HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 24 of 58  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
Entry   MJ, KD; RF et anneau 24_4mm.png22_4mm.png
    Reply   MJ, KD; RE: RF et anneau 
Entry   VK, IC. VM, LS; Studies on the beam revolution frequency 12x
Entry   NC,IC, VM,lS;  ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png
Entry   LS, ND; Prise de donnees 23/05 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg
Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png
Entry   VK, IC. AL; Understanding of the shift in RF frequency 18x
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   KD VM VK JN SL; shift du 5 mai 2023 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png
Entry   Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023; Stabilite LINAC 2023-05-03-traitement_Data20230424et26.pdf
    Reply   Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023; RE: Stabilite LINAC 
Entry   VK, VM, IC, LS; Restart storage in the Ring 
Entry   Entered by Viktor Soskov from 134.158.195.153 on Thu May 4 10:09:22 2023; Laser status 
Entry   KD; shift du 03 mai 2023 8x
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
Entry   ND, LS; Prise de donnee 26/4/2023 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png
Entry   Entered by Marie Jacquet from 134.158.89.45 on Wed Apr 26 19:03:42 2023; shift du 26/04 - Quads scans + stabilite 
icon13.gif   CB; run du 20 avril 2023 coil2scan_11h46.png20230420.pptx
Entry   SC,ND,VK, VM, IC; Démarrage faisceau 
Entry   ND,DN,SC,NE, EM; Quart collectif 25/4 
ELOG V3.1.4-395e101