HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 24 of 58  Not logged in ThomX    logo
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
Entry   MJ, KD; RF et anneau 24_4mm.png22_4mm.png
    Reply   MJ, KD; RE: RF et anneau 
Entry   VK, IC. VM, LS; Studies on the beam revolution frequency 12x
Entry   NC,IC, VM,lS;  ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png
Entry   LS, ND; Prise de donnees 23/05 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg
Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png
Entry   VK, IC. AL; Understanding of the shift in RF frequency 18x
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   KD VM VK JN SL; shift du 5 mai 2023 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png
Entry   Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023; Stabilite LINAC 2023-05-03-traitement_Data20230424et26.pdf
    Reply   Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023; RE: Stabilite LINAC 
Entry   VK, VM, IC, LS; Restart storage in the Ring 
Entry   Entered by Viktor Soskov from 134.158.195.153 on Thu May 4 10:09:22 2023; Laser status 
Entry   KD; shift du 03 mai 2023 8x
Entry   ND, LS, IC, VM, VK; Prise de donnee 27/4/2023 10x
Entry   ND, LS; Prise de donnee 26/4/2023 2023-04-27_14_41_46_el_dg_sst_01-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png2023-04-27_14_43_34_el_dg_sst_01-ccd_01_RAW.png
Entry   Entered by Marie Jacquet from 134.158.89.45 on Wed Apr 26 19:03:42 2023; shift du 26/04 - Quads scans + stabilite 
icon13.gif   CB; run du 20 avril 2023 coil2scan_11h46.png20230420.pptx
Entry   SC,ND,VK, VM, IC; Démarrage faisceau 
Entry   ND,DN,SC,NE, EM; Quart collectif 25/4 
ELOG V3.1.4-395e101