586
|
Wed Oct 12 20:11:14 2022 |
KD, MJ, RC | Fixed | Shift summary | LI | Diag | MECA | Linac Commissionning |
|
Shift du 12/10/2022 (prise de données) | | Mise en chauffe Modulateur vers 9h
9h - 10h : installation Laser 33MHz
de la CFP par Ronic |
|
|
585
|
Tue Oct 11 11:57:19 2022 |
HG/CB | | Info | LI | TL | LE | Linac Commissionning |
|
run du 11/10/2022 | | Iris de 2mm, prise d'image @12h -->
dimension H 0.37mm et V 0.34mm
iris 1mm, prise d'image @12h14 |
|
|
584
|
Tue Oct 11 11:09:21 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 11 11:09:03 2022 | Not Fixed | Problem | Linac Commissionning |
|
Valeurs des BPM LI et TL_1 surestimees ? | | Ci-jointes des donnees BPM et YAG LI et
TL_1, prise le 20/06 puis le 06/10, en fonction
de valeurs des steerers 1 (pour LI) et 3 |
|
|
583
|
Mon Oct 10 17:20:11 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 17:19:55 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | | Bonjour, un téléscope (F1=150mm,
F2=-75mm, réduction=2) a été
installé sur la table optique dans |
|
|
582
|
Mon Oct 10 15:10:36 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Oct 10 15:10:21 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | | Bonjour, l'énergie UV actuelle
sur la cathode:
Iris 3mm - 92µJ |
|
|
581
|
Mon Oct 10 14:44:44 2022 |
KD, VS, SC | Fixed | Shift summary | LI | Laser |
|
shift du 10 octobre 2022 | | Viktor est intervenu ce matin pour réaligner
le laser sur un autre point du chemin optique
(éviter la partie endommagée |
|
|
580
|
Fri Oct 7 11:57:24 2022 |
IC, VM, VK, AL, JH | Under Process | Shift summary | Ring Commissioning |
|
Optimization of the ring | | Start of the modulator at 9h45
11h30 Problem with water regulation.
Probably falseread of GUN PT100. Hayg and |
6x |
|
579
|
Fri Oct 7 00:30:24 2022 |
Entered by Marie Jacquet from 88.165.97.136 on Fri Oct 7 00:30:03 2022 | | Shift summary | Linac Commissionning |
|
shifts LINAC 4/10 et 6/10 | | 4/10 : Prise de donnees "Alignement
LINAC" (Hayg Marie)
Iris |
|
|
578
|
Thu Oct 6 10:18:03 2022 |
VK/ND/SC | | Anneau | Ring Commissioning |
|
Faisceau Anneau | | Modulateur Impossible à passer en
Standby ==> problème manque d'eau.
|
10x |
|
Draft
|
Wed Oct 5 19:02:28 2022 |
VK, VM, HG,IC, AL | | | |
|
| | Shift started with machine receipy from
Monday .
Scan parameters, injection to find |
|
|
Draft
|
Tue Oct 4 17:34:09 2022 |
Entered by Nicolas Delerue from 134.158.88.175 on Tue Oct 4 17:33:52 2022 | | Shift summary | |
|
Planning shift Thursday 6th October | | - Study beam position on SST and BPM vs
iris size / TL/BPM.01
- Start AcQAttrManager |
|
|
Draft
|
Tue Oct 4 15:47:22 2022 |
MJ/HG/SC | | Linac | Linac Commissionning |
|
Alignement linac | | Modulateur HV=1090V enregistrement des
Pic
Faisceau linac en cours |
|
|
574
|
Mon Oct 3 20:31:09 2022 |
VK, AL, IC | Reference Solution | Shift summary | Ring Commissioning |
|
Beam is stored | | Shift started at 18h
With the current injector settings,
it was difficult to inject. We loaded |
6x |
|
Draft
|
Mon Oct 3 14:08:06 2022 |
VC/KD/SC | New Solution | Linac | Linac Commissionning |
|
Faisceau linac | | 13h : MO : Mise en chauffe modulateur et
mise en route refroidissement
14h : Fermeture casemate, démarrage |
|
|
572
|
Mon Oct 3 12:51:26 2022 |
Slava, Viktor M, Iryna | Fixed | Problem | Ring Commissioning |
|
Check the QUADs in the ring | | On last Friday, we found that there is
a potential problem with QUAD 9, 10
an 12 as by switching them OFF, we obtained |
|
|
571
|
Fri Sep 30 08:30:38 2022 |
AM, VI, VK, IC, VC, ND | New Solution | Shift summary | Ring Commissioning |
|
Shift du 30/09/2022 | | AM :
Hier soir : extinction des PC clients1
et clients 2 |
16x |
|
570
|
Thu Sep 29 07:59:51 2022 |
AM, IC, VK, VI, SC, ND | | Shift summary | LI | TL | Ring | Diag |
|
Shift du 29/09/2022 | | AM :
git pull sur $HOME_IHM
pression vanne vide : 5.7 |
9x |
|
569
|
Wed Sep 28 19:14:11 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 28 19:13:52 2022 | | Shift summary | Linac Commissionning |
|
Shift du 12-13/09 en image | | En pj, les donnees "Alignement LINAC"
du 12-13/09, en image (donnees brutes notees
dans le elog le 16/09). |
|
|
568
|
Wed Sep 28 08:31:27 2022 |
VC VK AM IC & all | Under Process | Shift summary | Ring Commissioning |
|
Shift du 28/09/2022 |
| AM :
git pull sur $HOME_IHM
pression vanne vide : 8 |
  |
|
567
|
Tue Sep 27 08:40:33 2022 |
VC SC CB | Under Process | Shift summary | LI | Linac Commissionning |
|
Shift du jour | | Summary:
- Mesure du jitter et de la position
relative de pulse laser PC avec la RF canon |
|