Draft
|
Fri Apr 4 09:05:06 2025 |
ML, VM, DN, ND | Under Process | Shift summary | Ring |
|
Prise de données 4/04 | |
8:59 Mise en chauffe
9:15 Installation laser alignement SR
10:30 Problem Astor et Jive (see screenshot)
Recipe loaded: LI_TL_RI_all_20250402_13_31_23
Adjust orbit
Recipe saved: LI_TL_RI_test_20250404_12_25_21
12:10 Beam stored
Adjust iris position to take into account new ring size.
Problem with controlled access...
14:57 Alignment of the iris OK
15:30 Access to install lenses
17:30 Optimise mens for SR
18:00 Stop beam
|
| Attachment 1: Screenshot_from_2025-04-04_10-30-13.png
|
 |
| Attachment 2: Screenshot_from_2025-04-04_13-58-16.png
|
 |
| Attachment 3: Screenshot_from_2025-04-04_14-29-50.png
|
 |
| Attachment 4: Screenshot_from_2025-04-04_14-56-39.png
|
 |
| Attachment 5: Screenshot_from_2025-04-04_16-19-45.png
|
 |
| Attachment 6: Screenshot_from_2025-04-04_16-51-06.png
|
 |
| Attachment 7: Screenshot_from_2025-04-04_17-17-34.png
|
 |
| Attachment 8: Screenshot_from_2025-04-04_16-19-45.png
|
 |
| Attachment 9: Screenshot_from_2025-04-04_17-53-46.png
|
 |
| Attachment 10: Screenshot_from_2025-04-04_17-22-17.png
|
 |
|
1053
|
Tue Apr 8 10:11:31 2025 |
KD | Under Process | Shift summary | LI | TL | LE | Opt | Linac Commissionning |
|
shift du 8 avril 2024 | |
10h10 : mise en chauffe machine (frigo/chiller, modulateur, laser) + remise de SF6
recette sauvé pour 7MeV jusqu'à TL/SST.03, phase section 53° @34dB (canon energie max @ 3dB)
==> il faut jouer sur le klystron car trop de puissance RF dans la section (atténuation max ~38dB @ 2460pas)
**** Programme ****
Transporter le faisceau à 5MeV en bout de LE (pour manip ONERA)
|
| Attachment 1: 2025-04-08_17_34_45_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.png
|
 |
| Attachment 2: charge_transportee_7MeV.png
|
 |
| Attachment 3: Note_technique_atténuateur_MEGA_industries_V3.pdf
|
|
Draft
|
Thu Apr 10 09:03:35 2025 |
KD, HG, ND, ML, VM | Under Process | Shift summary | Diag | Linac Commissionning | Ring Commissioning |
|
shift du 10 avril 2025 | |
9h : mise en chauffe en remote (frigo/Chiller, Modulateur, laser, cyclage)
*** programme ***
- alignement du rayonnement synchrotron et mesure longueur de paquet dans l'anneau.
- mise en place de la visu du MRSV
17h13 50 MeV. Receipt from 20250313_17_59_00 (Storage X ray 40k pA ) loaded, but Linac steerers set to H [0.73 -2.82], V [-2.5 2.92], RCDS on injection. Saved as 20250410_17_32_06.
RF gun phase is 235 dg., Sect. phase is 222 dg., Att. is 2.4 dB. TL/BPM2 X= 3.5 mm, tunes are: H 0.165, V 0.526
18h49 Stop ThomX |
| Attachment 1: Screenshot_from_2025-04-10_17-10-09.png
|
 |
| Attachment 2: Screenshot_from_2025-04-10_17-09-56.png
|
 |
|
1055
|
Fri Apr 11 08:52:07 2025 |
VC SC HG | Under Process | Shift summary | LI | Linac Commissionning | Ring Commissioning |
|
shift du 11 avril | |
demarrage chauffage 8hh50
faisceau sur Yag 1 depuis 1heure....
le script d'alignement solenoide est introuvable!!!!!
alignement laser photocathode
position laser:
H 4.282
V 3.326
nouvel alignement réalisé avec le script alignsolenoCBV5
valeurs départs
LI/AE/COL.01-MOT.01 = 0.783 mm;
LI/AE/COL.01-MOT.02 = 3.427 mm;
LI/AE/COL.02-MOT.01 = 10.451 mrad ;
LI/AE/COL.02-MOT.02 = -4.359 mrad;
optimisation B entre 0 150A
vérification sur B 50 230A
LI/AE/COL.01-MOT.01 = 1.103 mm;
LI/AE/COL.01-MOT.02 = 3.28 mm;
LI/AE/COL.02-MOT.01 = 11.846 mrad ;
LI/AE/COL.02-MOT.02 = -4.973 mrad;
|
| Attachment 1: align_soir.png
|
 |
|
Draft
|
Tue Apr 15 08:10:35 2025 |
KD | Under Process | Shift summary | Diag | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 15 avril 2025 | |
8h10 : mise en chauffe de la machine à distance (modulateur, chiller/frigo, cyclage)
* redémarrage des DS client5
* impossible de lancer le laser (il faut intervenir en local)
* 8h40 Timing opérationnel à 10Hz
* |
|
1057
|
Wed Apr 16 13:48:05 2025 |
Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025 | Under Process | Shift summary | LI |
|
Beam study | |
Mesures du jour : prendre des images pour refaire le calcul d'émittance en tenant compte des corrélations pour reconstruire le 4D du faisceau.
2 alignements :
Alignement : triplet quads
ST1[H,V] = [0.75 , -2.36]
ST2[H,V] = [-2.91 , 2.68]
Alignement Section : Post ID 1002
str1H 1.64
str1V -1.94
str2H -3.77
str2V 2.87
1 - nous avons verifié notre point de fonctionnement, via un soleno scan pour differents alignements. Le vertical a toujours un soucis à basse valeur de soleno. La variation de l'iris ne change pas le soucis.
2- Quad Scan : nouveau script pour sauvegarder les images. Quad_scan_save_img.py : données pour alignement section
17:30 fin
|
| Attachment 1: Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.png
|
 |
| Attachment 2: Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.png
|
 |
| Attachment 3: Size_vs_SolenoScan_14-07-49.png
|
 |
| Attachment 4: Q_vs_SolenoScan_14-07-50.png
|
 |
| Attachment 5: Figure_2025-04-16_163405.png
|
 |
|
1058
|
Thu Apr 17 08:16:04 2025 |
VM, RC, DN, ND | Under Process | Shift summary | Ring Commissioning |
|
| |
08h15 Start Thomx: modulator, frig, laser
08h21 Chillers started, all magnets cycling
Filesystem very slow
Allarm vacuum valve are in alarm
RAC.17-RDP.01 still faulty
09h38 HV is 'ON'
10:15 Calc DS for attenuators was crashed. It restarted at 0dB attenuation...
12:43 SR on target with Iris closed
Alignemnt...
17:30 Measurement of the bunch length in the ring ~140ps |
| Attachment 1: health_check_Vide_Jauge_2025_04_17_09_25.png
|
 |
| Attachment 2: health_check_RF_Redpitaya_2025_04_17_09_27.png
|
 |
| Attachment 3: bpm_1_vs_kicker_second.png
|
 |
| Attachment 4: viewer_2025_04_17_12_44_06.png
|
 |
| Attachment 5: 20250417_175615.jpg
|
 |
|
1060
|
Mon Apr 28 17:13:58 2025 |
Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025 | Under Process | Info | LI | TL |
|
Hayg / Thibault | |
Position moteur actuels (on ne les vois pas dans le log du shift Sophie/Vincent)
Col-01 Mot-01 : 1.213
Col-01 Mot-02: 3.502
Col-02 Mot-01 : 11.823
Col-02 Mot-02 : -5.429f
On remet les anciennes valeurs de ref.
LI/AE/COL.01-MOT.01 = 0.783 mm;
LI/AE/COL.01-MOT.02 = 3.427 mm;
LI/AE/COL.02-MOT.01 = 10.451 mrad ;
LI/AE/COL.02-MOT.02 = -4.359 mrad;
Données pour comparer le transport Linac dans /data/shared/commissioning_scripts/Data
|
|
1061
|
Tue Apr 29 11:03:14 2025 |
Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025 | Under Process | Info | LI | TL |
|
Data taking for ML | |
Demarrage ACQ pour ML
Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran
data --> /data/shared/commissioning_scripts/Data/data/data_linac_29_04_2025/
Section best phase : 207
Stop ThomX : 19:10 |
|
1062
|
Wed Apr 30 08:51:08 2025 |
VC, DN, MJ, IC, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
Recherche position image camera MRSV | |
Start chauffage 9H
There were some problems: the phase section motor was in the wrong position, although the readings were normal; The rear door of the septum power supply was not fully closed.
12h04 Beam is in the ring, RF cav. at 50 kV, phase is 22.5 dg., the receipt from 17/04/2025 12:31 for the ring. RF gun phase is 153.6 dg. Sect Att. is 2.74 dB, Sect. phase is 211 dg. Receipt saved to referenses folder with MSRV mark
** Recherche point image camera MRSV
Deplacement vertical camera par pas d'environ 5 mm - Mesures des fwhm X et Y camera
12h15 Modulator has been put into standby mode: access to the bunker.
12h45 HV is 'ON' RF gun phase was set to 143.6 dg. Sect phase was set to 208 dg. Charges: -41 pC, -41 pC, -45 pC, Ring TbTsum about 2e7
13h55 Modulator has been put into standby mode: access to the bunker.
14h13 HV is 'ON'
14h16 Modulator has been put into standby mode: access to the bunker.
14h29 HV is 'ON'
14h35 Modulator has been put into standby mode: access to the bunker.
14h49 HV is 'ON'
15h00 Modulator has been put into standby mode: access to the bunker.
15h15 HV is 'ON'
15h22 Modulator has been put into standby mode: access to the bunker.
15h38 HV is 'ON' RF Gun phase is 144.6 dg.
15h46 Modulator has been put into standby mode: access to the bunker.
16h06 HV is 'ON'
16h27 Modulator has been put into standby mode: access to the bunker.
16h46 HV is 'ON'
==> cf screenshot des trends fwhm X et Y MRSV
Points notes sur brouillon par Daniele, a fitter avec une parabole pour determiner les 2 minima X et Y (astigmatie)
Data des trends : MRSV_fwhm_X.dat et MRSV_fwhm_Y.dat dans data/shared
** Verification avec le laser des axes X et Y pour voir s'ils ne sont pas inverses
16h52 Modulator has been put into standby mode: access to the bunker.
Les axes X et Y MRSV sont bien les axes reels X et Y
Cf screenshots : total_beam, coupe_moitie_basse, coupe_moitie_haute
** Test de la procedure de calibration de la cam MRSV
17h28 HV is 'ON'
Position verticale faisceaux sur les 2 bpm autour du dipole :
1) nominal MRSV
2) +0.8
3) +1
4) retour nominal MRSV
==> La positon verticale sur MRSV varie bien comme on l'attend
C'est reproductible ==> Calibration a faire avec la camera en position image
17h42 Stop ThomX
|
| Attachment 1: 2025-04-30_16-23-33_MRSV_fwhm_trends.png
|
 |
| Attachment 2: 2025-04-30_17-14-26_total_beam.png
|
 |
| Attachment 3: 2025-04-30_17-15-03_coupe_moitie_basse.png
|
 |
| Attachment 4: 2025-04-30_17-15-54_coupe_moitie_haute.png
|
 |
|
Draft
|
Fri May 2 08:23:50 2025 |
VM | Under Process | Shift summary | Ring Commissioning |
|
| |
08h22 ThomX was started: modulator, frig, laser
08h28 Chillers was started, all magnets cycling
09h45 HV is 'ON'
There was a problem with the section phase shifter motor. It was fixed by moving the motor a lot.
11h11 RF Gun phase is 149.6 dg., Sect. phase is 207 dg., Att. is 2.77 dB. TL/BPM2 X=0.9 mm. Linac steerers: H [0.54 -2.76], V [-2.29 2.61], -36 pC, -36 pC, -39 pC, RF cav. at 50 kV, phase 21.0 dg. TbTSum in the ring about 2e7
13h0.5 TL optics was set to MADX simulated one. After adjusting the DPI and the septum, charge in the ring and X ray flux did not change. (receipt 20250502_13_04) RF Cav. at 150kV, phase 13.5 dg
13h20 dispersion measurement in the TL
15h38 New lattice loaded, injection was adjusted as well as the ring elements a little bit.
17h00 ThomX was stopped |
|
1066
|
Mon May 12 07:58:58 2025 |
Entered by Kevin Dupraz from 109.222.35.58 on Mon May 12 07:58:41 2025 | Under Process | Shift summary | LI | RF D1 | Vide | Linac Commissionning |
|
shift du 12 mai 2025 : conditionnement GUN | |
8h: mise en chauffe modulateur et frigo/chiller
- problème de lecture de vide (visible sur toute les jauges LINAC)
--> Réparé : un switch (de fin de ligne etait on et mis OFF) |
| Attachment 1: Screenshot_from_2025-05-12_08-02-15_vacuum_problem.png
|
 |
| Attachment 2: Screenshot_from_2025-05-12_14-36-54.png
|
 |
|
1067
|
Mon May 12 16:27:09 2025 |
Entered by Super Team from 134.158.195.141 on Mon May 12 16:26:53 2025 | Under Process | Linac | LI |
|
Conditionnement | |
Demarrage du conditionnement :
Température : 30.90 pour accorder le canon
20dB 19dB ..... 15.5dB à 16h20: vide travaille cf plot.
faut essayer d'accorder à nouveau le canon. Voir trend, avec la courbe du réfléchi qui diminue. A noter que je ne comprends pas la courbe du PiC qui semble pas bonne alors qu'elle vient de la RP3_CHA. 
A noter aussi que le PiK semble perdre des coups, alors que les autres non ... 
17h35 : 11dB -> activité repart un peu à la hausse
17h55 : 8dB (PiC = 1.3 MW): très calme pour le moment
Température de régulation ajustée réguliièrement en augmentant la puissance pour garder un bon tuning (29.75°C)
18h : 7dB(PiC : 1.7 MW)
18h03 : 6.5dB(PiC : 1.9 MW) consigne : 29.5°C
18h06 : 6.dB(PiC : 2.1 MW) consigne : 29.5°C
18h10 : 5.dB(PiC : 2.7 MW) consigne : 29.4°C
18h14 : 4.5 dB(PiC : 3 MW) consigne : 29.3°C
18h20 : 3.5 dB(PiC : 3 MW) consigne : 29.3°C
entre 5 et 3.5 : le vide reste calme mais des claquages visibles dans les ignaux HF
18h22 : 3. dB(PiC : 3 MW) consigne : 29.3°C maintenant on va jouer sur la température pour diminuer le réflechi du canon. Les vides restent bons, pas de soucis de ce coté là.
Plot de la RF en PJ pour montrantque le réflechis s'est amélioré en passant à 3dB (de temp 29.20 --> à 29.45°C)
Résumé vide (plus d'activité apres 14dB, uniquement dégazage)
18h40 : FIN
|
| Attachment 1: Vide_passage_15.5dB.png
|
 |
| Attachment 2: RF_plot_15.5dB_NonAccorde.png
|
 |
| Attachment 3: Trend_RF_Apres_Accord_30deg_15.5dB.png
|
 |
| Attachment 4: Vide_11dB_activité_reprend.png
|
 |
| Attachment 5: RF_3dB_Temp_29.45C.png
|
 |
| Attachment 6: Vide_at_3dB.png
|
 |
| Attachment 7: trend_RF.png
|
 |
|
1068
|
Tue May 13 08:05:21 2025 |
KD, HG, ME | Under Process | Linac | TL | LE | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
shift du 13 mai 2025 : conditionnement GUN | |
8h: mise en chauffe à distance modulateur et frigo/chiller
Demarrage à 10H
HV 1215V
consigne temp canon 29.4°C
att 3dB (3.8 MW)
att 1.25 (7.5MW) consigne temp 29.15°C
att 0 dB (Pic =7.5 MW) consigne 29.05 °C ( 3 µs et 6.26 Hz)
redémarrage conditionnement par Maher à 12h25, att 6 db jusqu'à 0.75 db ( 13h57 ) Il y a des coups " ratés " dans le timing modulateur (voir image jointe)
att 0.25 db 14h05
Il y a toujours des coups " ratés " dans le timing modulateur (voir image jointe) ==> Nicolas est intervenu, le problème de "missed triggers rate " est résolu
Att 0 dB (7.5MW) @ 3µs & 12.5 Hz _Solenoides on (Ifoc=230 A et ICC=66A) ==> consigne temp 28.45 °C (voi images)
fin de conditionnement 18:05
|
| Attachment 1: RF_0dB_3US_6Hz.png
|
 |
| Attachment 2: Vide_0dB_3us_6Hz.png
|
 |
| Attachment 3: Yag_Intensite_Trend_3us_6Hz.png
|
 |
| Attachment 4: Rates_Synchro.png
|
 |
| Attachment 5: RF_0dB_3us_12.5Hz_consi_temp_28.45_2025-05-13_17-57-53.png
|
 |
| Attachment 6: vide_odB_3us_12.5Hz_Ifoc230A_Icc66.4A_2025-05-13_18-00-06.png
|
 |
|
1069
|
Wed May 14 08:07:26 2025 |
KD, HG | Under Process | Shift summary | LI | Opt | Linac Commissionning |
|
shift du 14 mai 2025 | |
8h: mise en chauffe à distance (modulateur, frigo/chiller, laser)
10h30: on a du faisceau atténuateur à 260pas pour 100pC.
Nouveau point cathode : [H,V] = [4.81, 3.62]
11h: stockage dans l'anneau avec la recette 50MeV de 100pC
Problem de lecture des charges (Wavecatcher) quand les kickers sont en marche (trig sur du bruit). Le problème n'existe pas quand le kicker est éteint.
17h: Variation de la charge uniquement (machine non touchée). Charge max ~ 500pC pour iris à 1.3mm
==> Stockage ok à 500pC (sans rien faire), il faut optimiser et regarder plus en détail car il n'y a pas un facteur 5 sur la charge stockée (juste 3).
18h : la charge (GUN) oscille, cf plot.
18h30 : soleno scans à differentes charges : 100 pC / 500 et 600 pC (max)
**** Programme ****
refaire du faisceau et retrouver le point de fonctionnement à 100pC avec la nouvelle cathode |
| Attachment 1: Probleme_charge.png
|
 |
| Attachment 2: Probleme_charge2.png
|
 |
| Attachment 3: stockage_100pC.png
|
 |
| Attachment 4: stockage_250pC.png
|
 |
| Attachment 5: stockage_500pC.png
|
 |
| Attachment 6: Charge_oscillation.png
|
 |
| Attachment 7: Size_vs_SolenoScan_18-25-30.png
|
 |
| Attachment 8: Size_vs_SolenoScan_18-30-49.png
|
 |
| Attachment 9: Size_vs_SolenoScan_18-35-05.png
|
 |
|
1070
|
Thu May 15 07:54:16 2025 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 15 mai 2025 | |
7h50: mise en chauffe à distance (Modulateur, chiller/frigo, laser)
cyclage aimant bug ==> impossible de cycler les aimants, trop de plantage
Soleno scan : Iris 0.5 mm --> on retrouve la symétrie : le laser donne cette dissymétrie ...
100pC et 150 pC
*** Programme ***
- refaire du faisceau de rayons X.
- Optimisation de l'injection (haute charge et/ou nouvelle lattice, cf. Viktor) |
| Attachment 1: Size_vs_SolenoScan_18-03-13.png
|
 |
| Attachment 2: Size_vs_SolenoScan_18-12-12.png
|
 |
|
Draft
|
Fri May 16 08:21:36 2025 |
VM, IC, DN | Under Process | Shift summary | Ring Commissioning |
|
| |
08h20 ThomX was started: Modulator, frig, laser
08h27 Chillers were started, cycling all magnets
10h50 HV is 'ON'
12h38 RF Gun phase is 209 dg. Sect. phase is 207 dg. Charge from the RF gun is -70 pC. Laser Att. 260.
The strange behavior of the ICT signals does not allow for phase charge scanning.
Laser Att. Gun Charge pC
260 -70
270 -102
280 -157
290 -255
300 -320
310 -370
320 -400
400 -470
The receipt for MRSV --> for -440 pC Isol=240, adjasted phases (RF Gun 201 dg., Sect. 205 dg.). RF Cav. at 150 kV, Phase 16 dg., More or less good storage. ri-c1/BPM.03- Lib.03 TbTSum 1.8e8
-58 pC -->ri-c1/BPM.03- Lib.03 TbTSum 4e7
Scaling of the charge, very roughly:
In the injector, the charge measured by BPM after the e- gun 440 pC/58 pC ~7.6
In the ring, the TbTSum @2000turns 1.8e8/4e7 ~4.5
So, the difference is 1.6. This can be explained: beam losses in the ring during the injection, transport efficiency from the gun to the ring
14h40 HV was off. Access to the bunker
14h56 HV is 'ON'
15h12 HV was off. Access to the bunker
15h20 HV is 'ON'
15h17 Series of breakdowns in the RF Gun without interlocking
15h31 HV was off. Access to the bunker
15h42 HV is 'ON', RF Cavity interlock, fixed . There is no image. MRSV camera needs to be checked
16h04 HV was off. Access to the bunker
Problem with the camera was fixed
16h27 HV is 'ON', Charges: -424 pC, -420 pC, -461 pC
16h39 RF Gun phase set to 203 dg. sect. phase 203 dg. HV was off. Access to the bunker
16h50 HV is 'ON'. Charges: -423 pC, -420 pC, -461 pC, ri-c1/BPM.03- Lib.03 TbTSum 2e8
17h04 HV was off. Access to the bunker
17h13 HV is 'ON'.
17h24 HV was off. Access to the bunker
17h41 HV is 'ON'.
17h52 ThomX was stopped |
|
1072
|
Mon May 19 17:57:15 2025 |
Entered by Super Team from 134.158.195.141 on Mon May 19 17:56:57 2025 | Under Process | Info | LI | TL |
|
Data : Sole scan, Q scan, random linac Yag_TL1 | |
Today's data :
- coil scan (+ images)
- Q3 scan
- Random scan yag TL2
17:45 - intervention Nicolas WC
18h : fin |
|
1073
|
Tue May 20 15:18:09 2025 |
HG, SC | Under Process | Info | LI |
|
Faisceau injecteur | |
14h : Faisceau, charge max = 200pC à 300 position attenuateur laser
15h : beaucoup de claquages dans le canon, modulateur qui interlocke, et interlock vide en rouge sur le MPS
Le canon n'est plus adapté et impossible de re-démarrer meme à 3dB
Mesure energie laser : diminution du max de l'amplitude qui a diminué de 42 à 36 environ (25%), iris 1.3mm et attenuateur pareil
Maintenant max = 36uJ pour 420
16h04 : remise en route modulateur, on enlève le laser pour remettre la RF, HT = 1215V, att gun = 5dB, le canon n'est pas adapté (a priori c'est normal à 5dB)
Un peu de conditionnement canon pour finir la journée
16uJ le 6 mai et aujourd'hui on a 14 uJ après calculs de Viktor
17:28 att 0 dB (12.5 Hz & 3 µs) voir images température consigne : 28.45 °C
|
| Attachment 1: RF_2025_05_20_0dB_consigne_temp28.45.png
|
 |
| Attachment 2: vide_temp_2025-05-20_17-43-40.png
|
 |
|
1075
|
Thu May 22 08:26:49 2025 |
KD | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 22 mai 2025 | |
8h20 : mise en chauffe de la machine à distance (modulateur, frigo/chiller, laser, cyclage)
att canon 0 dB (3Us & 12.5Hz) Plots RF vide et temp (voir image jointe) |
| Attachment 1: Vide_temp__2025-05-22_11-43-16.png
|
 |
| Attachment 2: RF_2025-05-22_11-42-51.png
|
 |