ND, RC; Effet eclairage sur detecteurs RX
|
Effet de l'eclairage dans la casemate sur les detecteurs a RX (lumiere eteinte a 15:26:40) => il faut fonctionner avec la lumiere eteinte pour
plus de sensibilite. |
Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 15:00:13 2023; arret de la machine
|
Bonjour,
avant d'arrêter completement de la machine il faut absolument fermer le "Gate laser" via
1, LI/OP/OPT.02-LAS.01-ASP.01 - Gate_int -False |
Entered by Viktor Soskov from 134.158.195.153 on Tue Jun 13 14:42:00 2023; arręt de la machine
|
Bonjour,
avant d'arrêter completement de la machine il faut absolument fermer le "Gate laser" via
1, LI/OP/OPT.02-LAS.01-ASP.01 - Gate_int -False |
SC, ND; Effet changement de phase RF Canon sur TL/BPM.02
|
Quelques changements de phase canon. On voit que quand l'orbite derive vers des valeurs negatives sur Tl/BPM.02/SpX le fait de faire decroitre la
phase rattrappe la position...
|
SC, ND; RE: Effet changement de phase RF Canon sur TL/BPM.02
|
Le code lock_position_tl_bpm_02.py a ete mis a jour pour prendre cet effet en compte.
SC, |
VK, IC. VM; Reestablishing running conditions at 500.38 MHz    
|
Goal of the shift: Reestablish the good storage at 500.38 and then try to optimize the storage and orbit.
Start up of the machine.
RF cavity start up by Mohamed. Water leakage. Jean-Noel will fix tomorrow mornig. Mohamed also says that aparently the sinal from ring syntetizer |
LS, MB, VC, ND; Programme prise de donnees 8/06   
|
9:23 Mise en chauffe
Nombreux pb vide dans health check
Acces casemate pour verification polarite RI-C2/DG/BPM.02 pas de probleme trouve. |
ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
|
Goal: understanding of teh beam natural revolution frequency. Study the effect of the dipoles.
We have started from the previous setting of the machine. Then we loaded the settings from last december and received better storage. RF cavity
is OFF. |
ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency
|
Bonjour,
Pouvez vous enregistrer les images de l'oscilloscope et le donnée brute à la place des screenshots. Il y a une option dans
l'interface web pour enregistrer l'oscillogramme "proprement". De même pour les images, cela permet de faire des traitements à |
MJ, KD; RF et anneau 
|
Apres 18h30 : prise ne main de la machine pour aller dans la LE ==> le kicker d'extraction est interlocké (abdandon)
Essaie avec la derniere recette de l'anneau : à 159.3A le stockage n'est pas tres bon (cavité OFF)
On essai de jouer sur le plongeur pour accorder la cavité à la fréquence de révolution du paquet (voir 2 screenshot |
MJ, KD; RE: RF et anneau
|
Mercredi 24 j'ai fait un test sur la cavité RF :
- Au début la LLRF étant ON alors que la cavité était OFF, est ce normale ? |
VK, IC. VM, LS; Studies on the beam revolution frequency 12x
|
The main task for today is to measure the revolution frequency without RF cavity with the spectrum analyzer.
Start-up of the machine.
After setting the previous setting, the orbit was very different. We checked the injector, the beam also was different (based on the beam images) |
NC,IC, VM,lS;  
|
9:10 warm up modulator
10:30: cycling of magnets
10:20 : scan charge phase |
LS, ND; Prise de donnees 23/05
|
9:30 Demarrage machine
Fin installation Cerenkov + tests MRSV
Laser alignement Cerenkov arrive jusqu'a la camera a balayage |
VK, IC; RF frequency of the Ring   
|
In the morning, after the start-up pf the machine, scan phase-charge and small tuning it was possible to store the beam with the settings from previous
day.
The storage was optimize withthe dipole current of 159.9 (best storage up to now). RF cqvity voltqge 20-100 kV. |
VK, IC. AL; Understanding of the shift in RF frequency 18x
|
8:40 Start warming up, problem with PSS. It was restarted.
Problems to start and tune the RF cavity. A clear working procedure and reliable tuning should b defined to optimize the Ring comissioning progress.
Feedback for teh RF has the suspicious behavior. At motor position close to the nominal, the feedback ofsets the motor in the negative direction |
LS, ND, IC, VK; Ring operation 16/5   
|
9:33 Start warming up
9:45 Ducre is working on the plumbing but it shuld not affect operations
11:00 Intervention JNC pour problemes refroidissement |
ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
|
10:00 Machine warm up
Magnets cycling
11:00 Start machine |
KD VM VK JN SL; shift du 5 mai 2023    
|
8h30 : accès casemate controlé
==> septum et kickers OFF et cavité RF OFF
==> problème cavité RF, mux 3 défaut de communication |
Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023; Stabilite LINAC
|
Pour illustrer la fin de l'entree elog 745 d'aujourd'hui :
(==> Saute de position du faisceau,
cela n'est pas corrélé à une perte de puissance ou de changement de phase (phénomène impossible à reproduire |
Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023; RE: Stabilite LINAC
|
Entered
by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 wrote:
Pour |
VK, VM, IC, LS; Restart storage in the Ring
|
~9h Start of the modulator
10h Tuning of the injector with KD
11h Try to inject in the ring. Only 1-2 turns after optimization. We tried previous injector settings, the situation is the same. We retuned |
Entered by Viktor Soskov from 134.158.195.153 on Thu May 4 10:09:22 2023; Laser status
|
Bonjour l'énergie UV actuelle sur la cathode = 58µJ avec l'iris 1.3mm
Viktor. |
KD; shift du 03 mai 2023 8x
|
9h : Mise en chauffe machine (frigo, chiller, modulateur, PA, Laser)
13h30 : Démarrage Machine
- Quelqu'un a changé la valeur de conversion de l'iris (1.3E10 au lieu de 1E10) ce qui donné une mauvaise taille d'iris |