473
|
Tue Jun 7 17:23:59 2022 |
ND | Under Process | Anneau | Aimants |
|
Test cycling QP anneau | | Test de l'IHM de cyclage des aimants
de l'anneau
- l'IHM fonctionne (teste uniquement |
|
|
668
|
Fri Jan 13 17:25:33 2023 |
ND | Under Process | Anneau | Aimants |
|
Test cyclage aimants | | 17h25: Test de cyclage de
RI-C1/PS/QP.05
RI-C1/PS/QP.06 |
|
|
186
|
Thu Nov 25 15:55:17 2021 |
Entered by Super Team from 134.158.195.142 on Thu Nov 25 15:54:59 2021 | Under Process | Linac | Linac Commissionning |
|
Test arret urgence faisceau | | |
|
|
Draft
|
Wed Jan 14 08:38:33 2026 |
VM, RC, MJ, IC | Under Process | Shift summary | LI | TL | LE | Ring |
|
Test Soleno=245, optic issue de la simu Julien Matching | | 08h36 Warm-up ThomX: Modulator, Laser,
Fridge
8h41 Chillers were started, cycling |
|
|
36
|
Mon Jun 14 15:23:43 2021 |
Entered by Hayg Guler from 134.158.195.141 on Mon Jun 14 15:23:29 2021 | Fixed | Info | RF D1 |
|
Températures Chiller |
| Etiquettes des températures :
nous
avons corrigé les étiquettes
affectées aux températures, |
|
|
971
|
Fri Nov 29 08:22:14 2024 |
VC, Carlos Buitrago, Sudhanshu Thakur, ND | Under Process | Shift summary | Linac Commissionning |
|
TP 29-11--2024 | | demarrage chauffage 8H20
test nouveau code synchro 50Hz
=> ne fonctionne pas |
|
|
690
|
Tue Feb 21 10:23:56 2023 |
MJ KD HG | Not Fixed | Urgent | Linac Commissionning |
|
Synchro HS | | 10h20 HV on
Erreur sstLI
Qqun peut debloquer ca ? nicolas |
 |
|
905
|
Fri Aug 30 15:15:17 2024 |
Entered by Vincent Chaumat from 134.158.76.115 on Fri Aug 30 15:15:02 2024 | Fixed | Other | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Synchro | | La synchro est opérationnelle.
pB de redemarrage des hardwares
avant les serveurs du coup pas de connexion |
|
|
886
|
Fri Jul 19 11:11:48 2024 |
Entered by Vincent Chaumat from 134.158.76.115 on Fri Jul 19 11:11:33 2024 | Fixed | Problem | SY |
|
Syncho pB | | La synchro a été testée
ce matin:
Il y avait effectuvement un pB |
|
|
328
|
Fri Feb 11 15:52:42 2022 |
Entered by Super Team from 134.158.195.142 on Fri Feb 11 15:52:28 2022 | Under Process | Linac | Linac Commissionning |
|
Suite redemarrage | | Les valeurs des seuils des deux première
pompes vide ont été modifiées
de 5e-7 à 5e-5mbar |
|
|
901
|
Tue Aug 13 10:28:30 2024 |
M ELK | Under Process | Linac | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Suite conditionnement section 13/08 pour validation | | Vérification Pression SF6
=2.45 bar
Vérification Températeure |
 |
|
897
|
Mon Aug 5 10:50:06 2024 |
Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024 | | Linac | LI | RF D1 |
|
Suite conditionnement section | | 10h50 Mise en route à 10dB, HT =
1000V
11h04 HT = 1215V, Att sec 3 dB |
|
|
758
|
Fri May 26 13:56:17 2023 |
VK, IC. VM, LS | | Shift summary | Ring Commissioning |
|
Studies on the beam revolution frequency | | The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer. |
12x |
|
760
|
Wed May 31 14:46:21 2023 |
ND, LS, IC, VK, VM | | Shift summary | Ring Commissioning |
|
Studies on the Ring revolution frequency | | Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles. |
8x |
|
1038
|
Fri Mar 14 08:31:19 2025 |
VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025 | Under Process | Shift summary | LI | Diag |
|
Streak camera measurements | | 08h28 Start Thomx: Modulator, Laser, Frig
08h33 Chillers were started, cycling
al magnets |
    |
|
1008
|
Tue Feb 11 10:31:57 2025 |
ND, Marie Labat | Under Process | Shift summary | Diag |
|
Streak camera | | 9:20 Start aligning
12:40 Alignement done for both
linac and ring. |
 |
|
746
|
Wed May 3 20:10:40 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 | | Shift summary | Linac Commissionning |
|
Stabilite LINAC | | Pour illustrer la fin de l'entree
elog 745 d'aujourd'hui :
|
|
|
770
|
Wed Jun 14 18:18:32 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Srart of the beam physics measurements | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
14x |
|
1077
|
Fri May 23 18:54:22 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025 | | Shift summary | LI | Ring |
|
Spectro Si VORTEX : Calibration | | Le spectro Si (vortex/falconX) a ete calibre
avec une feuille d'etain
Calib checkee avec une feuille |
|
|
1034
|
Wed Mar 12 16:50:29 2025 |
Entered by Super Team from 134.158.195.143 on Wed Mar 12 16:50:08 2025 | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Spectres X (positions fentes 2 et temps d'extraction) | | IP-Fente2 : 8835 mm
IP-capteur_CdTe: 10460