauffe modulateur + Frigo
+ Laser
Il n'y a plus de perte de pression
 14x 
  648   Fri Dec 9 08:24:20 2022 KDUnder ProcessShift summaryRing Commissioning shift du 9 decembre 2022 8h25 : Mise en chauffe (pression eau toujours
OK)

 Intervention casemate :
  
  649   Fri Dec 9 11:07:57 2022 Entered by Super Team from 134.158.195.141 on Fri Dec 9 11:07:40 2022Under ProcessAnneauRing   Phase Qmax = 138

Phase Emax = 88

energy jitter
 Screenshot_from_2022-12-09_16-53-05.pngScreenshot_from_2022-12-09_16-52-44.png 
  650   Fri Dec 9 18:26:56 2022 MJ HG KD Shift summaryLinac Commissionning LE passee ce soir faisceau sur yag 5 On vient  passe la LE (dipole dextraction
a commander en local)

recette sauvee
 Faisceau_dans_la_LE_2022-12-09_18-36-53.png 
  651   Mon Dec 12 10:26:13 2022 SC/MJ Shift summaryLinac Commissionning Linac + TL divers Mise en chauffe modulateur et refroidissement

modulateur 1090  - iris 1.3 
- phase ch max 142  -  energie
 yag_TL2.pngBPM_LI.png 
  652   Mon Dec 12 15:49:21 2022 Entered by Marie Jacquet from 134.158.89.45 on Mon Dec 12 15:49:05 2022Not FixedShift summaryLinac Commissionning IHM BPM, "mean" HS ? Les "mean" ne semblent plus fonctionner
dans l'IHM bpm. Les cases "mean"
etaient tout le temps a zero ce matin pour
  
  653   Mon Dec 12 16:27:12 2022 Entered by Marie Jacquet from 134.158.89.45 on Mon Dec 12 16:26:59 2022Not FixedShift summaryLinac Commissionning Yag Li et TL1 : quid de la calibration ?  Ci-joint le bilan BPM
et YAG vs steerer d'aujourd'hui (100
pC canon, 100 pC section, iris 1.3, soleno
 2022-12-12-BPM-YAG-STR.pdf 
  Draft   Tue Dec 13 11:31:17 2022 KD, HGUnder ProcessLinacLI | TL | LE Run Linac   

Energie laser : 240 µJ en sortie
Laser
  
  655   Wed Dec 14 11:55:33 2022 HG/CB/KD Shift summaryLinac Commissionning run du 14 décembre 2022 Mesure twiss TL

réalignement laser cathode
: position H5.82mm et V3.59mm
  
  656   Thu Dec 15 13:11:15 2022 KDUnder ProcessShift summaryLI | Laser | Linac Commissionning shift du 15 decembre 2022, entered from 134.158.195.141 12h : intervention casemate sur laser photocathode.

énergie mesurée sur
différents points de fonctionnement
  
ELOG V3.1.4-395e101