600
|
Mon Oct 24 10:28:57 2022 |
MO | | Shift summary | Linac Commissionning |
|
| |
10h30 lancement des IHM ( via Terminal ) , démarrage modulateur, frigo et chillers |
|
599
|
Fri Oct 21 08:12:27 2022 |
VC VK IC | Under Process | Shift summary | Ring Commissioning |
|
Commissionning | |
8H15 demarrage chauffage Klystron et chiller
9h15 bunker ouvert (intervention société extérieure jusqu'à 9H30)
10H injection dans l'anneau avec recette 20221020-1420
14.20 come back to shift after seminar
-adjust TL 154.7 and Ring dipoles 156.56
- injection optimization with RCDS . 7parameters: dpi, Kicker, Septum, H,V steeres 3 and 4 of TL
- orbit correction
-data taking
ri-c2 /BPM 01-Lib04, need to be checked. Horizontal Orbit is always around 4 mm at that position.
|
|
598
|
Thu Oct 20 08:56:39 2022 |
SC, ND | | Anneau | Diag |
|
Shift du 20/10/2022 | |
8h56 Démarrage modulateur et refroidissement
9h20: git pull => mise a jour des IHM SST et BPM (git pull qui n'avait pas ete fait cette semaine)
10:05 Demarrage Scan charge phase
10:13 Interlock. Intervention CTA?
10:15 Charge max: Phase=260 => Energy max: Phase=210 Charge ~85pC (Iris=1.3mm)
11:13 Chargement recette recipe_recipe_LI_TL_20221018_14_30_21.txt
11:19 Chargement recette Saturation_TL_SST1_recipe_LI_TL_straight_20221018_11_49_54
Observation faisceau sur LI/SST.1 => Max intensity = 2000
Optimisation solenoide
Observation faisceau sur LI/SST.1 => Max intensity = 4000
11:30 Intervention RedPitaya. La permutation s'est bien passee. La RDP doit maintenant etre mise dans son chassis.
12:00 Etude saturation ecrans
Pas de saturation quand on reduit l'intensite (cf images jointes).
50% sur LI/SST.01
10% sur TL/SST.01
12:24 Chargement recette recipe_recipe_LI_TL_20221018_14_30_21.txt
Q(TL/DG/ICT2)=70pC
Pas de saturation sur TL/SST.2
|
| Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_9_12.png
|
 |
| Attachment 2: scan_charge_phase_min_230.0_max_280.0_10_15_56.png
|
 |
| Attachment 3: Screenshot_from_2022-10-20_11-56-48.png
|
 |
| Attachment 4: Screenshot_from_2022-10-20_11-57-21.png
|
 |
| Attachment 5: Screenshot_from_2022-10-20_11-57-34.png
|
 |
| Attachment 6: Screenshot_from_2022-10-20_11-57-49.png
|
 |
| Attachment 7: Screenshot_from_2022-10-20_12-00-41.png
|
 |
| Attachment 8: Screenshot_from_2022-10-20_12-01-49.png
|
 |
|
597
|
Wed Oct 19 17:00:28 2022 |
KD | New Solution | Shift summary | LI | TL | LE | Diag | Linac Commissionning |
|
shift du 19 octobre 2022 | |
démarrage faisceau 15h45
Programme : essaye recette de la veille
Un fois la phase énergie max trouvé :
--- Il faut réajuster la focalisation sur TL/SST1
--- ajuster si nécessaire la dispersion avec la phase de la section (éteindre QP4 avant pour plus de précision)
--- ajuster la focalisation avec QP6 et QP7
Recette ~ OK
*** Problème
La camera LI/SST ne voit rien ! Obligé d'augmenter l'acquisition à 0.08ms (cf. screenshots) !
Saturation encore présente sur TL/SST1
|
| Attachment 1: LI_SST_NOK_2022-10-19_17-04-39.png
|
 |
| Attachment 2: LI_SST_OK_2022-10-19_17-02-16.png
|
 |
|
596
|
Tue Oct 18 19:03:32 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 18 19:03:13 2022 | Not Fixed | Shift summary | Linac Commissionning |
|
Besoin urgent de mesures BPM LI et TL1 fiables | |
Je reviens de nouveau sur les donnees BPM LI et TL1, qui sont inutilisables telles quelles. En effet, je dois prendre, au debut de chaque shift, une serie de donnees BPM_LI puis BPM_TL1 en faisant varier le steerer_ LI puis le str_TL1, puis fiter chaque serie par une droite, puis utiliser un coeff de correction par BPM et par jour pour corriger mes donnees ...
Ci-joint le bilan de 3 jours differents : le 6 le 12 et le 17 octobre
En abscisse : c'est le deplacement attendu calcule a l'aide de l'intensite du steerer (strLI ou strTL1), des caracteristiques du steerer, des coordonnees Z des elements,
En ordonnee : c'est le deplacement mesure aux BPM (LI ou TL) ou aux YAG (LI ou TL)
Visible sur ce pdf, les mesures YAG sont parfaitement comptatiblex avec ce qui est attendu, mais les mesures des BPM pas du tout, les facteurs correctifs variant de jour en jour, et aussi pas le meme facteur pour BPM_LI ou BPM_TL pour un jour donne ...
Des mesures correctes des positions aux BPM sont absolument necessaires pour une reconstruction fiable des axes magnetiques des elements du LINAC.
Bref, Nicolas, peux-tu faire qqchose stp ?
Merci d'avance. |
| Attachment 1: 2022-10-18-BPM-YAG-STR.pdf
|
|
595
|
Tue Oct 18 17:39:58 2022 |
Entered by Super Team from 134.158.195.142 on Tue Oct 18 17:39:43 2022 | Not Fixed | Problem | Laser |
|
Voyant rouge en salle Laser |
|
Voyant apparu vers 17h
SPR est passé voir : peut-etre en lien avec la clim
ce serait la centrale de traitement d'air dont le premier filtre est encrassé. Voyant rouge sur la CTA.
Est-ce que quelqu'un sait à quoi est relié ce voyant rouge ?
|
|
594
|
Tue Oct 18 10:27:19 2022 |
KD, SC | Fixed | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 18 octobre 2022 | |
9h50 : Démarrage
Mesure énergie : 52 MeV
iris : 1.3 mm
charge : ~ 100pC (100% de transmission sur toute la TL) : cf. screenshot
* Saturation écran TL/SST1 lors de l'optimisation du premier waist (recette sauvée sous : Saturation_TL_SST1_recipe_LI_TL_straight_20221018_11_49_54), (cf. screenshot). Pareil sur LI/SST (cf. screenshot)
* Il y a du bruit sur TL/BPM.03 par rapport au mouvement (imperceptible à l'oeil) du faisceau sur l'écran TL/SST.03 et le bmp TL/BPM.04. Qui croire ? (cf. screen shot)
* Ligne de transfert prete pour injection (manque inputs de l'anneau pour la trajectoire). Recette sauvée sous "recipe_recipe_LI_TL_20221018_14_30_21", (cf. screenshot pour entrée anneau).
===> QP.04 et QP.05 n'ont pas la meme valeur (meilleur point stable) ce qui est bizarre : on rentre peut etre trop focalisé dans la TL (jouer sur QP.03)
*** Programme
* Finaliser les codes d'alignement automatique
==> les BPM saturent encore un peu, mise à 12dB l'atténuation ==> beaucoup moins de bruit et plus précis (cf. screenshot)
* Definir une recette pour injection anneau : recipe_recipe_LI_TL_20221018_14_30_21
-- Ajustement à faire :
* phase canon (charge max - 50deg)
* Phase section (réduire la dispersion sur l'écran TL/SST.02)
* Fermer la dispersion en jouant sur QP.04 et QP.05
* ajuster la taille du faisceau en jouant sur QP.06 et QP.07
* ajuster l'axe d'injection en jouant sur TL/STR.03 et TL/STR.04
* Injection EL :
-- Impossible car pas de caméra, nous sommes à l'aveugle jusqu'au premier BPM. Il faudrait utiliser le Scintillateur d'injection dans l'anneau pour voir où le faisceau est perdu.
* mise en place correction injection (si temps)
-- Prise de données faites. Modèle à ajuster.
Fin de programme.
*** Observations ***
Le faisceau vit beaucoup en forme.
|
| Attachment 1: TL_BPM01_8dB_2022-10-18_10-57-52.png
|
 |
| Attachment 2: TL_BPM01_12dB_2022-10-18_10-53-43.png
|
 |
| Attachment 3: IXDXE_11h32.png
|
 |
| Attachment 4: Saturation_TL_SST1_2022-10-18_11-48-32.png
|
 |
| Attachment 5: Saturation_LI_SST_2022-10-18_13-39-55.png
|
 |
| Attachment 6: defaut_BPM_TL_2022-10-18_14-25-05.png
|
 |
| Attachment 7: faisceau_entree_anneau_2022-10-18_14-29-50.png
|
 |
| Attachment 8: Charge_2022-10-18_14-39-55.png
|
 |
|
593
|
Mon Oct 17 18:18:23 2022 |
MJ KD | | Shift summary | Linac Commissionning |
|
axe MAG de QP4 et de QP5 vs axe MAG Q1-Q3 - degrossissage ... | |
str1H -1.37 - str1V 0.51 - strTL1H -5 = a peu pres axe mag Q1-Q3
A partir de la, SANS courant dans q1 q2 q3, faisceau sur YAGTL2
Alignement horiz de QP4 avec le dipole (156.9 A --> Qp4 aligne horizontalement)
Alignement vert de QP4 avec strTL1V : -2A
Pour aligner QP5 : necessite d'avoir du courant dans QP5 pour voir qq chose sur YAGTL3 (tous le autres QP toujours a zero) --> Faisceau focalise uniquement en vertical
Alignement vert QP5 : strTL2V -6 (plus les -2A strTL1V d'avant)
Alignement de QP5 seulement avec strTL2V (strTL1V=0 donc) : ~ -10A
Conclusion du jour : a premiere vue (vraiment premiere vue), les axes MAG de QP4 et QP5 sont "plus bas" que l'axe MAG Q1-Q3
a suivre ...
|
|
592
|
Mon Oct 17 09:09:13 2022 |
KD, MJ | Fixed | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 17 octobre 2022 | |
Redémarrage ThomX :
* remise en pression d'eau sur la boucle principale (légèrement inférieur à 4bars à l'arret).
* PSS HS (écran freezé) ==> rémarrage de l'écran de l'automate (nécessite la clé de l'armoire)
* mise en chauffe du modulateur (9h)
Programme journée :
* essaie d'alignement automatique (laser photoCathode + quad)
* génération d'une recette pour injection dans l'anneau (mesure émittance + énergie)
* Tests correction orbite TL
*********
* L'alignement automatique du laser sur la PhotoCathode semble fonctionner mais est très bruité dû au bruit sur les BPM (~1mm en X)
De plus il y a une saturation sur les BPM (LI et TL/BPM.01 au moins), cf. Screenshot ==> cela doit destabiliser l'alignement automatique.
* Alignement Steerer VS QP, même constat que pour la photocathode. Le bruit des BPM limite la résolution de l'algorithme
* Mesure Alignement QP de la TL ==> manque données BPM pour TL/BPM.04 (mean, std des positions)
|
| Attachment 1: Screenshot_from_2022-10-17_15-25-06.png
|
 |
|
591
|
Fri Oct 14 12:59:34 2022 |
Entered by Marie Jacquet from 134.158.205.43 on Fri Oct 14 12:59:10 2022 | | Info | Linac Commissionning |
|
Schema position elements LINAC | |
Demande par plusieurs personnes, je vous transmets ici mon schema de la position des elements dans le LINAC |
| Attachment 1: LINAC-position-elements.bmp
|
|
590
|
Fri Oct 14 09:05:46 2022 |
ND, VK, IC, VM, AL | Under Process | Shift summary | Ring | Ring Commissioning |
|
Shift du 14/10/2022 | |
8:50 Mise en chauffe modulateur, allumage frigo+chiller
Resisistivete eau: 6,6Mo
9:05 Client2 plant'e => redemarrage
9:45 HV On
Scan charge phase. Max charge=255
Phase E_max 207
Q~ 130pC
Fermeture Iris laser jusqu'a 1mm
Q~100pC
Phase section dispersion min: 103.
TL/BPM.02:
X=1.08
Y=0.7
RMS position: 0.2mm
10:26 Beam in the ring
Optimization of the injection and storage (see fig attached). At the end, injection with no losees!
Preparation for the orbit correction eluminating not working correctors. After several studies and iterations, we suceeded to correct the orbit (see the fig attached). Meanwhile, it seems that the BPM ri-c2/dg/bpm.04-lib.05 (quite certain as it did not respond to the corrector change) and probably ri-c1/dg/bpm.04-lib.03 do not give the proper readings. This point should be checked as soon as possible.
Problem with ChD of the ri-c2/dg/bpm.04-lib.05 (see the fig attached). We checked the connection in the rack5. We found that the BPM ri-c2/dg/bpm.04-lib.05 ChA was swaped with ChA BPM ri-c2/dg/bpm.06-lib.05 => Slava changed it. Now it is OK. BUT still ChD stays without signal. The problem is in the casemat probably. To be checked.
Starting the preparation for the first tune estimation. For this, we switched ON the sextupoles (see fig attached). Withour sextupoles, the FFT signal is too "noisy".
Optimization of the injection with the multiparameter optimizer RCDS, work in progress.
Alims IHM is updated by Slava to have separetly hor. and vert. correctors displayed.
18h30 End of the Shift.
|
| Attachment 1: scan_charge_phase_0_360.png
|
 |
| Attachment 2: scan_charge_phase_min_240.0_max_280.0_10_7_12.png
|
 |
| Attachment 3: Screenshot_from_2022-10-14_17-01-27.png
|
 |
| Attachment 4: FFT_TbT_tune.png
|
 |
| Attachment 5: closed_orbit2_14102022.png
|
 |
| Attachment 6: Screenshot_from_2022-10-14_10-37-11.png
|
 |
| Attachment 7: Screenshot_from_2022-10-14_17-30-30.png
|
 |
| Attachment 8: Screenshot_from_2022-10-14_17-32-26.png
|
 |
| Attachment 9: Screenshot_from_2022-10-14_17-46-56.png
|
 |
| Attachment 10: Screenshot_from_2022-10-14_18-00-58.png
|
 |
|
589
|
Thu Oct 13 17:41:13 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Oct 13 17:41:00 2022 | | Shift summary | Linac Commissionning |
|
Alignement LINAC (canon-LIL-QUADs) | |
Ci-joint le bilan, au jour d'aujourd'hui, des reconstructions Horizontales et Verticales des axes MAG Canon, LIL et QUADs a l'aide de diverses prises de donnees.
Marie |
| Attachment 1: 2022-10-13-elog.pdf
|
|
588
|
Thu Oct 13 10:26:06 2022 |
ND, VC, KD, VK | Under Process | Shift summary | Diag | Ring Commissioning |
|
Operations du 13/10/2022 | |
Les limites en courant ont été implémentées dans les DS alimentation pour toutes la machine comformément au fichier "https://atrium.in2p3.fr/c40d9e45-476b-4e9a-9a0b-e05bb635888a"
9h15: Le frigo, le chiller et les elements pulses etaient encore allumes depuis hier soir.
Demarrage modulateur
Acces CFP. Clef acces laser oublies dans la casemate => acces complet.
Installation du MRSV (mise en hors service temporaire de EL/DG/SST).
11h Ronde fermeture casemate
11h05 Pb modulateur. Tentative appel support
Absence permis zone modulateur...
11:25 La ronde de la zone modulateur n'avait pas ete faite.
11:30 Trig
11h35 Pb Vide...
11:45 Pas de laser sur la camera laser photocathode mais photocourant en scan charge phase a 200-250.
Camera laser photocathode defaillante
Charge max 200pc (iris laser 2.3mm), phase 254.
Ajustement iris laser 1mm => Charge moyenne 100pC
Pas de recette de cette semaine?
Chargement recette: recipe_recipe_LI_TL_RI_20221007_20_09_40.txt
Extinction TL/PS/DP
Observation faisceau sur TL/DG/SST01: Pas de saturation; Pixel max a 600.AcqAttrManager ne demarre pas. CC contacte.
Observation ADC BPM TL/BPM.01: Pas de saturation
12h30 Pb demarrage septum
13h IHM EP added to Plateforme IHM
13h05 Pb septum resolu
13h25 Transport jusqu'a TL/SST3
Sur TL/SST2 le faisceau est a -2mm en X...
14h Acces pour reparation TL/SST.02 (ne fonctionnait pas sur routeur avec RI-C2/MRSV)
14h30 Iris mis a 1.3mm
14h40 Pb jive (cf image attachee)
15h Scan image saturee
16h Test AcqAttrManager: cela fonctionne mais des erreurs a analyser. L'acquisition tombe a 1Hz avec 2 BPM et deux ICTs.
17h Injection dans l'anneau. Recette sauvee: recipe_recipe_LI_TL_RI_20221013_16_51_32.txt
Valeurs de positions:
TL/DG/BPM.03_LIB.02: SpX=-1.95 SpY=-0.09
TL/DG/BPM.04_LIB.02: SpX=-1.36 SpY=1.00
Image TL/DG/SST.03 sauvee
17h15 Arret machine
git pull
===
Here is the program:
- Start modulator with automated script: Not done
- Access CFP until 10:00: OK
=> Disconnect TL/EL/SST.01 and connect MRSV: OK
- Test AcqAttrManager => Attente CC
- Emittance measurement on TL/SST.03 + Viktor
- Re-establish transport to the ring. Done
- Record TL/SST.03 + TL/BPM.03 and TL/BPM.04 for good ring injection.
- Adjust timing on TL/SST.02 |
| Attachment 1: Screenshot_from_2022-10-13_14-44-35.png
|
 |
| Attachment 2: scan_charge_phase.png
|
 |
| Attachment 3: 2022-10-13_17_16_21_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
|
 |
| Attachment 4: camera_delay_scan_full.png
|
 |
| Attachment 5: camera_delay_scan.png
|
 |
|
587
|
Thu Oct 13 00:49:19 2022 |
ND | Fixed | Shift summary | LI | Diag | MECA | Linac Commissionning |
|
RE: Shift du 12/10/2022 (prise de données) | |
Sur l'image jointe le pixel maximum est à ~750 donc on est loin de la saturation...
| KD, MJ, RC wrote: |
|
Mise en chauffe Modulateur vers 9h
9h - 10h : installation Laser 33MHz de la CFP par Ronic
Vers 10h Ronic informe qu'un des câble d'alimentation du boîtiers interlock du 1e dipôle de la CFP a été arraché par maladresse. Le fil a été re-soudé et attaché au bundle de câble.
Impossible de passer en TRIG ==> le PA est disjoncté ==> le MPS bloque le PA parce que les dipôles anneau sont en erreur. Après acquitement tout est OK
Faisceau à 11h.
Marie à refait les mesures d'alignement Quad.
Prise de donnée pour alignement automatique du laser sur la PhotoCathode
Prise de donnée pour alignement automatique dans les Quad (pseudo correction d'orbite)
==> les BPM saturent, les caméras sature losrque le faisceau est focalisé.
==> Les données sont peut être à jeter.
Arrêt machine 17h15
*** OBSERVATIONS ***
Lors des tests, nous avons trouvé un nouveau point d'alignement laser sur la photoCathode (5.0xx, 3.22). Les caractérisitques de ce point par rapport au point habituel :
- en dehors de la zone du courant d'obscurité. A la position du repique dans le scan phase-charge
- Insensible à la variation de phase à charge max
- Charge plus important (200pC au lieu de 150pC)
- Le faisceau est plus déformé (cf. image en PJ)
|
|
|
586
|
Wed Oct 12 20:11:14 2022 |
KD, MJ, RC | Fixed | Shift summary | LI | Diag | MECA | Linac Commissionning |
|
Shift du 12/10/2022 (prise de données) | |
Mise en chauffe Modulateur vers 9h
9h - 10h : installation Laser 33MHz de la CFP par Ronic
Vers 10h Ronic informe qu'un des câble d'alimentation du boîtiers interlock du 1e dipôle de la CFP a été arraché par maladresse. Le fil a été re-soudé et attaché au bundle de câble.
Impossible de passer en TRIG ==> le PA est disjoncté ==> le MPS bloque le PA parce que les dipôles anneau sont en erreur. Après acquitement tout est OK
Faisceau à 11h.
Marie à refait les mesures d'alignement Quad.
Prise de donnée pour alignement automatique du laser sur la PhotoCathode
Prise de donnée pour alignement automatique dans les Quad (pseudo correction d'orbite)
==> les BPM saturent, les caméras sature losrque le faisceau est focalisé.
==> Les données sont peut être à jeter.
Arrêt machine 17h15
*** OBSERVATIONS ***
Lors des tests, nous avons trouvé un nouveau point d'alignement laser sur la photoCathode (5.0xx, 3.22). Les caractérisitques de ce point par rapport au point habituel :
- en dehors de la zone du courant d'obscurité. A la position du repique dans le scan phase-charge
- Insensible à la variation de phase à charge max
- Charge plus important (200pC au lieu de 150pC)
- Le faisceau est plus déformé (cf. image en PJ) |
| Attachment 1: 2022-10-12_15_38_25_li_dg_sst_01-ccd_01_RAW_16bits.tiff
|
|
585
|
Tue Oct 11 11:57:19 2022 |
HG/CB | | Info | LI | TL | LE | Linac Commissionning |
|
run du 11/10/2022 | |
Iris de 2mm, prise d'image @12h --> dimension H 0.37mm et V 0.34mm
iris 1mm, prise d'image @12h14 --> dimension 0.28mm, 0.25mm
Iris 1.5mm, prise d'image @12h19 --> dimension 0.34mm, 0.3mm
Iris 1.3mm, prise d'image @ 12h22, 0.31mm, 0.29 mm, charge phase at 12h25, attenuation de 400 (Qmax290, Emax250pC)
Réalignement laser : position 5.856mm en x, et 3.41 en v
Compresseur à 60000 --> durée ?
Attenuation : 300--> 60 pC; 330 --> 140pC
focmax 247deg --> 197 deg, soleo at 198A
** REMARQUES **
---- Il semblerait que le BPM TL/DG/BPM.01 sature (cf. figure) les waveformes semblent écrétées.
|
| Attachment 1: BPM_saturation_2022-10-11_15-07-37.png
|
 |
|
584
|
Tue Oct 11 11:09:21 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 11 11:09:03 2022 | Not Fixed | Problem | Linac Commissionning |
|
Valeurs des BPM LI et TL_1 surestimees ? | |
Ci-jointes des donnees BPM et YAG LI et TL_1, prise le 20/06 puis le 06/10, en fonction de valeurs des steerers 1 (pour LI) et 3 (pour TL)
--> Les valeurs mesurees au BPM ont l'air surestimees d'environ 30%. |
| Attachment 1: 2022-10-11-BPM-YAG-STR.pdf
|
|
583
|
Mon Oct 10 17:20:11 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 17:19:55 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Bonjour, un téléscope (F1=150mm, F2=-75mm, réduction=2) a été installé sur la table optique dans la casemate (la monture du téléscope est très instable !!!)
l'énergie actuellle sur la cathode:
Iris 1mm - 57µJ
2mm - 96µJ
3mm - 120µJ
Viktor. |
|
582
|
Mon Oct 10 15:10:36 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 15:10:21 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Bonjour, l'énergie UV actuelle sur la cathode:
Iris 3mm - 92µJ
2mm - 62µJ
1mm - 23µJ
Viktor. |
|
581
|
Mon Oct 10 14:44:44 2022 |
KD, VS, SC | Fixed | Shift summary | LI | Laser |
|
shift du 10 octobre 2022 | |
Viktor est intervenu ce matin pour réaligner le laser sur un autre point du chemin optique (éviter la partie endommagée des miroirs).
Nouvelles mesures d'énergie :
Iris 3mm - 92µJ
2mm - 62µJ
1mm - 23µJ
14h46 Démarrage du modulateur
--> mesure scan-charge phase à 1mm d'iris : ~ 69pC charge max.
==> nécessité de mettre en place un telescope pour augmenter la charge.
* Prise de mesure pour alignement photoCathode.
Mise en place du téléscope /2.
iris 3 mm : 120uJ
2 mm : 97 uJ
1 mm : 57uJ
Tout semble Ok. Mesure de la charge à 1mm et ajustement avec l'atténuateur.
Le PA a disjoncté ==> Maher doit intervenir dans le modulateur. Mesure de charge à faire demain.
|