580
|
Fri Oct 7 11:57:24 2022 |
IC, VM, VK, AL, JH | Under Process | Shift summary | Ring Commissioning |
|
Optimization of the ring | |
Start of the modulator at 9h45
11h30 Problem with water regulation. Probably falseread of GUN PT100. Hayg and Viktor is tryig to adjust manually the temperature of the chiller for RF gun. We stopped at the settings as attached.
12h20 Trying to set-up the beam
13h Problem with the Linac Trigger Laser delay, laser pulse is after the RF pulse end (see screenshot attached). We tried to ajust the delays but inthis case the dark current is very large ~80 pC, bigger then the actual beam charge. We came back to the initial settings.
Not clear what has been changed since yesterday. Need help from the injector team.
15h30 Problem is solved. It was the wrong value of the Largeur pulse HT. The nominal value is 5 us.
16h Setting the injector and try to inject in the ring
Optimization of the TL. It would be really good to have the
- Closed dispersion
- Beam centered in the QUADs (at least 2 last ones)
The TL was set, so that we can inject with almost no losses (see screenshot)
Was difficult to get several turns. It turnned out that the kicket timig was not correct. Not clear who chqnge it.
19h We reistablished the storage and try to optimize it.
|
| Attachment 1: Screenshot_from_2022-10-07_12-01-52.png
|
 |
| Attachment 2: Screenshot_from_2022-10-07_13-06-26.png
|
 |
| Attachment 3: Screenshot_from_2022-10-07_19-36-07.png
|
 |
| Attachment 4: Screenshot_from_2022-10-07_19-35-51.png
|
 |
| Attachment 5: Screenshot_from_2022-10-07_17-09-45.png
|
 |
| Attachment 6: Screenshot_from_2022-10-07_19-35-29.png
|
 |
|
579
|
Fri Oct 7 00:30:24 2022 |
Entered by Marie Jacquet from 88.165.97.136 on Fri Oct 7 00:30:03 2022 | | Shift summary | Linac Commissionning |
|
shifts LINAC 4/10 et 6/10 | |
4/10 : Prise de donnees "Alignement LINAC" (Hayg Marie)
Iris 1.5
Charge Ict_LI : 18-20 pC
E_canon = 5.2 MeV
Charge Ict_TL : 16-18 pC
E_section 52 MeV
CR a venir
06/10 17-20h30 Prise de donnees "Alignement LINAC (Marie)
Iris 1.5
Charge Ict_LI : 48-49 pC
E_canon = 5.3 MeV
Charge Ict_TL : 18-20 pC
E_section 53 MeV
CR a venir
ict_LI ~ 48-49 pC et ict_TL ~ 20 pC. Aucune valeur de steerer ne m'a permis de transmettre plus ... Je ne comprends pas pourquoi on perd un facteur 2 aujourd'hui en passant la LIL et/ou pourquoi en sortie canon on a ~50 pC aujourd'hui et seulement 20 mardi ... A suivre |
|
578
|
Thu Oct 6 10:18:03 2022 |
VK/ND/SC | | Anneau | Ring Commissioning |
|
Faisceau Anneau | |
Modulateur Impossible à passer en Standby ==> problème manque d'eau.
* Remise à ~4bars le réseau principal
* Restart du soft du modulateur (sinon l'erreur reste)
* Conductivité à 7MOhm
10h : Démarrage modulateur et refroidissement (MO)
Modulateur 1090V, Mise en place du feedback position laser
Scan charge phase avec iris à 4 mm, phase de charge max phi = 366 degres
Iris 4 mm Qmax sur LI/SST.01 = 80.7 pC std 14.2
Iris 3 mm Qmax = 64.6 std 14.2 pC
Iris 2 mm Qmax = 32.4 std 11.2 pC
Iris 1 mm Qmax = 10.4 std 11.9 pC
Mesure energie avec les steerers : 52 MeV
Chargement recette du vendredi 30/09 (19-22-04)
-------------------------------------------------------------------------------------------------------------
Problème licence matlab :
Warning: Directory already exists.
> In quad_TLSST1_thomx_Dark_dim_bary_v3 (line 87)
License checkout failed.
License Manager Error -4
Maximum number of users for Image_Toolbox reached.
Try again later.
Troubleshoot this issue by visiting:
https://www.mathworks.com/support/lme/R2018b/4
Diagnostic Information:
Feature: Image_Toolbox
License path: /data/operateur.thomx/.matlab/R2018b_licenses:/home/debian/R2018B/licenses/license.dat:/home/debian/R2018B/licenses/network.lic
Licensing error: -4,132.
Error in quad_TLSST1_thomx_Dark_dim_bary_v3 (line 154)
h1=drawrectangle('Position',[length(K(1,:,1))/2-50 length(K(:,1,1))/2/2-50 50 50]);pos = round(customWait(h1));% position signal
-------------------------------------------------------------
Faisceau pour anneau
Ouverture iris 2 mm (25 pC environ)
Ouverture iris 4 mm Qenergie max = 66 pC (phi energie max = 216)
Ok pour injection et tours dans l'anneau
Sauvegarde recette recepe_LI_TL_RI
13h13 Recipe saved for the ring. Injection optimised.
14h Camera MRSV non accessible => a verifier dans la casemate
14h05 etude de l' effet de l' iris laser sur LI/DG/BPM.01. Les 4 copies d'ecran correspondent a 4 valeurs d'iris different de 4mm a 1mm.
16h Etude systematique de la position sur LI/DG/BPM.01 vs iris. Cf images jointes.
L'attenuation etait trop forte, a basse charge (iris ferme) la position etait domine par le bruit.
Si l 'attenuation est trop forte (32dB), les mesures saturent. Il faut regler l 'attenuation de LI/DG/BPM.01 a -15dB.
Étude similaire sur TL/DG/BPM.01. Cf images jointes. Il faut regler l 'attenuation de TL/DG/BPM.01 a 0dB.
Arret machine 16h26.
Note: RI-C2/DG/MRSV n'était pas branché. Il va falloir se procurer les câbles correspondants.
|
| Attachment 1: Screenshot_from_2022-10-06_14-05-37.png
|
 |
| Attachment 2: Screenshot_from_2022-10-06_14-05-52.png
|
 |
| Attachment 3: Screenshot_from_2022-10-06_14-06-26.png
|
 |
| Attachment 4: Screenshot_from_2022-10-06_14-06-45.png
|
 |
| Attachment 5: bpm_0_Att_31.0_vs_iris.png
|
 |
| Attachment 6: bpm_0_Att_15.0_vs_iris.png
|
 |
| Attachment 7: bpm_0_Att_0.0_vs_iris.png
|
 |
| Attachment 8: bpm_1_Att_0.0_vs_iris.png
|
 |
| Attachment 9: bpm_1_Att_15.0_vs_iris.png
|
 |
| Attachment 10: bpm_1_Att_31.0_vs_iris.png
|
 |
|
Draft
|
Wed Oct 5 19:02:28 2022 |
VK, VM, HG,IC, AL | | | |
|
| |
Shift started with machine receipy from Monday .
Scan parameters, injection to find orbit in the ring. Testing alghrithms for orbit correction.
15.55 Energy , charge not stable, asked Hayg to stabilize .
Ring Dipoles up 160.4A
Problem with steerers : RIC2 STR02-V01 and RIC1/ STR.05-H01 NEED TO BE REPAIRED
Fixed orbit correction gui. Units in libera are [nm] should be in [mm] to correctly scale currents.
|
|
Draft
|
Tue Oct 4 17:34:09 2022 |
Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 | | Shift summary | |
|
Planning shift Thursday 6th October | |
- Study beam position on SST and BPM vs iris size / TL/BPM.01
- Start AcQAttrManager
- Study RDP vs TL/BPM.02
- Start MRSV
|
|
Draft
|
Tue Oct 4 15:47:22 2022 |
MJ/HG/SC | | Linac | Linac Commissionning |
|
Alignement linac | |
Modulateur HV=1090V enregistrement des Pic
Faisceau linac en cours
Programme : Mesures d'alignement linac
|
|
574
|
Mon Oct 3 20:31:09 2022 |
VK, AL, IC | Reference Solution | Shift summary | Ring Commissioning |
|
Beam is stored | |
Shift started at 18h
With the current injector settings, it was difficult to inject. We loaded the settings from last Friday 30/09 (19-22-04).
Principal steps:
- Correction of the one quadrupole polarity this morning
-injection tuning, observation of Turn-by-Turn-X, Turn-by-Turn-Y and Sum
-quads focusing, defocusing +-.0.5%
-iterative manual adjustments of corrctors, DPI, Septum, Kicker
-orbit correction with open line model response matrix
- several datasets taken for further postprocessing
Beam is stored !!!!! ~400 turns (limited by the Libera response)
Stored beam, visible more than 300 turns, signal decay as estimated due to Libera cutoff filters. To store more, RF cavity should be used.
Stable closed orbit!
Important milestone is achieved.
No losses at scintillator/fiber except for the injection, see oscilloscope screenshot.
Current machine settings are stored in recipe_recipe_LI_TL_RI_20221003_20_24_01.txt
Orbit is stable for more than one hour. End of the shift.
|
| Attachment 1: Screenshot_from_2022-10-03_20-34-31.png
|
 |
| Attachment 2: Screenshot_from_2022-10-03_20-27-05.png
|
 |
| Attachment 3: Screenshot_from_2022-10-03_20-26-19.png
|
 |
| Attachment 4: Storage_TbTsummary2_03102022.png
|
 |
| Attachment 5: Storage_TbTsummary1_03102022.png
|
 |
| Attachment 6: closed_orbit_03102022.png
|
 |
|
Draft
|
Mon Oct 3 14:08:06 2022 |
VC/KD/SC | New Solution | Linac | Linac Commissionning |
|
Faisceau linac | |
13h : MO : Mise en chauffe modulateur et mise en route refroidissement
14h : Fermeture casemate, démarrage
Problème avec client 2
14h11 : Cyclage des aimants de la TL
Démarrage modulateur, Interlock vide sur le MPS
Mesure Pic environ 216mV et Prc environ 14 mV (mesure moyennée prise en fin de pulse)
Mise en route du feedback position laser
Phase de charge max = 266 degres
Iris 2 mm charge = 35 pC +/- 14 pC
Iris 1 mm charge = 10 pC +/- 14 pC
Iris 3 mm charge = 67 pC +/- 15 pC
Mesure energie faisceau, phase canon = 226 et phase section = 96
remarque: quand on sauve une recette avec IHM recette, les valeurs sauvées sont les valeurs de commande des éléments. (meme si les valeurs ne sont pas validées et effectives dans les éléments) lors du chargement des recettes nous avons eu des surprises!
|
|
572
|
Mon Oct 3 12:51:26 2022 |
Slava, Viktor M, Iryna | Fixed | Problem | Ring Commissioning |
|
Check the QUADs in the ring | |
On last Friday, we found that there is a potential problem with QUAD 9, 10 an 12 as by switching them OFF, we obtained better transport and finally had the evidance of the seconf full turn.
RI-C2/PS/QP.09
RI-C2/PS/QP.10
RI-C2/PS/QP.12
Today, we checked the polarity and found that the polarity of the RI-C2/PS/QP.10 was inversed at the level of power supply (even though was checked last time in July). We have restore the good polarity of the RI-C2/PS/QP.10 by swapping the cables at the PS.
We plan to check the beam transport in the afternoon. |
|
571
|
Fri Sep 30 08:30:38 2022 |
AM, VI, VK, IC, VC, ND | New Solution | Shift summary | Ring Commissioning |
|
Shift du 30/09/2022 | |
AM :
Hier soir : extinction des PC clients1 et clients 2
ce matin : Aucun problème pour l'instant
Ces deux pc devrait être éteint regulièrement pour leurs permetre d'être dans un état optimum (sinon bcp de processus orphelin peuvent les ralentire)
pression vanne vide : 8.4 bar
resistivité eau : 7.4 Mohm
Health_check :
Jauge dans l'anneau en erreur : -> verifier quel jauge a été supprimer est les enlever de la verification d'état
RI-C1/PS/STR.05-H.01 : (Même problème qu'hier)
- En ALARM
- Status :
port 1 configured as -- no information --
SIGMAPHI-6 REMOTE OPERATION
Alimentation Port 1 DC OFF
Alimentation Port 1 SOFTWARE INTERLOCK
RI-C2/PS/STR.02-V.01 :
- En ALARM
- Status :
port 1 configured as -- no information --
SIGMAPHI-6 REMOTE OPERATION
Alimentation Port 1 DC OFF
Alimentation Port 1 SOFTWARE INTERLOCK
Pas de soucis empechant le démarrage de la machine !
8h30 : allumage frigo / modulateur
allumage chiller
allumage element magnetique Li, TL, ring (sauf septum et kicker) -> cyclage de tout les aimants lancé
allumage laser
9h15-9h45 : intervention pont roulant
-> prochaine intervention mardi matin ?
9h50 : ronde casemate
9h55 : allumage modulateur
-> tombé a 990V : pb vide
10h :
client 1 planté, plus accessible même en ssh depuis client2 (redamarré en hard)
enregistrement des mesure de puissances sur les Redpitaya
-PiGun DPd03-CHA
-PI LIL RDP-01-CHA
-GunLOOP DPd04-CHA
10h30 Scan charge vs phase; Qmax=271 degree
10:55 Faisceau centr'e sur LI/SST.01: PS/STR01 H=-0.6 V=-0.2
Rechargement recette LI TL RI 20220929 15h30
11h Mise a energie max: 235 degree.
enregistrement de la postion faisceau sur TL/BPM.02 pour correler les variations de position faisceau avec les variations de puissance RF
12h Balayage Septum en temps et en voltage (voir images jointes).
Quads RI-C2 : 09;10 ; 12 OFF. No losses at fiber and signature of the full second turn. Good signal at ri-c1/BPM01
Need to verify Quads
|
| Attachment 1: Screenshot_from_2022-09-30_12-40-22.png
|
 |
| Attachment 2: bpm_0_vs_septum.png
|
 |
| Attachment 3: bpm_1_vs_septum.png
|
 |
| Attachment 4: bpm_2_vs_septum.png
|
 |
| Attachment 5: bpm_0_vs_septum_kicker_off_delay_40us.png
|
 |
| Attachment 6: bpm_1_vs_septum_kicker_off_delay_40us.png
|
 |
| Attachment 7: bpm_2_vs_septum_kicker_off_delay_40us.png
|
 |
| Attachment 8: bpm_0_vs_septum_kicker_off_delay_45us.png
|
 |
| Attachment 9: bpm_1_vs_septum_kicker_off_delay_45us.png
|
 |
| Attachment 10: bpm_2_vs_septum_kicker_off_delay_45us.png
|
 |
| Attachment 11: bpm_1_vs_kicker_voltage_5000V.png
|
 |
| Attachment 12: bpm_2_vs_kicker_voltage_5000V.png
|
 |
| Attachment 13: bpm_1_vs_kicker_voltage.png
|
 |
| Attachment 14: bpm_2_vs_kicker_voltage.png
|
 |
| Attachment 15: Screenshot_from_2022-09-30_19-15-15.png
|
 |
| Attachment 16: Screenshot_from_2022-09-30_19-16-53.png
|
 |
|
570
|
Thu Sep 29 07:59:51 2022 |
AM, IC, VK, VI, SC, ND | | Shift summary | LI | TL | Ring | Diag |
|
Shift du 29/09/2022 | |
AM :
git pull sur $HOME_IHM
pression vanne vide : 5.7 bar
resistivité eau : 7.2 Mohm
Health_check :
Jauge dans l'anneau en erreur : -> verifier quel jauge a été supprimer est les enlever de la verification d'état
RI-C1/PS/STR.05-H.01 :
- En ALARM
- Status :
port 1 configured as -- no information --
SIGMAPHI-6 REMOTE OPERATION
Alimentation Port 1 DC OFF
Alimentation Port 1 SOFTWARE INTERLOCK
Pas de soucis empechant le démarrage de la machine !
8h00 : allumage frigo / modulateur
allumage chiller
allumage element magnetique Li, TL, ring (sauf septum et kicker)
9h :
Demarrage modulateur
Scan charge-energie/phase:
- phase max charge : 275
-> phase max energie : 225
- scan enegrie phase : Pas concluant (faisceau pas focalisé la plus par du temps)
10h Intervention synchro. Les deux position observees pour le declenchement du laser devraient disparaitre.
10h30 L'intervention SPR a entrain'e un arret du modulateur => remise en chauffe. Perte de 1h30 de temps faisceau.
11h47 Pb modulateur avait ete mis en local. Perte de temps pour trouver la panne...
11h50 Faisceau allume
12h00 Pas de laser...
12h50 Scan charge, energy vs phase.
Max charge: 273 degrees;
13h05 ajustement phase energie max: 234
14h scan septum scan kicker
Valeur de retard recommandee pour le kicker -7,233us
15h arret machine
Client 2 ne répond plus
- Connection SSH dessus depuis client 1 pour tuer les processus en cours
- extinction du client2 proprement une fois le controle de la machine revenue
- extinction du client1 aussi dans le doute
Program de la journ'ee:
1) Scan energie phase
2) Retablir le transport
3) Scan en temps du Septum
4) Scan en temps du kicker
5) Transport to RI-C1/BPM.01
6) Scan correcteurs vers BPM.01 to transport to BPM.02
Si necessaire, scan du kicker d'extraction
|
| Attachment 1: charge_phase.png
|
 |
| Attachment 2: Screenshot_from_2022-09-29_14-57-55.png
|
 |
| Attachment 3: bpm_0_vs_septum.png
|
 |
| Attachment 4: bpm_1_vs_septum.png
|
 |
| Attachment 5: bpm_2_vs_septum.png
|
 |
| Attachment 6: bpm_1_vs_septum.png
|
 |
| Attachment 7: bpm_0_vs_kicker.png
|
 |
| Attachment 8: bpm_1_vs_kicker.png
|
 |
| Attachment 9: bpm_2_vs_kicker.png
|
 |
|
569
|
Wed Sep 28 19:14:11 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 28 19:13:52 2022 | | Shift summary | Linac Commissionning |
|
Shift du 12-13/09 en image | |
En pj, les donnees "Alignement LINAC" du 12-13/09, en image (donnees brutes notees dans le elog le 16/09).
J'espere ne pas avoir fait d'erreur dans le traitement ... Reprise de donnees (meme principe mais avec plus de charge) prevue mardi prochain (le 4/10) |
| Attachment 1: 2022-09-28-elog.pdf
|
|
568
|
Wed Sep 28 08:31:27 2022 |
VC VK AM IC & all | Under Process | Shift summary | Ring Commissioning |
|
Shift du 28/09/2022 |
|
AM :
git pull sur $HOME_IHM
pression vanne vide : 8 bar
resistivité eau : 7.3 Mohm
Health_check :
Jauge dans l'anneau en erreur : -> verifier quel jauge a été supprimer est les enlever de la verification d'état
RI-C2/PS/STR.02-V.01 :
- En ALARM
- Status :
port 1 configured as -- no information --
SIGMAPHI-6 REMOTE OPERATION
Alimentation Port 1 DC OFF
Alimentation Port 1 SOFTWARE INTERLOCK
LI/OP/OPT.02-LAS.01-OSL.01:
- Etat : FAULT
- Status : OK
Est il pertinant de la conserver dans Health_Check et/ou de considéré que le "state" FAULT revoie une erreur "FAULT" ?
Moteur miroir laser en gris (state inconnu) :
- State : MOVING
-> ajout de l'état "MOVING" de gravité "OK" dans les fichier de config Health_Check
Pas de soucis empechant le démarrage de la machine !
8h30 : allumage frigo
allumage chiller
8h40: mise en chauffe Modulateur
8h50: allumage laser/ shutter de securuté fermé
10h modulateur démarré
10h30 scan charge phase Qmax 50pC à 275°
Trend mesure phase sortie oscillateur laser ne fonctionne pas (IP http://192.168.229.21)
visualisation OK sur Soft propriétaire
dipole passé 156.6A phase section 108
recharge recette recipe_recipe_LI_TL_RI_20220923_15_07_00.txt
11H
Injection dans l'anneau
13H15 HT modulateur off
14h restart the machine
Nicolas H and Alex L from SOLEIL came to participate in the shift.
Nicolas H configured phase_offset for all Libera to reduce the jutter in the TbtSum signal. After this, the signal became more stable.
Nicolas H, VC, VM and IC measured the jutter of the BPM wrt the injection trigger. it was found that the jitter is 12 ns !!!!! Then, it was also confirmed by measuring the jitter on the scitillator detector signal. This is a big problem, which should be considered/solved asap.
With the help of Alex L, the good transport is done until the last BPM of the Ring (see file attached). The task now is to try to futher correct the trajectory for the second turn. From the vertical orbit we suspect that dipoles could be missaligned at the IP region. To be checked if it is compatibe with the simulations.
Discussion on the allignment of the Ring should be organized to get the last measurement results and understand, what can be done in terms of the correction of the dipole tilts/shifts if it will be needed.
The example of the one possible trajectory is attached.
With the scintillator detector installed near the septum, we see the beginning of the second turn (see file attached). It is useful diagnostics as the BPM will give the evidence of the 3rd turn only (Libera averages the signal from 2 turns).
19h20 Tuning of the trajectory. More or less flat stable trajectory. Work is ongoing.
21h50 End of the shift
|
| Attachment 1: Screenshot_from_2022-09-28_19-05-00.png
|
 |
| Attachment 2: Screenshot_from_2022-09-28_19-08-26.png
|
 |
| Attachment 3: first_turn28092022.png
|
 |
|
567
|
Tue Sep 27 08:40:33 2022 |
VC SC CB | Under Process | Shift summary | LI | Linac Commissionning |
|
Shift du jour | |
Summary:
- Mesure du jitter et de la position relative de pulse laser PC avec la RF canon (3GHz)
- Mesure de la puissance section et Boucle Canon à la puissance nominale
Demarrage Frigo 8H30 Chiller et Modulateur 8h40
Fin installation oscilloscope et laser dans la casemate (branché directement) 10h48
Visualisation signal boucle sur oscilloscope, enregistré sur le scope
Stabilité estimée triggé sur laser sur table optique casemate à 1.5 ps sdev (correspond à la résolution du scope)
Mesure de stabilité prolongée le temps du repas
Phase de max foc autour de 1 degérs, on bouge donc le phaseshifter dans sps laser : la phase de max foc devient 271 degrés, iris de 1mm
charge phase @15h30
-50 degrés soit 221 degrés, solenoide à 198 A
steerer 1 H -1.62A, V 0.81A
I dipole 154.4 A, phase RF section 108 degrés, bord de l'écran 156.2A (droit), l'autre
@ 15h51, dérive de phase laser, en cause le chiller qui s'est éteint
I dipole 156.2 A, phase RF section 106 degrés,
Idipole 155.6 A, 104deg,
Idipole 154.6A, 102 deg
idipole 153.8A, 100 deg
I dipole 156.2A, 108 deg bis
I dipole 156.6A, 110 deg
Idipole 157.0A, 112 deg
Idipole 156.6A,114deg
Idipole 156.6, 116 deg
Idipole 156.4A, 118 deg
Idipole 154.3, 122 deg
Idipole 155.4, 120 deg
17h47 Arret machine
|
|
566
|
Mon Sep 26 16:30:56 2022 |
Vincent Chaumat | Under Process | Linac | LI | Linac Commissionning |
|
Mesure puissance Canon et section | |
Mesure de la puissance dans la bouble (cristal + redpitaya)
mesure sur les 20 derniers points de l'impulsion RF
la variation de la mesure (en tension) est inférieure à 2mV peak to peak ie 1% de la mesure
Mesure de la puissance incident section (cristal + redpitaya) (atténuateur guide -10dB)
mesure sur les 20 derniers points de l'impulsion RF
la variation de la mesure (en tension) est de 4mV peak to peak ie 12% de la mesure
|
| Attachment 1: pBoucle.png
|
 |
| Attachment 2: Pisection.png
|
 |
|
565
|
Mon Sep 26 09:58:14 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Sep 26 09:57:59 2022 | Fixed | Info | Laser | Linac Commissionning |
|
Laser status | |
Bonjour, le shutter-linac a été replacé, on peut le sceller maintenant (il faut fixer une date). L'énergie UV sur la cathode =38µJ (Iris=3mm).
Viktor. |
|
564
|
Fri Sep 23 08:48:20 2022 |
Entered by Super Team from 134.158.195.141 on Fri Sep 23 08:39:36 2022 | | Shift summary | Ring |
|
Shift du 23/09/2022 | |
AM :
État a l'arrivé :
8h30 : Victor dans la casemat en accès controlé/mode maintenance canon pour faire des tests sur le chutter Laser
Resistivité de l'eau : 6.85 Mohm
Presion vanne vide : 7 bar
Health check :
- li/op/opt.02-las.01-osl.01 :
- état : FAULT
- status : OK
- Normal ? (laser fonctionel)
- EL/PS/QP.07 :
- état : server_off
- -> demarrage du server :
- état : FAULT
- Status : PowerSupplyManager : Failed to start Power Supply.
- Re-extinction du server
- EL/PS/QP.05 :
- état : ALARM
- status :
- port 1 configured as -- no information --
SIGMAPHI-6 REMOTE OPERATION
Alimentation Port 1 DC OFF
Alimentation Port 1 INTERNAL INTERLOCK HARD
- RI-C2/PS/STR.02-V.01 :
- état : ALARM
- Status :
- port 1 configured as -- no information --
SIGMAPHI-6 REMOTE OPERATION
Alimentation Port 1 DC OFF
Alimentation Port 1 SOFTWARE INTERLOCK
- Vanne de vide de l'anneau :
- état : FAULT
- -> FaultAck sur toute les vannes permet de corriger le problème
- Nouvel état : OK
- Jauge de l'anneau : Plusieurs sont éteinte (probablement des jauge suprimer, modification dans les fichier de configue de Health_Check nécésaire)
Pas de problème empechant le démarrage de la linac, la TL et l'anneau
Chiller/Frigo déjà allumé
8h50 : Mise en chauffe modulateur
-> Victor a fini. Repasser en mode Exploitation n'arrete pas le chauffage du modulateur
9h50 : Chauffage Modulateur fini
Passage en standby
Plus de 10min après toujours "standby on request" -> reset -> Passage en standby immediat
10h05 : passage en Trig (a 990V)
-> modulateur tombé
10h10: Modulateur en trig
10h15 : Alimage des elements magnétique
chargement recette : recipe_recipe_LI_TL_RI_20220919_21_25_56.txt
10h20 : scan charge/phase : sauvé dans /data/shared/Commissioning_tools/Mesure/20220923/scan_charge_phase_modulateur_1010V.png
phase charge max : 390 (=30[360])
=> phase energie max : 340
10h37 : passage du modulateur a 1090V
=> Modulateur tombé
rallumage a 1090V -> tombé
rallumage a 1040V -> ok
Monté lente (10V toute les 30s) à 1090V -> OK
11h : nouveau scan charge/phase avec le modulateur a 1090V
-> sauvé dand : /data/shared/Commissioning_tools/Mesure/20220923/scan_charge_phase_modulateur_1090V.png
Allure différente du cas precedant (maximum de charge plus au niveau de la chute de charge, mais 20deg avant)
Phase de chute de charge : 370
Phace de maximum de charge : 350
Phase d'énergie max : 320 ?
11h05 :
Allumage dipole TL/PS/DP.01
11h10:
recherche de la phase d'energie max du canon en modifiant la phase et charchant a avoir le maximum de courant dans le dipole TL/PS/DP.01
Energie max autour de 305-310
Pas très concluant,
11h20 : retour sur le linac
test du script energie-charge/phase scan avec la bobine de foc a 210
Scans sauvé :
- scan_charge_phase_foc_210A.png : scan charge vs. phase clasique
- scan_energie_phase.png : scan position du faisceau sur LI/DG/SST.01 avec Li/PS/STR.01-H = -1.5A vs. phase
phase >= 340 : faisceau dificilement différenciable du courant d'obscurité
Si on augmente la force (en valeur absolu) du steerer : faisceau ce déplace vers la gauche de l'image (position en pixel plus faible)
=> Plus le faisceau a d'énergie, moins il est devié, plus la position est grande
PTS a 335 potentielement aberant (pb de focalisation du faisceau
=> Max energy : 300
12h : retour dans le ligne dispersive
Dipole a 157A
Phase section a 114deg (semble minimiser les fluctuation lateral du faiceau)
12h10 :
Faisceau en TL/DG/SST.03
Toute le charge est transmise mais de large fluctuation laterale entraine des pertes de faisceau a certain tir
11h15 :
Test d'injection dans l'anneau :
Dipole d'injection : 7.58A
Septum 90V
Faisceau visible sur le BPM RI-C1/DG/BPM.02-LIB.03 (BPM2) et un peu sur le BPM suivant aussi (BPM3)
12h17: Allumage du kicker :
Le faisceau atteind les 6 premier BPM
12h20:
Modification courant Septum pour avoir le faisceau a +8.9mm dans le BPM2 (valeurs Théorique d'après MadX)
Imposible... Max atteint : 6mm avec courrant 100V
-> Signal dans le dernier BPM : 1 tour fait !
12h25 :
Mise de courrant dipole de l'anneau a la meme valeur que les dipoles de la TL (157A)
Modification kick du kicker pour améliorer le transport
Large fluctuation (+-2mm) Déplacement en temps du kicker a -7.241µs au lieu de -7.26µs -> augmente le kick induit par le kicker et reduit les fluctuations dans le BPM 3 => plus proche du plateau
13h :
Modification du transport dans l'anneau
14h :
Save recette puis load recette : Perte du faisceau dans l'anneau !!!
-> Le pb viens du kicker/Septum. Le load recipe remet a 0 le current et donc l'alim passe ne mode current_regulation et plus voltage_regulation
15h :
Slava prend la main
Test de script de correction d'orbite avec les deviateurs l'anneau
15h50 : Arret machine pour la visite
16h30-19h Injection tuning. Orbit correction . Beam is not stable. Very difficult to work on the first trajectories in the Ring. At the end of the shift we found more stable conditions. Probably, the reason for energy jitter in the injector should be understood and mitigated.
19h-22h Orbit measurements and correction. No significant improvements in terms of the second turn. Signal at two last BPM drops significantly by 3-4 times.
At sone conditions, scintillator detectore installed near the septum showed the signal spaced by 60 ns => lost particiles at the end of the 1st turn or beginning of the 2nd ?
|
| Attachment 1: sum23092022.png
|
 |
| Attachment 2: xorbit23092022.png
|
 |
| Attachment 3: yorbit23092022.png
|
 |
| Attachment 4: jitterBPM1_23092022.png
|
 |
| Attachment 5: first_turn_orbit2_23092022.png
|
 |
| Attachment 6: xyjxytudtyu.png
|
 |
|
Draft
|
Thu Sep 22 10:08:30 2022 |
Entered by Hayg Guler from 134.158.91.29 on Thu Sep 22 10:08:17 2022 | Fixed | | |
|
, entered from 134.158.91.29 | |
|
|
562
|
Thu Sep 22 00:29:04 2022 |
ND, SC, AM, VK, IC, VI | Under Process | Shift summary | Ring | Diag |
|
Mesures du 22/09 | |
9h demarrage modulateur et schillers
Cyclage aimants
Asservissement laser ON
10h25 : Scan charge phase
11h Reglage linac
LI/ICT.01 50pC avec iris=2mm
12:00 Ligne deviee: Faisceau instable
12:30 Camera timing scan on TL/DG/SST.01 (see attached plot) + Trying to fix trigger issue on TL/DG/SST.02
14:00 Single shot OTR!!!
15:00 Faisceau stable sur TL/DG/SST01 avec steerer ON mais instable sur TL/DG/SST.02
=> Faisceau instable en energie
16:00 Rechargement de la recette du 19/9 a 21h25 => faisceau dans l 'anneau
16:30 Septum voltage 97V
Debut du second tour oberve sur le scintillateur!
Septum optimum timing=-38us
Kicker timing -7.250us (see attached plot: No effect on RI-C1/BPM.02, strong effect on RI-C1/BPM.03, medium effect on RI-C2/BPM.01)
19:00 Arret
Le modulateur n'est pas tombe de la journee.
Plan for the beam time
1) Start the llinac
2) Scan in time camera LI/DG/SST.01
3) Re-establish beam transport to ring
4) Scan in time the septum
5) Scan in voltage the septum
6) Adjust timing of kicker by looking at induced noise on ICTs
7) Scan in time the kicker
8) Scan in voltage the kicker
9) Adjust steerers as needed... |
| Attachment 1: scan_charge_phase.png
|
 |
| Attachment 2: camera_delay_scan_m40us.png
|
 |
| Attachment 3: camera_delay_scan_long_delay.png
|
 |
| Attachment 4: 2022-09-22_13_58_54_tl_dg_sst_01-ccd_01_log_scale_False_despeckle_False_min_scale_30_max_scale_50.png
|
 |
| Attachment 5: bpm_0_vs_septum.png
|
 |
| Attachment 6: bpm_1_vs_septum.png
|
 |
| Attachment 7: bpm_2_vs_septum.png
|
 |
|
561
|
Thu Sep 22 00:00:43 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 | | Shift summary | LI | Diag | Linac Commissionning |
|
RE: BPM LINAC + TL : dispersion tir a tir ? | |
CALC/DG/MeanStd1 permet déjà d'avoir la déviation standard de la position mesurée sur 100 tirs pour LI/DG/BPM.01 (et de même avec CALC/DG/MeanStd2 pour la ligne de transfert).
| Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 wrote: |
|
Aujourd'hui Iriya m'a montre en salle de controle une "etendue" de ~4mm de l'orbite du faisceau mesuree sur le premier bpm de l'injection (celui appele bpm 2 je crois) sur une vingtaine de tirs. Ca semblait pareil pour 500 tirs, i.e. ~4 mm). C'est beaucoup ... (Iryna peut-etre pourrais-tu mettre ce que tu m'as montre dans le elog ?)
--> Ce que je suggere de faire des que possible (vu avec Hayg) : un script permettant de mesurer cette etendue de l'orbite tir a tir sur les 5 BPM LINAC + TL, pour voir si cette dispersion est presente qq part avant, ou bien si elle est creee seulement au niveau de l'injection.
Bonne soiree
|
|