CB/JNC/SC; Faisceau linac
|
9h20 Mise en chauffe modulateur, démarrage frigo et laser
Permis casemate en rouge sur le PSS mais impossible de rentrer dans la casemate pour appuyer sur les rondiers : Accés interdit. Pas de
faisceau possible. |
VK, IC. VM, LS; Work on the new optics
|
9h30 Start of the modulator and laser
Start of the beam. Problem with charge, the max charge at the end of the TL 60 pC. We can not increase it by the attenuator. To be understood.
Corrector ri-c2/ps/str.03-h.01 does not work => problem to control and tune the orbit. JNC will look |
VK, IC. VM, LS, JNC; Test of the new optics (27-28 July) 6x
|
Start of the modulator and laser at ~9h and hour later start the beam.
Working at 500.38 MHz to retrieve the previous state of the ring. Then switching to 500.33 MHz (assumed ring proper frequency).
- Optimization of the injection and ring (orbit, betatron/synchrotron oscyllations, tune....) |
KD; shift du 26 juillet 2023  
|
9h : mise en chauffe de la machine (frigo, chiller, modulateur, laser) + "start cycling all magnets" dans IHM
11h: début de la prise de donnée
** recentrage des fentes 1 de la ligne X sur le flux compton. Prise du spectre de référence (position flux max ouverture fente1 |
Opérateurs ThomX; shift du 25 juillet 2023 13x
|
* Démarrage de la machine par Iryna/Slava/Viktor et démarrage cavité CFP par Ronic/Daniele
* Préparation du setup de mesure pour la ligne X (Spectromètre CdTe)
==> première mesure à 13h |
ND,LS, KD, JNC; Shift du 24/07/2023
|
10h: Accès casemate
Ajout de deux cables près de TL/ICT.02, un jouant le role d'antenne et l'autre connecté à une résistance
50 Ohm. |
SC/CB/ME; Faisceau linac et cavite RF
|
8h55 Démarrage modulateur et refroidissements
Intervention SPR terminé
Solenoide = 190A, pas de quadrupoles, LI/PS/STR.01-H.01 = -1A, LI/PS/STR.01-H.01 = 0.90A, position laser = hor 4.635mm ver 1.736mm, visualisation |
SC/CB/JNC; run du 3 juillet 2023 
|
9h30 Intervention Maher pour dosimètre
10h00 Mise en chauffe modulateur et refroidissements
14h prises d'image laser selon églage du miroir M5. Le laser n'est pas bien aligné sur l'iris --> a reprendre |
LS,ND; run du 30 juin 2023 
|
9:00 Warm up machine
10:40 Start the beam
10:50 Scan charge phase |
LS, ND; shift du 29 juin 2023
|
9:45 Git pull
Test des interfaces... OK
Probleme sur les ecrans du compte operateur ThomX (4x1 ecran) meme apres redemarrage => reconfiguration |
ND, LS; ThomX operations 26/6
|
9:26 Mise en chauffe
9:40 Cycling the magnets
11:45 Beam ON |
all; X detectes aujourd'hui
|
Aujourd'hui on a detecte des X en mode desynchro (notre signal correspond a ~ 3.10**6 ph/sec)
*** Pour :
- 100 pC stockee pendant 100 ms
- 30 kW dans la cavite
|
VK, IC, DN, RC, JN; search for X-rays
|
8h30 Start of the modumator, laser, magnet cycling
9h45 Beam is ON. Scan charge vs. RF phase.
Attribute Li/OP/OPT.01-ATT.01 is showing value 340mm, this is different from the nominal ones of 300-303. Charge to be remeasured at nominal |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023; recherche IP e-/laser
|
** Au vu de ce shift tres instructif d'aujourd'hui, pour demain:
1) Le sens le moins chronophage des scans table FPC sont:
Partir en Ty negatif, et aller vers Ty pos |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023; Bruit de fond diodes ligneX
|
| |
ND, LS, MB, DN, MA, IC, VK, MEK, JNC, MJ, RC; X-rays attempt 22/06 10x
|
9:23: Mise en chauffe
9:29 Cycle magnets
10:20 Acces casemate cavite CFP |
VK, IC. VM, AL, ND, LS; Orbit correction, optimization of the storage, study of the RF frequency 8x
|
9h30 Start of the modulator and lasser (GATE is closed).
9h46 Data is taken as background.
Cavity is tuned to 500.38 MHz. Optimization of the energy and phase. |
VK, IC. VM; Orbit correction, BLM in the Ring 7x
|
The BLM detector boxes were installed in the ring. We connected 3 fibers and 2 scintillator detectors in th ring to be able to observe the beam losses.
Cabling, connection and checks of the BLM without the beam.
Machine start-up. Modulator was switched on at ~9h30. |
VK, IC. VM; Srart of the beam physics measurements 14x
|
The main idea fo this week is to prepare the beam for the search of the first X-rays.
Start machine without RF cavity. During the day several reboot of the libera.02 (TL).
Study of the dispersion. Measurements of the horizontal dispersion by changing the injector energy (RF section attenuator). |
VK, IC. VM, ND, LS; beam storage   
|
The main idea fo this week is to prepare the beam for the search of the first X-rays.
Start without RF cavity. Study of the orbit. Orbit correction. We menage to correct hor. and vert. orbit.
We put the RF cavity ON. A lot of interlocks during the day. Difficult to operate i this conditions. |