  600   Mon Oct 24 10:28:57 2022 MO Shift summaryLinac Commissionning   

10h30 lancement des IHM ( via Terminal ) , démarrage modulateur, frigo et chillers

  599   Fri Oct 21 08:12:27 2022 VC VK ICUnder ProcessShift summaryRing Commissioning Commissionning 

8H15 demarrage chauffage Klystron et chiller

9h15 bunker ouvert (intervention société extérieure jusqu'à 9H30)

10H injection dans l'anneau avec recette 20221020-1420

14.20 come back to shift after seminar

-adjust TL 154.7 and Ring dipoles 156.56

- injection optimization  with RCDS  . 7parameters: dpi, Kicker, Septum, H,V steeres 3 and 4 of TL

- orbit correction

-data taking

ri-c2 /BPM 01-Lib04, need to be checked. Horizontal Orbit is always around 4 mm at that position.

 

 

 

  598   Thu Oct 20 08:56:39 2022 SC, ND AnneauDiag Shift du 20/10/2022 

8h56 Démarrage modulateur et refroidissement

9h20: git pull => mise a jour des IHM SST et BPM (git pull qui n'avait pas ete fait cette semaine)

10:05 Demarrage Scan charge phase

10:13 Interlock. Intervention CTA?

10:15 Charge max: Phase=260 => Energy max: Phase=210 Charge ~85pC (Iris=1.3mm)

11:13 Chargement recette recipe_recipe_LI_TL_20221018_14_30_21.txt

11:19 Chargement recette Saturation_TL_SST1_recipe_LI_TL_straight_20221018_11_49_54

Observation faisceau sur LI/SST.1 => Max intensity = 2000

Optimisation solenoide

Observation faisceau sur LI/SST.1 => Max intensity = 4000

11:30 Intervention RedPitaya. La permutation s'est bien passee. La RDP doit maintenant etre mise dans son chassis.

12:00 Etude saturation ecrans

Pas de saturation quand on reduit l'intensite (cf images jointes).

50% sur LI/SST.01

10% sur TL/SST.01

12:24 Chargement recette recipe_recipe_LI_TL_20221018_14_30_21.txt

Q(TL/DG/ICT2)=70pC

Pas de saturation sur TL/SST.2

 

 

Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_9_12.png
scan_charge_phase_min_0.0_max_360.0_10_9_12.png
Attachment 2: scan_charge_phase_min_230.0_max_280.0_10_15_56.png
scan_charge_phase_min_230.0_max_280.0_10_15_56.png
Attachment 3: Screenshot_from_2022-10-20_11-56-48.png
Screenshot_from_2022-10-20_11-56-48.png
Attachment 4: Screenshot_from_2022-10-20_11-57-21.png
Screenshot_from_2022-10-20_11-57-21.png
Attachment 5: Screenshot_from_2022-10-20_11-57-34.png
Screenshot_from_2022-10-20_11-57-34.png
Attachment 6: Screenshot_from_2022-10-20_11-57-49.png
Screenshot_from_2022-10-20_11-57-49.png
Attachment 7: Screenshot_from_2022-10-20_12-00-41.png
Screenshot_from_2022-10-20_12-00-41.png
Attachment 8: Screenshot_from_2022-10-20_12-01-49.png
Screenshot_from_2022-10-20_12-01-49.png
  597   Wed Oct 19 17:00:28 2022 KDNew SolutionShift summaryLI | TL | LE | Diag | Linac Commissionning shift du 19 octobre 2022 

démarrage faisceau 15h45

Programme :  essaye recette de la veille

Un fois la phase énergie max trouvé :

--- Il faut réajuster la focalisation sur TL/SST1 

--- ajuster si nécessaire la dispersion avec la phase de la section (éteindre QP4 avant pour plus de précision)

--- ajuster la focalisation avec QP6 et QP7

Recette ~ OK

*** Problème

La camera LI/SST ne voit rien ! Obligé d'augmenter l'acquisition à 0.08ms (cf. screenshots) !

Saturation encore présente sur TL/SST1

 

Attachment 1: LI_SST_NOK_2022-10-19_17-04-39.png
LI_SST_NOK_2022-10-19_17-04-39.png
Attachment 2: LI_SST_OK_2022-10-19_17-02-16.png
LI_SST_OK_2022-10-19_17-02-16.png
  596   Tue Oct 18 19:03:32 2022 Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 18 19:03:13 2022Not FixedShift summaryLinac Commissionning Besoin urgent de mesures BPM LI et TL1 fiables 

Je reviens de nouveau sur les donnees BPM LI et TL1, qui sont inutilisables telles quelles. En effet, je dois prendre, au debut de chaque shift, une serie de donnees BPM_LI puis BPM_TL1 en faisant varier le steerer_ LI puis le str_TL1, puis fiter chaque serie par une droite, puis utiliser un coeff de correction par BPM et par jour pour corriger mes donnees ...

Ci-joint le bilan de 3 jours differents : le 6 le 12 et le 17 octobre

En abscisse : c'est le deplacement attendu calcule a l'aide de l'intensite du steerer (strLI ou strTL1), des caracteristiques du steerer, des coordonnees Z des elements,

En ordonnee : c'est le deplacement mesure aux BPM (LI ou TL) ou aux YAG (LI ou TL)

Visible sur ce pdf, les mesures YAG sont parfaitement comptatiblex avec ce qui est attendu, mais les mesures des BPM pas du tout, les facteurs correctifs variant de jour en jour, et aussi pas le meme facteur pour BPM_LI ou BPM_TL pour un jour donne ...

Des mesures correctes des positions aux BPM sont absolument necessaires pour une reconstruction fiable des axes magnetiques des elements du LINAC.

Bref, Nicolas, peux-tu faire qqchose stp ?

Merci d'avance.

Attachment 1: 2022-10-18-BPM-YAG-STR.pdf
  595   Tue Oct 18 17:39:58 2022 Entered by Super Team from 134.158.195.142 on Tue Oct 18 17:39:43 2022Not FixedProblemLaser Voyant rouge en salle Laser icon1.gif 

Voyant apparu vers 17h

SPR est passé voir : peut-etre en lien avec la clim

ce serait la centrale de traitement d'air dont le premier filtre est encrassé. Voyant rouge sur la CTA. 

Est-ce que quelqu'un sait à quoi est relié ce voyant rouge ?

 

  594   Tue Oct 18 10:27:19 2022 KD, SCFixedShift summaryLI | TL | LE | Linac Commissionning shift du 18 octobre 2022 

9h50 : Démarrage

Mesure énergie : 52 MeV

iris : 1.3 mm

charge : ~ 100pC (100% de transmission sur toute la TL) : cf. screenshot

 * Saturation écran TL/SST1 lors de l'optimisation du premier waist (recette sauvée sous : Saturation_TL_SST1_recipe_LI_TL_straight_20221018_11_49_54), (cf. screenshot). Pareil sur LI/SST (cf. screenshot)

 * Il y a du bruit sur TL/BPM.03 par rapport au mouvement (imperceptible à l'oeil) du faisceau sur l'écran TL/SST.03 et le bmp TL/BPM.04. Qui croire ? (cf. screen shot)

 * Ligne de transfert prete pour injection (manque inputs de l'anneau pour la trajectoire). Recette sauvée sous "recipe_recipe_LI_TL_20221018_14_30_21", (cf. screenshot pour entrée anneau).

===> QP.04  et QP.05 n'ont pas la meme valeur (meilleur point stable) ce qui est bizarre : on rentre peut etre trop focalisé dans la TL (jouer sur QP.03)

*** Programme 

* Finaliser les codes d'alignement automatique

==> les BPM saturent encore un peu, mise à 12dB l'atténuation ==> beaucoup moins de bruit et plus précis (cf. screenshot)

* Definir une recette pour injection anneau :  recipe_recipe_LI_TL_20221018_14_30_21

-- Ajustement à faire :

     * phase canon (charge max - 50deg)

     * Phase section (réduire la dispersion sur l'écran TL/SST.02)

     * Fermer la dispersion en jouant sur QP.04 et QP.05

    * ajuster la taille du faisceau en jouant sur QP.06 et QP.07

    * ajuster l'axe d'injection en jouant sur TL/STR.03 et TL/STR.04

* Injection EL :

   -- Impossible car pas de caméra, nous sommes à l'aveugle jusqu'au premier BPM. Il faudrait utiliser le Scintillateur d'injection dans l'anneau pour voir où le faisceau est perdu. 

* mise en place correction injection (si temps)

  -- Prise de données faites. Modèle à ajuster. 

Fin de programme.

 

*** Observations ***

Le faisceau vit beaucoup en forme. 

 

Attachment 1: TL_BPM01_8dB_2022-10-18_10-57-52.png
TL_BPM01_8dB_2022-10-18_10-57-52.png
Attachment 2: TL_BPM01_12dB_2022-10-18_10-53-43.png
TL_BPM01_12dB_2022-10-18_10-53-43.png
Attachment 3: IXDXE_11h32.png
IXDXE_11h32.png
Attachment 4: Saturation_TL_SST1_2022-10-18_11-48-32.png
Saturation_TL_SST1_2022-10-18_11-48-32.png
Attachment 5: Saturation_LI_SST_2022-10-18_13-39-55.png
Saturation_LI_SST_2022-10-18_13-39-55.png
Attachment 6: defaut_BPM_TL_2022-10-18_14-25-05.png
defaut_BPM_TL_2022-10-18_14-25-05.png
Attachment 7: faisceau_entree_anneau_2022-10-18_14-29-50.png
faisceau_entree_anneau_2022-10-18_14-29-50.png
Attachment 8: Charge_2022-10-18_14-39-55.png
Charge_2022-10-18_14-39-55.png
  593   Mon Oct 17 18:18:23 2022 MJ KD Shift summaryLinac Commissionning axe MAG de QP4 et de QP5 vs axe MAG Q1-Q3 - degrossissage ... 

str1H -1.37  - str1V 0.51  - strTL1H -5 =  a peu pres axe mag Q1-Q3

A partir de la, SANS courant dans q1 q2 q3, faisceau sur YAGTL2

Alignement horiz de QP4 avec le dipole (156.9 A --> Qp4 aligne horizontalement)

Alignement vert de QP4 avec strTL1V : -2A

Pour aligner QP5 : necessite d'avoir du courant dans QP5 pour voir qq chose sur  YAGTL3 (tous le autres QP toujours a zero) --> Faisceau focalise uniquement en vertical

Alignement vert QP5 : strTL2V -6 (plus les -2A strTL1V d'avant)

Alignement de QP5 seulement avec strTL2V (strTL1V=0 donc) : ~ -10A

Conclusion du jour : a premiere vue (vraiment premiere vue), les axes MAG de QP4 et QP5 sont "plus bas" que l'axe MAG Q1-Q3

a suivre ...

 

  592   Mon Oct 17 09:09:13 2022 KD, MJFixedShift summaryLI | TL | LE | Linac Commissionning shift du 17 octobre 2022 

Redémarrage ThomX :

     * remise en pression d'eau sur la boucle principale (légèrement inférieur à 4bars à l'arret).

     * PSS HS (écran freezé) ==> rémarrage de l'écran de l'automate (nécessite la clé de l'armoire)

     * mise en chauffe du modulateur (9h)

 

Programme journée :

   * essaie d'alignement automatique (laser photoCathode + quad)

   * génération d'une recette pour injection dans l'anneau (mesure émittance + énergie)

   * Tests correction orbite TL

 

*********

* L'alignement automatique du laser sur la PhotoCathode semble fonctionner mais est très bruité dû au bruit sur les BPM (~1mm en X)

De plus il y a une saturation sur les BPM (LI et TL/BPM.01 au moins), cf. Screenshot ==> cela doit destabiliser l'alignement automatique.

* Alignement Steerer VS QP, même constat que pour la photocathode. Le bruit des BPM limite la résolution de l'algorithme

* Mesure Alignement QP de la TL ==> manque données BPM pour TL/BPM.04 (mean, std des positions)

 

Attachment 1: Screenshot_from_2022-10-17_15-25-06.png
Screenshot_from_2022-10-17_15-25-06.png
  591   Fri Oct 14 12:59:34 2022 Entered by Marie Jacquet from 134.158.205.43 on Fri Oct 14 12:59:10 2022 InfoLinac Commissionning Schema position elements LINAC 

Demande par plusieurs personnes, je vous transmets ici mon schema de la position des elements dans le LINAC

Attachment 1: LINAC-position-elements.bmp
  590   Fri Oct 14 09:05:46 2022 ND, VK, IC, VM, ALUnder ProcessShift summaryRing | Ring Commissioning Shift du 14/10/2022 

8:50 Mise en chauffe modulateur, allumage frigo+chiller

Resisistivete eau: 6,6Mo

9:05 Client2 plant'e => redemarrage

9:45 HV On

Scan charge phase. Max charge=255

Phase E_max 207

Q~ 130pC

Fermeture Iris laser jusqu'a 1mm

Q~100pC

Phase section dispersion min: 103.

TL/BPM.02:

X=1.08

Y=0.7

RMS position: 0.2mm

10:26 Beam in the ring

Optimization of the injection and storage (see fig attached). At the end, injection with no losees!

Preparation for the orbit correction eluminating not working correctors. After several studies and iterations, we suceeded to correct the orbit (see the fig attached). Meanwhile, it seems that the BPM  ri-c2/dg/bpm.04-lib.05 (quite certain as it did not respond to the corrector change) and probably  ri-c1/dg/bpm.04-lib.03 do not give the proper readings. This point should be checked as soon as possible.

Problem with ChD of the ri-c2/dg/bpm.04-lib.05 (see the fig attached). We checked the connection in the rack5. We found that the BPM ri-c2/dg/bpm.04-lib.05 ChA was swaped with ChA BPM ri-c2/dg/bpm.06-lib.05 => Slava changed it. Now it is OK. BUT still ChD stays without signal. The problem is in the casemat probably. To be checked.

Starting the preparation for the first tune estimation. For this, we switched ON the sextupoles (see fig attached). Withour sextupoles, the FFT signal is too "noisy".

Optimization of the injection with the multiparameter optimizer RCDS, work in progress.

Alims IHM is updated by Slava to have separetly hor. and vert. correctors displayed.

18h30 End of the Shift.

 

 

 

 

 

 

 

Attachment 1: scan_charge_phase_0_360.png
scan_charge_phase_0_360.png
Attachment 2: scan_charge_phase_min_240.0_max_280.0_10_7_12.png
scan_charge_phase_min_240.0_max_280.0_10_7_12.png
Attachment 3: Screenshot_from_2022-10-14_17-01-27.png
Screenshot_from_2022-10-14_17-01-27.png
Attachment 4: FFT_TbT_tune.png
FFT_TbT_tune.png
Attachment 5: closed_orbit2_14102022.png
closed_orbit2_14102022.png
Attachment 6: Screenshot_from_2022-10-14_10-37-11.png
Screenshot_from_2022-10-14_10-37-11.png
Attachment 7: Screenshot_from_2022-10-14_17-30-30.png
Screenshot_from_2022-10-14_17-30-30.png
Attachment 8: Screenshot_from_2022-10-14_17-32-26.png
Screenshot_from_2022-10-14_17-32-26.png
Attachment 9: Screenshot_from_2022-10-14_17-46-56.png
Screenshot_from_2022-10-14_17-46-56.png
Attachment 10: Screenshot_from_2022-10-14_18-00-58.png
Screenshot_from_2022-10-14_18-00-58.png
  589   Thu Oct 13 17:41:13 2022 Entered by Marie Jacquet from 134.158.89.45 on Thu Oct 13 17:41:00 2022 Shift summaryLinac Commissionning Alignement LINAC (canon-LIL-QUADs) 

Ci-joint le bilan, au jour d'aujourd'hui, des reconstructions Horizontales et Verticales des axes MAG Canon, LIL et QUADs a l'aide de diverses prises de donnees.

Marie

Attachment 1: 2022-10-13-elog.pdf
  588   Thu Oct 13 10:26:06 2022 ND, VC, KD, VKUnder ProcessShift summaryDiag | Ring Commissioning Operations du 13/10/2022 

Les limites en courant ont été implémentées  dans les DS alimentation pour toutes la machine comformément au fichier "https://atrium.in2p3.fr/c40d9e45-476b-4e9a-9a0b-e05bb635888a"

 

9h15: Le frigo, le chiller et les elements pulses etaient encore allumes depuis hier soir.

Demarrage modulateur

Acces CFP. Clef acces laser oublies dans la casemate =>  acces complet.

Installation du MRSV (mise en hors service temporaire de EL/DG/SST).

11h Ronde fermeture casemate

11h05 Pb modulateur. Tentative appel support

Absence permis zone modulateur...

11:25 La ronde de la zone modulateur n'avait pas ete faite.

11:30 Trig

11h35 Pb Vide...

11:45 Pas de laser sur la camera laser photocathode mais photocourant en scan charge phase a 200-250.

Camera laser photocathode defaillante

Charge max 200pc (iris laser 2.3mm), phase 254.

Ajustement iris laser 1mm => Charge moyenne 100pC

Pas de recette de cette semaine?

Chargement recette: recipe_recipe_LI_TL_RI_20221007_20_09_40.txt

Extinction TL/PS/DP

Observation faisceau sur TL/DG/SST01: Pas de saturation; Pixel max a 600.AcqAttrManager ne demarre pas. CC contacte.

Observation ADC BPM TL/BPM.01: Pas de saturation

12h30 Pb demarrage septum

13h IHM EP added to Plateforme IHM

13h05 Pb septum resolu

13h25 Transport jusqu'a TL/SST3

Sur TL/SST2 le faisceau est a -2mm en X...

14h Acces pour reparation TL/SST.02 (ne fonctionnait pas sur routeur avec RI-C2/MRSV)

14h30 Iris mis a 1.3mm

14h40 Pb jive (cf image attachee)

15h Scan image saturee

16h Test AcqAttrManager: cela fonctionne mais des erreurs a analyser. L'acquisition tombe a 1Hz avec 2 BPM et deux ICTs.

17h Injection dans l'anneau. Recette sauvee: recipe_recipe_LI_TL_RI_20221013_16_51_32.txt

Valeurs de positions:

TL/DG/BPM.03_LIB.02: SpX=-1.95 SpY=-0.09

TL/DG/BPM.04_LIB.02: SpX=-1.36 SpY=1.00

Image TL/DG/SST.03 sauvee

17h15 Arret machine

git pull

===

Here is the program:

- Start modulator with automated script: Not done

- Access CFP until 10:00: OK

=> Disconnect TL/EL/SST.01 and connect MRSV: OK

- Test AcqAttrManager => Attente CC

- Emittance measurement on TL/SST.03 + Viktor

- Re-establish transport to the ring. Done

- Record TL/SST.03 + TL/BPM.03 and TL/BPM.04 for good ring injection.


- Adjust timing on TL/SST.02

Attachment 1: Screenshot_from_2022-10-13_14-44-35.png
Screenshot_from_2022-10-13_14-44-35.png
Attachment 2: scan_charge_phase.png
scan_charge_phase.png
Attachment 3: 2022-10-13_17_16_21_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
2022-10-13_17_16_21_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_150.png
Attachment 4: camera_delay_scan_full.png
camera_delay_scan_full.png
Attachment 5: camera_delay_scan.png
camera_delay_scan.png
  587   Thu Oct 13 00:49:19 2022 NDFixedShift summaryLI | Diag | MECA | Linac Commissionning RE: Shift du 12/10/2022 (prise de données) 

Sur l'image jointe le pixel maximum est à ~750 donc on est loin de la saturation...

KD, MJ, RC wrote:

Mise en chauffe Modulateur vers 9h

9h - 10h : installation Laser 33MHz de la CFP par Ronic

Vers 10h Ronic informe qu'un des câble d'alimentation du boîtiers interlock du 1e dipôle de la CFP a été arraché par maladresse. Le fil a été re-soudé et attaché au bundle de câble.

Impossible de passer en TRIG ==> le PA est disjoncté ==> le MPS bloque le PA parce que les dipôles anneau sont en erreur. Après acquitement tout est OK

Faisceau à 11h.

Marie à refait les mesures d'alignement Quad.

Prise de donnée pour alignement automatique du laser sur la PhotoCathode

Prise de donnée pour alignement automatique dans les Quad (pseudo correction d'orbite)

==> les BPM saturent, les caméras sature losrque le faisceau est focalisé.

==> Les données sont peut être à jeter.

Arrêt machine 17h15

*** OBSERVATIONS ***

Lors des tests, nous avons trouvé un nouveau point d'alignement laser sur la photoCathode (5.0xx, 3.22). Les caractérisitques de ce point par rapport au point habituel :

- en dehors de la zone du courant d'obscurité. A la position du repique dans le scan phase-charge

- Insensible à la variation de phase à charge max

- Charge plus important (200pC au lieu de 150pC)

- Le faisceau est plus déformé  (cf. image en PJ)

 

  586   Wed Oct 12 20:11:14 2022 KD, MJ, RCFixedShift summaryLI | Diag | MECA | Linac Commissionning Shift du 12/10/2022 (prise de données) 

Mise en chauffe Modulateur vers 9h

9h - 10h : installation Laser 33MHz de la CFP par Ronic

Vers 10h Ronic informe qu'un des câble d'alimentation du boîtiers interlock du 1e dipôle de la CFP a été arraché par maladresse. Le fil a été re-soudé et attaché au bundle de câble.

Impossible de passer en TRIG ==> le PA est disjoncté ==> le MPS bloque le PA parce que les dipôles anneau sont en erreur. Après acquitement tout est OK

Faisceau à 11h.

Marie à refait les mesures d'alignement Quad.

Prise de donnée pour alignement automatique du laser sur la PhotoCathode

Prise de donnée pour alignement automatique dans les Quad (pseudo correction d'orbite)

==> les BPM saturent, les caméras sature losrque le faisceau est focalisé.

==> Les données sont peut être à jeter.

Arrêt machine 17h15

*** OBSERVATIONS ***

Lors des tests, nous avons trouvé un nouveau point d'alignement laser sur la photoCathode (5.0xx, 3.22). Les caractérisitques de ce point par rapport au point habituel :

- en dehors de la zone du courant d'obscurité. A la position du repique dans le scan phase-charge

- Insensible à la variation de phase à charge max

- Charge plus important (200pC au lieu de 150pC)

- Le faisceau est plus déformé  (cf. image en PJ)

Attachment 1: 2022-10-12_15_38_25_li_dg_sst_01-ccd_01_RAW_16bits.tiff
  585   Tue Oct 11 11:57:19 2022 HG/CB InfoLI | TL | LE | Linac Commissionning run du 11/10/2022 

Iris de 2mm, prise d'image @12h --> dimension H 0.37mm et V 0.34mm

iris 1mm, prise d'image @12h14 --> dimension 0.28mm, 0.25mm

Iris 1.5mm, prise d'image @12h19 --> dimension 0.34mm, 0.3mm

Iris 1.3mm, prise d'image @ 12h22, 0.31mm, 0.29 mm, charge phase at 12h25, attenuation de 400 (Qmax290, Emax250pC)

Réalignement laser : position 5.856mm en x, et 3.41 en v

Compresseur à 60000 --> durée ?

Attenuation : 300--> 60 pC; 330 --> 140pC

focmax 247deg --> 197 deg, soleo at 198A

** REMARQUES **

    ---- Il semblerait que le BPM TL/DG/BPM.01 sature (cf. figure) les waveformes semblent écrétées. 

 

 

 

 

Attachment 1: BPM_saturation_2022-10-11_15-07-37.png
BPM_saturation_2022-10-11_15-07-37.png
  584   Tue Oct 11 11:09:21 2022 Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 11 11:09:03 2022Not FixedProblemLinac Commissionning Valeurs des BPM LI et TL_1 surestimees ? 

Ci-jointes des donnees BPM et YAG LI et TL_1, prise le 20/06 puis le 06/10, en fonction de valeurs des steerers 1 (pour LI) et 3 (pour TL)

--> Les valeurs mesurees au BPM ont l'air surestimees d'environ 30%.

Attachment 1: 2022-10-11-BPM-YAG-STR.pdf
  583   Mon Oct 10 17:20:11 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 17:19:55 2022FixedInfoLinac Commissionning Laser status 

Bonjour, un téléscope (F1=150mm, F2=-75mm, réduction=2) a été installé sur la table optique dans la casemate (la monture du téléscope est très instable !!!)

l'énergie actuellle sur la cathode:

Iris 1mm - 57µJ

      2mm - 96µJ

     3mm - 120µJ

Viktor.

  582   Mon Oct 10 15:10:36 2022 Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 15:10:21 2022FixedInfoLinac Commissionning Laser status 

Bonjour, l'énergie UV actuelle sur la cathode:

Iris 3mm - 92µJ

     2mm - 62µJ

     1mm - 23µJ

Viktor.

  581   Mon Oct 10 14:44:44 2022 KD, VS, SCFixedShift summaryLI | Laser shift du 10 octobre 2022 

Viktor est intervenu ce matin pour réaligner le laser sur un autre point du chemin optique (éviter la partie endommagée des miroirs). 

Nouvelles mesures d'énergie :

Iris 3mm - 92µJ

     2mm - 62µJ

     1mm - 23µJ

14h46 Démarrage du modulateur 

--> mesure scan-charge phase à 1mm d'iris : ~ 69pC charge max.

==> nécessité de mettre en place un telescope pour augmenter la charge. 

* Prise de mesure pour alignement photoCathode.

Mise en place du téléscope /2. 

iris 3 mm : 120uJ

      2 mm : 97 uJ

      1 mm : 57uJ

Tout semble Ok. Mesure de la charge à 1mm et ajustement avec l'atténuateur. 

Le PA a disjoncté ==> Maher doit intervenir dans le modulateur. Mesure de charge à faire demain. 

 