HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 23 of 58  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   SC/CB/JNC; run du 3 juillet 2023 coil2scan_18h06.pngcoil2scan_18h06.png
Entry   LS,ND; run du 30 juin 2023 health_check_2023_06_30_13_20.pngscan_charge_phase_min_280.0_max_320.0_10_54_10.png
Entry   LS, ND; shift du 29 juin 2023 
Entry   ND, LS; ThomX operations 26/6 
Entry   all; X detectes aujourd'hui 2023-06-23-Shift.pdf
Entry   VK, IC, DN, RC, JN; search for X-rays 
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023; recherche IP e-/laser 
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023; Bruit de fond diodes ligneX 2023-06-22-bruit-de-fond-diodes-ligneX.pdf
Entry   ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
Entry   VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
Entry   VK, IC. VM; Orbit correction, BLM in the Ring 7x
Entry   VK, IC. VM; Srart of the beam physics measurements 14x
Entry   VK, IC. VM, ND, LS; beam storage closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png
Entry   ND, RC; Effet eclairage sur detecteurs RX Screenshot_from_2023-06-13_15-27-06.png
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 15:00:13 2023; arret de la machine 
Entry   Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 14:42:00 2023; arręt de la machine 
Entry   SC, ND; Effet changement de phase RF Canon sur TL/BPM.02 Screenshot_from_2023-06-13_13-50-23.png
    Reply   SC, ND; RE: Effet changement de phase RF Canon sur TL/BPM.02 
Entry   VK, IC. VM; Reestablishing running conditions at 500.38 MHz scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png
Entry   LS, MB, VC, ND; Programme prise de donnees 8/06 health_check_2023_06_08_09_30.pnghealth_check_RF_2023_06_08_09_30.pnghealth_check_Vide_2023_06_08_09_30.pnghealth_check_Alimentation_2023_06_08_09_31.png
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
ELOG V3.1.4-395e101