Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 30 09:48:28 2026;  

Maher started the modulator

9h50 HV is on

09h53 Beam is in the ring w/o RF

10h30 Beam is in the ring with RF

The network is extremly slow on client 1. Impossible to start terminal or execute the commands. Client 2 is slow but still works. 

11h15 Beam is in the ring with RF at good frequency. Rigol is working properly. Thanls to Nicolas.

recipe_recipe_LI_TL_RI_all_20250321_12_30_52.txt loaded, Injection was adjusted. Ring dipole current set to 159.3 A (it was 160.4 A).  Beam has two pics at the extraction. Vertical orbit -2 to 2 mm around AP. After orbit correction just one pic.

13h57 Energy = 50 MeV, Laser Phase 101 dg., Sect. Phase 223 dg., Sect. Att. 2.49 dB, I_Gun -111.7927 pC, I_Linac -145.368 pC, I_TL -115.7221 pC RF_Ampl. 148.6391 kV, RF_Phase -38 dg.

Different ring settings were tested for lifetime.

18h24 ThomX was stopped

 