ID Date Author Status Type Category Important Subjectdown Icon Text Attachments
  473   Tue Jun 7 17:23:59 2022 NDUnder ProcessAnneauAimants Test cycling QP anneau Test de l'IHM de cyclage des aimants
de l'anneau

- l'IHM fonctionne (teste uniquement
  
  668   Fri Jan 13 17:25:33 2023 NDUnder ProcessAnneauAimants Test cyclage aimants 17h25: Test de cyclage de

RI-C1/PS/QP.05

RI-C1/PS/QP.06
  
  186   Thu Nov 25 15:55:17 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 15:54:59 2021Under ProcessLinacLinac Commissionning Test arret urgence faisceau     
  Draft   Wed Jan 14 08:38:33 2026 VM, RC, MJ, ICUnder ProcessShift summaryLI | TL | LE | Ring Test Soleno=245, optic issue de la simu Julien Matching 08h36 Warm-up ThomX: Modulator, Laser,
Fridge
8h41 Chillers were started, cycling
  
  36   Mon Jun 14 15:23:43 2021 Entered by Hayg Guler from 134.158.195.141 on Mon Jun 14 15:23:29 2021FixedInfoRF D1 Températures Chiller icon1.gif Etiquettes des températures :

nous
avons corrigé les étiquettes
affectées aux températures,
 Screenshot_from_2021-06-14_15-26-00.png 
  971   Fri Nov 29 08:22:14 2024 VC, Carlos Buitrago, Sudhanshu Thakur, NDUnder ProcessShift summaryLinac Commissionning TP 29-11--2024 demarrage chauffage 8H20

test nouveau code synchro 50Hz
=> ne fonctionne pas
  
  690   Tue Feb 21 10:23:56 2023 MJ KD HGNot FixedUrgentLinac Commissionning Synchro HS 10h20 HV on

Erreur sstLI 

Qqun peut debloquer ca ? nicolas
 sst1charge.png 
  905   Fri Aug 30 15:15:17 2024 Entered by Vincent Chaumat from 134.158.76.115 on Fri Aug 30 15:15:02 2024FixedOtherLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Synchro La synchro est opérationnelle.

pB de redemarrage des hardwares
avant les serveurs du coup pas de connexion
  
  886   Fri Jul 19 11:11:48 2024 Entered by Vincent Chaumat from 134.158.76.115 on Fri Jul 19 11:11:33 2024FixedProblemSY Syncho pB  La synchro a été testée
ce matin:

Il y avait effectuvement un pB
  
  328   Fri Feb 11 15:52:42 2022 Entered by Super Team from 134.158.195.142 on Fri Feb 11 15:52:28 2022Under ProcessLinacLinac Commissionning Suite redemarrage Les valeurs des seuils des deux première
pompes vide ont été modifiées
de 5e-7 à 5e-5mbar
  
  901   Tue Aug 13 10:28:30 2024 M ELKUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Suite conditionnement section 13/08 pour validation  Vérification Pression SF6
=2.45 bar 

Vérification Températeure
 Scope_RF_signals_0.1dB_3µs_25Hz_13082024.pngRedpitaya_RFsignals_0.1_dB_3µs_25_Hz_13082024.png 
  897   Mon Aug 5 10:50:06 2024 Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024 LinacLI | RF D1 Suite conditionnement section 10h50 Mise en route à 10dB, HT =
1000V

11h04 HT = 1215V, Att sec 3 dB
  
  758   Fri May 26 13:56:17 2023 VK, IC. VM, LS Shift summaryRing Commissioning Studies on the beam revolution frequency The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer.
 12x 
  760   Wed May 31 14:46:21 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning Studies on the Ring revolution frequency Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles.
 8x 
  1038   Fri Mar 14 08:31:19 2025 VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025Under ProcessShift summaryLI | Diag Streak camera measurements 08h28 Start Thomx: Modulator, Laser, Frig

08h33 Chillers were started, cycling
al magnets
 Measurements_summary.pngphase_217.pngphase_224.pngphase_208.pngCR_V1_Blank100ms_linacOptimisedPhase_213_014.png 
  1008   Tue Feb 11 10:31:57 2025 ND, Marie LabatUnder ProcessShift summaryDiag Streak camera 9:20 Start aligning

12:40 Alignement done for both
linac and ring.
 20250211_173802.jpg20250211_174708.jpg 
  746   Wed May 3 20:10:40 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 Shift summaryLinac Commissionning Stabilite LINAC Pour illustrer la fin de l'entree
elog 745 d'aujourd'hui  :

 2023-05-03-traitement_Data20230424et26.pdf 
  770   Wed Jun 14 18:18:32 2023 VK, IC. VM Shift summaryRing Commissioning Srart of the beam physics measurements The main idea fo this week is to
prepare the beam for the search of the first
X-rays.
 14x 
  1077   Fri May 23 18:54:22 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025 Shift summaryLI | Ring Spectro Si VORTEX : Calibration Le spectro Si (vortex/falconX) a ete calibre
avec une feuille d'etain

Calib checkee avec une feuille
 2025-05-23_17-46-30-VORTEX_Sn_Au.png 
  1034   Wed Mar 12 16:50:29 2025 Entered by Super Team from 134.158.195.143 on Wed Mar 12 16:50:08 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Spectres X (positions fentes 2 et temps d'extraction) IP-Fente2 : 8835 mm
IP-capteur_CdTe: 10460

Calib ouverture Fentes2 : +0.1
  