729
|
Thu Apr 6 12:57:29 2023 |
Entered by Super Team from 134.158.195.141 on Thu Apr 6 12:57:15 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
12h57 Mise en chauffe modulateur et refroiddissement canon et section
Vide dans l'anneau de l'ordre de 10-8
Mise en route faisceau
Phase charge max = 66, charge = 103 pC, iris 1.3mm, HT = 1090V, attenuation laser = 330, Attenuation canon = 0 dB, attenuation section = 1.5 dB
17h34 Arret faisceau
|
|
Draft
|
Tue Apr 4 15:21:51 2023 |
| | | |
|
, entered from 134.158.195.141 | |
<p>12h10: Mise en chauffe modulateur, laser et chiller + PA</p>
<p>14h30: mesure phase relative sortie pilote/ sortie PA Vrms pilote, Vrms PA <strong>Sans HT dans le Klystron</strong></p>
<p>s'il vous plait, Indiquez l'heure du passage sous haute tension (pour voir si cela change quelque chose à aux mesures RF) MERCI</p>
<p>15h03 modulateur trig</p>
<p>Wave catchers arretes soft - Vincent les a redemarre (c'est la 2eme fois) Est-vr</p>
<p> </p>
<p> </p> |
|
727
|
Tue Apr 4 12:13:18 2023 |
MJ KD | Under Process | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 04 avril 2023 | |
12h10: Mise en chauffe modulateur, laser et chiller + PA
14h30: mesure phase relative sortie pilote/ sortie PA Vrms pilote, Vrms PA Sans HT dans le Klystron
s'il vous plait, Indiquez l'heure du passage sous haute tension (pour voir si cela change quelque chose à aux mesures RF) MERCI
15h03 modulateur trig
Wave catchers arretes soft - Vincent les a redemarre (c'etait pareil la semaine derniere, Y-a-t-il qqun qui les arretent ?
|
|
726
|
Fri Mar 31 10:44:31 2023 |
Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
Qui me pique internet ?
Et m'éfface le elog ? |
|
725
|
Fri Mar 31 10:11:40 2023 |
Entered by Super Team from 134.158.195.141 on Fri Mar 31 10:11:25 2023 | | Linac | Linac Commissionning |
|
Faisceau Linac | |
10h12 Démarrage modulateur et refroidissement
Lancement de l'archivage
11h05 Fermeture casemate
Config linac sur le MPS, pas possible la config LI-TL-LE manque le volume vide V6 du MPS pour cette configuration
11h17 Fermeture casemate et Démarrage faisceau
Scan charge phase phase charge max donnée par script = 219 degres, charge max = 112 pC
Position laser PosX = 4.910 et PosY = 2.400 sur feedback position
Modulateur HV = 1090V, attenuation canon = 0.0 dB et attenuation section = 1.50 dB
Le faisceau est plutot instable en intensité, il disparait et ré-apparait
Max de foc à phi = 223 degres, zone de faisceau visible entre 217 et 223 degres
Mesure phase - énergie canon avec soleno foc en cours.
13h00 Arret du faisceau - pause repas
14h20 Reprise
Mesure phase energie section
17h Arret machine |
|
724
|
Thu Mar 30 17:20:43 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 17:20:29 2023 | | Shift summary | Linac Commissionning |
|
| |
Shift ce matin
** YagTL1 vs soleno avec alignement a la Kev ou a la Hayg (mais chaque fois aligne dans Q1-Q3). --> trajet dans la LIL differents - Mesures avec soustraction courant obscurite (df la pj)
** pour Sol=180A, taille sur YAG 1 pour plusieurs str1 ---> taille horix sur YAGTL1 varie de 0.2 a 0.8 (cf la pj)
Meme si le passage dans la LIL avec des desalignement differents a un effet, ca n'explique toujours pas le desaccord data/simul ASTRA ...
Fin de shift vers 13h |
| Attachment 1: 2023-03-30-YAGTL1_vs_Soleno.png
|
 |
|
723
|
Thu Mar 30 13:35:13 2023 |
Entered by SC from 134.158.195.141 on Thu Mar 30 13:34:57 2023 | Under Process | Linac | Linac Commissionning |
|
Faisceau Linac | |
14h38 : Démarrage faisceau linac
Modulateur 1090V, Position laser horizontale 4.910 mm et verticale 2.40 mm
Iris 1.3 mm
Attenuation laser = 344
Attenuation canon RF = 0.0 dB et Attenuation section = 1.50 dB
temperature consigne canon = 31.50° et temperature consigne section = 29°
Sans solénoide, Phase de charge max = 204 donnée par le scan charge phase du DS, on ne voit pas le faisceau à cette phase, en focalisant le faisceau pour le voir sur l'écran on est dans une gamme de phase allant de 209 à 216
Charge 124 pC
Arret faisceau
Détection de fuite pour le vide en cours
|
|
722
|
Thu Mar 30 09:34:24 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Mar 30 09:34:11 2023 | | Shift summary | Linac Commissionning |
|
Nouvelle position laser/cathode (du 29 mars) | |
Nouvelle position laser/cathode du 29 mars : x=4.91mm / y=2.40mm |
|
721
|
Wed Mar 29 13:35:25 2023 |
MJ | | Problem | Linac Commissionning |
|
ICT1 ?? | |
demarrage vers 13h
Pb de vide depuis une demi-heure (MV-1 rouge sur le pss) Bruno est venu + Nourredine tel
pb resolu
ICT 1 ne fonctionne pas
ICT1 re fonctionne , par contre pB moyennaage et std DS mean std ne fonctionne pas bien?
|
| Attachment 1: ICT1_2023-03-29_14-05-01.png
|
 |
| Attachment 2: ICT1_2023-03-29_14-06-38.png
|
 |
|
720
|
Mon Mar 27 13:55:41 2023 |
Entered by Super Team from 134.158.195.141 on Mon Mar 27 13:55:24 2023 | Under Process | Info | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Etat ThomX | |
Cavité FP a terminé son intervention
Mise sous vide possible cette après-midi
14h Intervention IHM cavité RF
14h04 Fermeture casemate
Interruption possible pour mettre demi-anneau sous vide
Etude IHM cavité RF en cours (PG, ME)
14h45 Mise sous vide demi anneau, ouverture casemate
16h Fin d'intervention du vide, pompage turbo en cours
|
|
719
|
Fri Mar 24 08:52:49 2023 |
SC/JNC/VC | Under Process | Problem | CC |
|
Redémarrage ThomX | |
8h53 Serveur DNS et DHCP non redémarré, ping ne fonctionne pas, en attente d'une solution
Re-démarrage automate et cpci (JNC)
14h13 ping sur automate ok
15H
er/sy/rac.17-elr.01-rdp.03 dans IHM healthckeck remarrage impossible .. dans astor
Remise en route synchro et camera (ND)
Re-démarrage de tout dans astor
Reste à regarder : er/sy/rac.14-elr.01-rdp.03 en server off qui refuse de se mettre on
Allumer le laser photocathode.
pompage vide pompe ionique prévu pour lundi, pas de faisceau lundi. |
| Attachment 1: ping_automate.png
|
 |
| Attachment 2: camera_lidgsst.01.png
|
 |
| Attachment 3: rf_gun_ihm.png
|
 |
| Attachment 4: srv4_astor.png
|
 |
| Attachment 5: redpitaya_ihm.png
|
 |
|
718
|
Thu Mar 23 15:15:56 2023 |
SC | Under Process | Problem | CC |
|
Tests CC apres re-démarrage | |
15h16 redémarrage de client 3
Problème avec le commutateur de la baie en salle de controle (celui qui gère les badges), action en cours pour le changer, Nouveau commutateur : thomx baie38-3, RES505
Client 1 ok
Client 2 ok
Client 3 ok
Client 4 ok
Client 5 ok
15h48 : Automate de la baie 5 ne redémarre pas
16h27 : Toujours pas d'automate dans la baie 5
ticket envoyé à CC pour savoir comment on fait quand le ping de automate-b5.thomx.fr donne un Destination Host Unreachable
16h50 Re-démarrage des serveurs pour essayer de relancer l'automate et arret des diags
17h25 Toujours pas d'automate b5, diags à l'arret
A suivre demain |
|
717
|
Fri Mar 17 08:55:42 2023 |
IC, VM, VK, ND | | Shift summary | Ring Commissioning |
|
RIng commissioning | |
8:50 Mise en chauffe
10h Starting the beam
Tuning of the TL
We started from the last Friday setting and the beam storage was not succefull.
Optimization of the storage. The RF freq was set to 500.424 MHz. RF voltage was 40-100 kV
After several optimizations, the good storage was obtained ~15h
The final RF freq 500.4099 MHz
The data was taken concerning the betatron oscillations. Should be analysed offline.
16h40 Shift finished.
|
| Attachment 1: health_check_2023_03_17_09_01.png
|
 |
| Attachment 2: Screenshot_from_2023-03-17_15-03-31.png
|
 |
| Attachment 3: Screenshot_from_2023-03-17_15-01-16.png
|
 |
| Attachment 4: Screenshot_from_2023-03-17_14-49-20.png
|
 |
| Attachment 5: scan_charge_phase_min_0.0_max_360.0_10_4_2.png
|
 |
| Attachment 6: orbitGOODST100_17032023.png
|
 |
| Attachment 7: orbitGOODST_17032023.png
|
 |
| Attachment 8: BPMGOODST2_17032023.png
|
 |
| Attachment 9: BPMGOODST23_17032023.png
|
 |
| Attachment 10: BPM2_17032023.png
|
 |
|
716
|
Thu Mar 16 10:15:13 2023 |
ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot | New Solution | Shift summary | Ring Commissioning |
|
Prise de donnee 16/3/2023 | |
9:15 Mise en chauffe
10:30 Ronde casemate
10:40 Start beam
RF laser vs section phase: 113
11:50 Le faisceau bouge de 2 taches focales sur TL/SST.03
12:10 Beam in the ring
13:00 Etude injection dans l 'anneau vs RF gun phase (cf plot). La phase de -52 degrees par rapport a la chute de charge semble bonne.
15:30 Etude de l'effet des fentes sur le pic a l'injection
Fente cote mur tue le pic a l'injection tout en laissant stocker vers 21mm
Fente cote anneau: tue l 'injection tout en laissant passer de la charge vers 14mm
Explication des graphes:
- ligne bleue = charge avant injection (bruit de fond)
- ligne orange = charge a l'injection
- ligne verte = charge apres 10 tours
- ligne rouge = charge apres 50 tours
- ligne magenta = charge apres 100 tours
17:00 Arret machine
|
| Attachment 1: health_check_2023_03_16_10_35.png
|
 |
| Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_46_27.png
|
 |
| Attachment 3: scan_charge_phase_min_270.0_max_310.0_10_47_11.png
|
 |
| Attachment 4: 2023-03-16_10_54_58_li_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 5: 2023-03-16_10_57_11_tl_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 6: scan_2023_03_16_11_45.png
|
 |
| Attachment 7: 2023-03-16_11_48_04_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 8: 2023-03-16_11_49_14_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 9: 2023-03-16_11_50_08_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 10: Ring_injection_vs_gun_phase.png
|
 |
| Attachment 11: Screenshot_from_2023-03-16_15-40-34.png
|
 |
| Attachment 12: Screenshot_from_2023-03-16_15-40-56.png
|
 |
| Attachment 13: Screenshot_from_2023-03-16_15-41-10.png
|
 |
| Attachment 14: Screenshot_from_2023-03-16_15-41-30.png
|
 |
| Attachment 15: Screenshot_from_2023-03-16_15-41-50.png
|
 |
| Attachment 16: Ring_injection_vs_slit_02.png
|
 |
| Attachment 17: Ring_injection_vs_slit_01.png
|
 |
|
715
|
Tue Mar 14 12:10:25 2023 |
KD, SC | Under Process | Shift summary | LI | Laser | Linac Commissionning |
|
shift du 14 mars 2023 | |
12h10 : mise en chauffe modulateur + frigo/chillers
La cavité est intervenu le matin sur le laser CFP.
Viktor doit faire des mesures avec Ronic dans l'après midi pour améliorer le signal de la photodiode/PMT laser Photocathode.
Faisceau en main de Christelle et Sophie l'après midi.
14h Préparation des mesures du signal de la photodiode (VS, RC)
16h fin de la mesure du signal photodiode. Installation du phototube demain matin (VS)
Démarrage faisceau, scan charge phase
HT = 1090V, Att canon = 0DB, Att section = 1.92 dB, consigne canon = 31.75°, consigne section = 29.20°
COL2 = 225 A, COL1 = 65.02 A
Iris 1.3mm, Charge = 110 pC environ, phase = 240, Attenuation laser = 320
16h30 Chargement recette best injection du 1er mars pour la partie TL sans injection
Energie mesurée [52,47.9,51.88,52.25] MeV
Tests sur TL/PS/STR.01-V.01
Arret machine : 17h27
|
|
714
|
Tue Mar 14 09:14:05 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023 | Fixed | Info | Linac Commissionning |
|
RE: Laser status | |
Bonjour Viktor,
c'est moi (KD) qui ai allumé le laser lundi matin. Le laser était bien éteint le matin.
++,
| Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023 wrote: |
|
Bonjour, lundi matin (le 13/03) j'ai trouvé le laser allumé, donc il fonctionne pendant le week-end !!!
Viktor.
|
|
|
713
|
Mon Mar 13 13:54:31 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !!!!!!!!!!! | |
Le bouton PHASE CANON sur le panneau IHM NE FONCTIONNE PLUS !
plus d'acces a la phase canon.
Nicolas t'as fait qqchiose ? |
|
712
|
Mon Mar 13 12:33:40 2023 |
Entered by Viktor Soskov from 134.158.195.153 on Mon Mar 13 12:33:23 2023 | Fixed | Info | Linac Commissionning |
|
Laser status | |
Bonjour, lundi matin (le 13/03) j'ai trouvé le laser allumé, donc il fonctionne pendant le week-end !!!
Viktor. |
|
711
|
Mon Mar 13 12:18:02 2023 |
MJ | Not Fixed | Urgent | Linac Commissionning |
|
IHM SST HS - URGENT | |
IHM sst HS en debut de shift cf image : toutes les cases show camera sont blanches yag 2 3 4 !! RIEN ne marche
URGENT
Nicolas ?
C'est resolu. |
| Attachment 1: IHM_HS_2023-03-13_12-42-01.png
|
 |
| Attachment 2: Screenshot_from_2023-03-13_12-55-32.png
|
 |
|
710
|
Fri Mar 10 09:34:09 2023 |
IC, VM, ND, VK | New Solution | Shift summary | Ring |
|
Prise de donnee 10/3/2023 | |
9h20 Start modulator, cycle magnets
10h20 Intevention Vincent sur PA
10h40 Scan charge phase
12:00 Tentative demarrage cavite
16h00 Diagnostics switched to 1Hz . We returnd to 10 Hz few moments later.
Mohamed turned Cavity to automatic tuning. RF Amplitude 40 kV . Beam is stored.
Understanding of settings of LIbera with N. Hubert.
Tune measurements with excitation coming from extraction kicker (780V), images below.
First time horizontal tune is measured (0.36-0.37) , and is close to the model one. Data stored for postprocessing.
|
| Attachment 1: health_check_2023_03_10_10_41.png
|
 |
| Attachment 2: scan_charge_phase_min_0.0_max_360.0_10_40_59.png
|
 |
| Attachment 3: scan_charge_phase_min_80.0_max_120.0_10_41_43.png
|
 |
| Attachment 4: ring_vars_2023_03_10_13_38.png
|
 |
| Attachment 5: Screenshot_from_2023-03-10_12-07-34.png
|
 |
| Attachment 6: Screenshot_from_2023-03-10_15-22-27.png
|
 |
| Attachment 7: Screenshot_from_2023-03-10_15-42-05.png
|
 |