  1076   Fri May 23 07:57:41 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 23 mai 2025 7h55: mise en chauffe à distance
(modulateur, frigo/chiller, laser, cyclage)

Problème de trigger : tout
  
  1078   Mon May 26 09:38:46 2025 VM, ICUnder ProcessShift summaryRing Commissioning Ring BLM and charge linearity Goals:


-
 6x 
  Draft   Tue May 27 08:34:42 2025 VM, ICUnder ProcessShift summaryRing Commissioning   Goal:
Beam Loss Monitors and Ring injection at
high charge. Studies of the injector for
 9x 
  Draft   Wed May 28 17:29:56 2025 KD,VM,ICUnder ProcessShift summaryRing Commissioning   08h00 ThomX was started

Goals:
Emittance measurements, ring optics study
 EmittanceVsGunPhase.pngScreenshot_from_2025-05-28_11-28-14.png 
  1081   Tue Jun 3 07:58:38 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 03 juin 2025 8h: mise en chauffe à distance (modulateur,
frigo/chiller, laser, cyclage)
  
  1082   Wed Jun 4 08:17:36 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 04 juin 2025 8h10: mise en chauffe à distance
(modulateur, laser, frigo/chiller, cyclage)

  * le cylcage plante
 DS_IHM.pngtest_initial.pngtest_final.png 
  1083   Thu Jun 5 08:26:31 2025 VM, IC, DN, RCUnder ProcessShift summaryRing Commissioning Interaction region studies Goals: Optimization
of the IP. Verification of the llaser waist
 6x 
  Draft   Fri Jun 6 08:17:31 2025 MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025Under ProcessShift summaryRing Commissioning   08h15 ThomX was started; Modulator,
Frig, Laser

08h21 Chillers were started,
 ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png 
  1085   Tue Jun 10 18:39:54 2025 SC, HGUnder ProcessShift summaryLI | TL Emittance + data taking  phi max :  220 deg Qmax = 120 pC

Laser new position : 4.714
/ 3.524
 Emittance_QP7_phiS_222.pngEmittance_QP7_phiS_220.pngEmittance_QP7.pngEmittance_QP3.png 
  1086   Wed Jun 11 08:12:28 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 11 juin 2025 8h10: mise en chauffe à distance
(modulateur, frigo/chiller, cyclage aimant,
laser)
  
  Draft   Fri Jun 13 08:41:04 2025 VM,ICUnder ProcessShift summaryLinac Commissionning   08h40 ThomX was started: Modulator,
Frig, Laser

08h45 Chillers were started,
 health_check_Diag_charge_wavecatcher_2025_06_13_10_13.pngScreenshot_from_2025-06-13_11-11-22.pngScreenshot_from_2025-06-13_14-31-57.pngScreenshot_from_2025-06-13_14-31-45.png 
  1089   Wed Jun 18 12:45:49 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 18 12:45:28 2025Under ProcessInfoLinac Commissionning Linac measurement + phase +  
Phi Qmax ; 324° : Phi Emax
: 274°
Qmax : 70-80 pC (Att
: 290°) and 300 pC (Att : 420°)
Recipt
 6x 
  Draft   Thu Jun 19 08:10:54 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 19 juin 2025 8h: mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

***
  
  1091   Fri Jun 20 08:23:10 2025 KDUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 20 juin 2025 8h20: mise en chauffe en remote (frigo/chiller,
modulateur, laser, Cyclage)

IHM cyclage plante toujours au
 6x 
  1093   Wed Jun 25 18:47:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jun 25 18:47:07 2025Under ProcessShift summaryLI Laser position icon1.gif New laser position :

5.041
4.448
  
  1094   Thu Jun 26 08:55:15 2025 IC, DN, RC, HG, MEUnder ProcessShift summaryRing Commissioning Improve ring for X-rays  Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and
 7x 
  1096   Tue Jul 1 08:15:08 2025 KD MJ VC DN RCUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 01 juillet 2025 8h15: mise en chauffe distance (chiller/frigo,
modulateur, laser, cyclage)

9h45: modulateur ok  
 orbit_recette_flat.png 
  1097   Wed Jul 2 14:45:20 2025 Entered by Super Team from 134.158.195.141 on Wed Jul 2 14:45:07 2025Under ProcessInfoLI   Vérif position laser photocathode
:

--> bouge de 1mm en Y et 0.2
  
  1098   Thu Jul 3 08:06:05 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 03 juillet 2025 8h05: mise en chauffe en remote (frigo/chiller,
laser, modulateur, cyclage)

9h: problème avec le DEG04
 2025-07-03_12_56_24_el_dg_sst_01-ccd_01_RAW.png2025-07-03_10_40_07_OBL_DG_MRSV_01-CCD_01_RAW_0.pngspectre_70keV.bmp 
  1100   Mon Jul 7 08:04:06 2025 KD,ND, RC,DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 07 juillet 2025 8h: mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

9h14: Demarrage faisceau
  
ELOG V3.1.4-395e101