613
|
Thu Oct 27 09:13:49 2022 |
MO/SC/MJ | | Linac | Linac Commissionning |
|
mesure energie impossible (licence) | |
MO : Mise en route modulateur et refroidissement
Pas possible de mesurer l energie avec le scipt habituel . Message suivant :
License checkout failed.
License Manager Error -4
Maximum number of users for Image_Toolbox reached.
Try again later.
Troubleshoot this issue by visiting:
https://www.mathworks.com/support/lme/R2018b/4
Diagnostic Information:
Feature: Image_Toolbox
License path:
/data/operateur.thomx/.matlab/R2018b_licenses:/home/debian/R2018B/licenses/license.dat:/home/debian/R2018B/licenses/network.lic
Licensing error: -4,132.
Error in Steerer_Screen_thomx (line 70)
imageArray=mat2gray(imageArray);
|
|
Draft
|
Thu Oct 27 11:12:33 2022 |
Entered by Nicolas Delerue from 80.119.21.73 on Thu Oct 27 11:12:17 2022 | Under Process | Shift summary | |
|
Programme prise de donnée 28/10 | |
===
Program for the shift on 28/10
0) Git pull
1) Start beam
2) Measure respone of TL/SST.2 as function of time
3) Try to put TL/SST2 on negative polarity
4) Study BPM attenuation
|
|
615
|
Thu Oct 27 12:07:17 2022 |
MJ SC | | Shift summary | Linac Commissionning |
|
| |
Energie 53.4 MeV
Q1 a Q5 = 0 ; Idiopole 156.3 ; STR2V -10 --> Q6 et Q7 correctement alignes (en faisant varier les courant dans Q6 et Q7 : au YAG on a delta_x ~ 1mm ; delta_y ~ 0 )
|
|
616
|
Thu Oct 27 17:19:28 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Oct 27 17:19:13 2022 | | Shift summary | Linac Commissionning |
|
Alignement dans les quads Q1 a Q7 + prise de mesures dans les diag en meme temps | |
Preambule : Le dipole a retrouve aujourd'hui sa valeur ~ 155 (cette valeur de 144 d'hier est incomprehensible ...)
Alignement dans les quads Q1 a Q7 + prise de mesures dans les diag en meme temps --> Le bilan est dans la pj. |
|
617
|
Fri Oct 28 09:19:22 2022 |
SC/ND | | Anneau | Linac Commissionning |
|
Démarrage faisceau et TP | |
9h19 : Mise en route modulateur et refroidissements
10h45: Start the Modulator
11h30 : Scan charge
Max chage : 238°
Max energy : 188°
12h : load recipe : recipe_recipe_LI_TL_RI_20221021_16_15_04.txt
Dipole TL switch off -> Beam on TL/DG/SST.01
12h30 : Dipole TL switch on
Beam on TL/DG/SST.02
Beam energy and enegy spread improved by increase phase to 204 (cf image) (dipoles at 156A)
12h45 : Injection dans l'anneau
calcul convetion A -> rad for kicker
13h50:
Test on TL/DG/SST.02
===
Program for the shift on 28/10
1) Start beam
2a) Measure respone of TL/SST.2 as function of time
2b) Try to put TL/SST2 on negative polarity
3) Study BPM attenuation
4) Test Alexandre's feedback
5) Cerenkov |
|
618
|
Fri Oct 28 18:16:43 2022 |
MJ JNC | Not Fixed | Shift summary | Linac Commissionning |
|
phase en delire | |
Qund on lance l'ihm charge phase, le plot charge phase arrive puis une routine cointinue par pas de 1 degres, je crois, puis lla phase part en delire, elle change tout le te,ps sans qu on ne fasse rien. J'ai constate cq plusieurs fois |
|
619
|
Fri Oct 28 18:31:14 2022 |
MJ KNC | Not Fixed | Shift summary | Linac Commissionning |
|
ecrans yag 1 et 2 desinchro | |
yag1 et yag2 sont completement desynchro.de la machine il faut augmenter image counter a environ 0.5 pour voir qq chose
Nicolas ????? |
|
620
|
Mon Oct 31 23:09:07 2022 |
ND | Fixed | Shift summary | Diag | Linac Commissionning |
|
RE: ecrans yag 1 et 2 desinchro | |
Je viens de regarder LI/SST.01 et TL/SST.01 étaient en attenuation maximale. Si le problème se reproduit, il faut cliquer sur "Full intensity" sur l'IHM SST.
|
.MJ KNC wrote:
|
|
yag1 et yag2 sont completement desynchro.de la machine il faut augmenter image counter a environ 0.5 pour voir qq chose
Nicolas ?????
|
|
|
621
|
Mon Oct 31 23:11:47 2022 |
ND | Fixed | Shift summary | Linac Commissionning |
|
RE: phase en delire | |
Après un premier scan sur 0-360 degres le script lance un second scan sur la zone la plus probable de maximum de charge pour trouver plus précisement le meximum de charge. Il met ensuite la phase au maximum de charge - 50 degres ce qui correspond à peu prêt au maximum d'énergie.
| MJ JNC wrote: |
|
Qund on lance l'ihm charge phase, le plot charge phase arrive puis une routine cointinue par pas de 1 degres, je crois, puis lla phase part en delire, elle change tout le te,ps sans qu on ne fasse rien. J'ai constate cq plusieurs fois
|
|
|
622
|
Thu Nov 3 09:18:49 2022 |
ND, IC, VK, VM | New Solution | Shift summary | Ring |
|
Shift àf 3/11/2022 | |
9:10 Air pressure: 8 bars, water resistivity 6,33Mohm
9:15 Modulator warm-up
9:20 Ronde zone modulateur
9:25 Ronde casemate
9:38 Health check: Pb vide et Alimentation
RI-CI/PS/STR.05-H.01 state=Alarm => Overvoltage => acquittee => OK
Deuc vannes vide fermee autour de la cavite RF => Ouverte
9:47 Croise par hasard deux personnes de Dalkia en intervention ...
10:02: Cyclage des aimants (tous dans IHM cycling) => certains aimants vont au dela de la limite de courant lors du cyclage => Cyclage a revoir...
10:20 Modulator interlock (bit 0 and 1)
10:40 OK (interface moduateur plantee?)
10:48 Trig => interlock
Trig@1000V
Pb vide
Trig@1090V
11:10 Scan charge phase
11:14 Chargement recette recipe_recipe_LI_TL_RI_20221021_16_15_04.txt
11:25 Beam found on TL/SST.02 with TL/DP.01=151.7 A
Min dispersion at Phase RF= 111
Changement de recette recipe_recipe_LI_TL_RI_20221020_15_31_20.txt
11:35 On TL/SST.03 the beam looks like Casper!
11:39 Beam in the ring
12:27 Ouverture Iris => 2mm, attenuateur => 330mm
Q=100pC
12h only few turns in the ring. Searching for the problem. Use recipie from Friday 21 October. Does not Help.
Found that QP 12 was OFF => turned ON. Optimized beam. Ri-C2 steerers were OFF.
Ring_saving function for saving orbit params in matlab.
Ring dipole 157-156 - better orbit, less of beta excitations.
Work with correctors. HCOR=> all 0, orbit exist. Restart orbit correction with SVD to find the new settings. Need to compare how different to the previous corrector values.
Same in vertical.
RCDS for injection optimisation.
TBT data not stable.
Quads and Sext +-5%
|
|
623
|
Fri Nov 4 11:56:48 2022 |
Entered by Marie Jacquet from 134.158.205.43 on Fri Nov 4 11:56:17 2022 | Not Fixed | Shift summary | Linac Commissionning |
|
Mesures BPM et YAG vs Steerers - 17/10, 24/10 et 26/10 | |
Ci-joint le bilan BPM et YAG vs steerer de 3 jours differents : le 17 le 24 et le 26 octobre
En abscisse : c'est le deplacement attendu calcule a l'aide de l'intensite du steerer (strLI ou strTL1, vertical et/ou horizontal), des caracteristiques du steerer, des coordonnees Z des elements,
En ordonnee : c'est le deplacement mesure aux BPM (LI ou TL) ou aux YAG (LI ou TL)
1) Les BPM restent sous-estimes
2) Comme dit dans un echange mail recent, il faudrait cycler les steerers et refaire ces mesures si on veut de la precision
|
|
624
|
Fri Nov 4 18:28:58 2022 |
VK, VM, IC, KD | | Shift summary | Ring Commissioning |
|
Ring commissioning | |
Start of the machine by KD
11h20 The beam is in the ring
Optimization of the injection with the RCDS
Off-momentum injection from the injector
Based on the observation (attached here), it seems that there is a resonant excitation of the beam by the RF cavity. Difficult to scan with the dipole field.
=> The RF cavity should be checked and during the runs detuned.
=> Probably the priority to the RF cavity conditioning should be given to progress on the Ring comissioning
The BPM.04-LIB.03 (just before the FPC) gives a strange vertical orbit. This should be checked and further invetigated.
Test of the script to swotch off the machine by KD.
18h45 End of the shift
|
|
625
|
Mon Nov 7 11:02:19 2022 |
ND | Under Process | Shift summary | Diag | Ring Commissioning |
|
Operations du 7/11/2022 | |
10:50 Fin intervention CFP
Intervention laser photocathode toujours en cours et prioritaire mais preparation casemate.
11:10 Pb vide dans health check resolu.
11h30 intervention laser terminée!
11:40 Ronde fosse Nord + Fosse Sud + Casemate
12:00 Test cyclage aimants
Analyse erreur cylage sur RI-C2/PS/QP.02 and RI-C1/PS/QP.06
Si l'on passe de 8A a 10A il y a une erreur overvoltage.
Sur RI-C2/PS/QP.02 passer de 8A a 9.3A est suffisant pour causer l 'erreur
Sur RI-C1/PS/QP.06 passer de 8A a 9.6A est suffisant pour causer l 'erreur.
12:46 Modulateur en standby
13:55 Beam ON
Modulateur status bit =8 => vacuum problem
14:10 Scan charge phase, MaxE=106
14:18 Chargement recette recipe_recipe_LI_TL_RI_all_20221104_18_20_56.txt
15:30 Minimum dispersion at 113
17:40 arret faisceau
|
|
626
|
Wed Nov 16 16:33:33 2022 |
Entered by Viktor Soskov from 134.158.195.153 on Wed Nov 16 16:33:14 2022 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Bonjour, le phototube UV est installé à la place du PD.
Viktor. |
|
627
|
Thu Nov 24 09:43:12 2022 |
Entered by Maher OMEICH from 134.158.91.212 on Thu Nov 24 09:42:54 2022 | | Fix | RF D1 |
|
pour info | |
Démarrage de chauffage klystron après mesure du filament kly. suite à la coupure d'hier ( par eau ): le modulateur etait en fonctionnement ( en TRIG ) pour tester le klystron remplacer la semaine dernière, ces tests ont commencé lundi dernier, mardi et mercredi ( jusqu'à la coupure d'eau )
Maher |
|
628
|
Thu Nov 24 10:14:45 2022 |
Entered by Maher OMEICH from 134.158.91.212 on Thu Nov 24 10:14:31 2022 | | Problem | RF D1 |
|
| |
J'ai un problème sur le frigo des chillers section et canon qui ne refroidie pas, je contacte la socièté Réglochill
Maher |
|
629
|
Fri Nov 25 15:31:56 2022 |
Entered by Maher OMEICH from 134.158.91.212 on Fri Nov 25 09:58:16 2022 | | Shift summary | RF D1 |
|
| |
Vendredi 25/11
Conditionnement Klystron: le conditionnement du klystron avec RF progresse lentement au delà du point de fonctionnement ( 24 MW ) jusqu'à équivalant de 30 MW ( courbe klystron ) mais ce n'est pas stable ça tomble par le réfléchi. Pour les mesures radio pro: le klystron a fonctionné en mode diode ( c'est à dire sans RF à l'entrée du klystron ) à sa puissance maximale ( courant et tension ) les mesures du rayonnement autour du klystron sont faites.
Pour le frigo: J'ai contacté la personne ( frigoriste ) pour convenir d'un rdv, çà sera lundi 28/11, il va me confirmer par sms l'heure de son arrivée.
Maher
|
|
630
|
Mon Nov 28 08:54:20 2022 |
KD, VC | Under Process | Shift summary | LI |
|
shift du 28 Novembre 2022 | |
8h45 -9h : - Démarrage frigo (pression entrée Frigo max ~ 5.5 bar). Le Frigo semble tenir et jouer son role.
- Démarrage Modulateur (mise en chauffe)
- Démarrage Laser
* Le PSS est HS, il faut le redémarrer
9h15 : Arret Machine ==> intervention sur le pont de l'IGLOO. Reprise cette après midi si tout se passe bien. (SPR et autre nous ont pas prévenu).
10H30 : redpitaya en baie 17... (testées vendredi 25 )
redpitaya 2 connection impossible serveur éteind et starter serveur sous astor ne fonctionne pas => Philippe G contacté par mail
redpitaya 1 3 4 les parametres (ATK pannel) Triger source=6 et trigger level=1) était à leurs valeurs par défaut ....
Vérification de la lecture du phototube sur la voie B de la Redpitaya 4 => OK (attention la forme du signal à changé)
13h30 : Mise en chauffe modulateur. Le Frigo était en alarme "Haute température".
**** Problème ****
- L'IHM sst bug : faisceau sature et les boutons d'intensité ne semble pas agir. Bug d'affichage également sous les boutons gain et exposure time. Sinon l'interface est plutot agreable à utiliser
|
|
631
|
Mon Nov 28 14:25:46 2022 |
Entered by Marie Jacquet from 134.158.89.45 on Mon Nov 28 14:25:31 2022 | | Shift summary | Linac Commissionning |
|
Lmag STR 3 (steerer après la LIL) | |
Nouvelle détermination de Lmag du Steerer 3
Lmag STR3 = 67.6 mm (cf. pj)
Avec ça, la mesure de l'énergie post LIL devrait être de ~50 MeV au lieu des ~52 qu'on trouvait habituellement. |
|
632
|
Mon Nov 28 18:11:56 2022 |
CB/HG/JNC | | Shift summary | Linac Commissionning |
|
run du 28 novembre 2022 | |
Redémarrage faisceau avec le nouveau klystron
charge phase enregistrée @ 16h13
réglage modulateur 1070 (0dB), mesure énergie canon à 3.9 MeV (col 2 180 degrés), phase 180
iris à 1.3mm, charge max à 200 degrés,
mesure energie à 160 degrés : coil 2 à 212 --> 4.6 MeV (même énergie que le 6 juillet)
mesure energie à 150 degrés : coil 2 à 220A --> 4.76MeV
image du faisceau focalisé à la sortie du canon

Phase section à 100 degrés, atténuateur à 1.5dB --> energie (LI/str1h=-1.6A, li/str2V=0.4A)
attenuation section .4dB, dipole à 159.3A, phase section 101 degrés
image du faisceau sur TL/SST3

Saut modulateur @ 19h40
focalisation avec QP1 et QP sur TL/SST2 , image saturée, on baisse la charge pour pouvoir mesurer les dimensions sans saturation (att à 270)
QP1= 2.2A, QP2=-2.8A
v2 QP1=2.5A, QP2=-3.3A
|