  413   Thu Mar 24 09:26:22 2022 Entered by Super Team from 134.158.195.141 on Thu Mar 24 09:25:25 2022Under ProcessLinacDiag ThomX -commitionning diag 

Demarrage modulateur 9H

demarrage chiller 9h15

  440   Thu Apr 14 08:04:58 2022 Entered by Super Team from 134.158.195.141 on Thu Apr 14 08:04:41 2022Under ProcessOtherDiag | Electronique | Linac Commissionning ThomX -commitionning diag 

Demarrage modulateur et chiller 8h06

  823   Thu Dec 7 14:46:29 2023 VC, ND Shift summarySY Tests synchro 

Objectif: Test nouveau code CPLD

14:44 Mise en chauffe modulateur

Le code semble fonctionner => tests avec modulateur

15:44 Trig

De nombreux coups manqués. Il va falloir augmenter la largeur des portes echantillonant le 33MHz et le 41MHz. Le nombre de coups manqué est le même à 500,250MHz et à 500.002MHz.

16:50 arrêt

  824   Mon Dec 11 09:41:41 2023 VC,ND Shift summarySY Tests synchro 

8H15 démarrage chiller et modulateur

Mesure synchro, cf https://elog.lal.in2p3.fr/THOMX/Synchronisation/76

Mesures utilisant la redpitaya ER/CA/RAC.17-ELR.01-RDP.04.

On voit régulièrement des arrêts de 8 secondes (ou 16 secondes) dans les données envoyées par la RDP.

16h36: Arrêt

  881   Fri Jun 28 14:37:19 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024 LinacLI | RF D1 Tests reseau RF : branche attenuateur 

charge en position après atténuateur, 10Hz, 3us, 1220V

Ca claque à 15dB et 10dB, mais pas à 0.2dB

on essaye de monter la puissance de 0.2dB à 15dB pour voir ou ça claque.

14h33 : <1dB ça ne claque pas

14h38 : 1dB

14h41 : 1.250dB

14h47 1.9 dB

14h48 2.2 dB

14h50 3dB

14h51 6dB claquage à 6dB

14h59 6dB

15h01 0.2dB

15h01 6dB

15h03 8dB

15h08 8.5dB

15h08 passage à 1200V 0.2dB

15h10 5dB

15h11 0.2dB

15h11 passage à 1220V

15h13 8dB

15h17 8.2dB

15h25 toujours 8.2dB

15h26 8.4dB

15h26 8.6dB

15h28 passage à 1200V (8.6 dB)

15h45 0.4dB signaux instables (pompage)

15h54 Arret

Nombreux claquages à 8.6 dB à 1220V et 1220V

Il semble que la partie mobile de l'atténuateur a un problème

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: test_sur_charge_config.2.pptx
  880   Thu Jun 27 16:14:38 2024 Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024 LinacLI | RF D1 Tests reseau RF 

Charge en sortie diviseur cote section

HT = 1220V (35MW), 10Hz , 3us

Attenuateur cote canon 30 dB

Enregistrement RF_integral_trends_Oscillo.py , début autour de 16h

Pas de claquages

 

Attachment 1: test_sur_charge_config.1.pptx
  470   Thu Jun 2 14:37:53 2022 Entered by SC/MO/VC/FW/MT/HG from 134.158.206.40 on Thu Jun 2 14:37:37 2022Under ProcessLinacLinac Commissionning Tests redpitayas sans faisceau 

Tests sur les redpitayas (MO,VC,FW,MT,HG,SC)

Reboot du modulateur pour démarrer

Switch RF en rouge sur le PSS (rearmement depassivation) : n'empeche pas de demarrer le linac

Redpitayas de la baie 17 sont toutes sur le plus bas calibre LV (-1/+1V), la correction a été apportée sur tous les DSs des redpitayas.

Visualisation du signal photodiode sur taurus plot

Conclusion : la photodiode doit etre branchée sur 50 ohm. Mettre une 50 Ohm sur Redpi4 chb.

La photodiode est actuellement sur redpi4 cha en lieu et place de la boucle.

Pour un iris ouvert à 2 mm et un attenuateur à 400, on a 40 mV sur la photodiode

Modulateur pret

Signaux redpitayas pour HT = 1000 V (à comparer aux mesures oscilloscopes)

HT = 1000V redpi3 cha Pic = 160 mV redpi3 chb Prc serait d'environ 35 à 40 mV sur la fin

HT = 1020 V Pic =175 mV Prc environ 48 mV

HT = 1040 V Pic =185 mV Prc environ 49 mV

HT = 1060 V Pic = 199 mV Prc environ 49 mV

HT = 1080 V Pic = 211 mV Prc environ 46 mV

HT = 1090 V Pic =217 mV Prc environ 46 mV

A comparer à l'oscilloscope

Fin des tests des redpitayas

Faisceau :

Alignement Soleno :

Comparaison de l'orbite pour 2 positions pour les moteurs. (sensibilité très forte)

le programme est en train d'etre amélioré pour tenir compte qu'il faille changer la phase pour refocaliser le faisceau (Yag pour avoir le visuel).

 

Attachment 4: Soleno_MJHG.png
Soleno_MJHG.png
Attachment 5: Soleno_MJHG.png
Soleno_MJHG.png
Attachment 6: Soleno_MJHG.png
Soleno_MJHG.png
Attachment 7: Soleno_MJHG.png
Soleno_MJHG.png
Attachment 8: Soleno_MJHG.png
Soleno_MJHG.png
  112   Tue Oct 12 09:46:33 2021 Entered by sophie chance from 134.158.195.142 on Tue Oct 12 09:46:20 2021FixedLinacSY Tests coupure signaux timing 

Sur un enregistrement de 70 000 s , il n'y a aucun coup manqué sur le timing linac avec une sdev = 11 ms

  7   Tue Jun 8 09:31:28 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 09:31:12 2021Under ProcessInfoetc Tests RFs 

Aujourd'hui, démarrage des tests RFs.

Vérification du bon fonctionnement des IHMs, mise en route du MPS et fermeture casemate en fin de matinée

 

 

  12   Tue Jun 8 14:36:48 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:36:35 2021Under ProcessProblemetc Tests RFs 

Interlock eau sur modulateur, arrêt du modulateur.

Remise en route

A nouveau interlock modulateur, purge de l'eau

Remise en chauffe modulateur ok

Attachment 1: mise_en_chauffe
  200   Mon Dec 6 11:30:53 2021 Entered by Maher OMEICH from 134.158.91.212 on Mon Dec 6 11:30:27 2021Under ProcessAnneauAimants Tests EPs  

Bonjour, demain mardi 07/12 sera une journée casemate ouverte pour les tests des éléments pulsées ( kikers .... )

 

  718   Thu Mar 23 15:15:56 2023 SCUnder ProcessProblemCC Tests CC apres re-démarrage 

15h16 redémarrage de client 3

Problème avec le commutateur de la baie en salle de controle (celui qui gère les badges), action en cours pour le changer, Nouveau commutateur : thomx baie38-3, RES505

Client 1 ok

Client 2 ok

Client 3 ok

Client 4 ok

Client 5 ok

15h48 : Automate de la baie 5 ne redémarre pas

16h27 : Toujours pas d'automate dans la baie 5

ticket envoyé à CC pour savoir comment on fait quand le ping de automate-b5.thomx.fr donne un Destination Host Unreachable

16h50 Re-démarrage des serveurs pour essayer de relancer l'automate et arret des diags

17h25 Toujours pas d'automate b5, diags à l'arret

A suivre demain

  1031   Fri Mar 7 11:03:20 2025 Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025Under ProcessShift summaryLI | Diag Test streak camera 7/03 

9:10 Debut alignement

10:30 Mise en chauffe machine

10:45 Fin alignement

11:30 Demarrage

Puisance reflechie tres forte... On redescend en tension.

Pas de laser sur la camera. Le voyant "Danger laser" n'est pas allum'e en salle laser.

12:45 Toujours pas de laser, machine mise en standby.

Probleme gate_int?

13h50 Laser is back!

On parvient a transporter jusqu'a la camera streak mais on ne voit pas le signal sur la camera...

Realignement...

Toujours rien...

16h50 Arret faisceau

 

 

  885   Thu Jul 18 19:39:09 2024 Jean-Noel, MarieFixedShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Test reseau RF: Tout est OK 

Apres changement du dephaseur : debut des tests RF vers 17h30

** Le defaut est a 25 Hz, impossible de passer a 10 Hz,

ni avec l'IHM "Manual RF conditionning" en cliquand sur 10 Hz (cf screen shot)   
ni avec l'IHM Reglage phase RF et taux de repetition"  (cf screen shot : "Linac rep. rate" et "commands experts" n'ont strictement aucun effet)

--> on fait les tests a 25 Hz

** Le chassis Trigger bug regulierement : quand il bug, il faut aller appuyer sur un composant dans le chassis pour qu'il remarche (le 2eme composant en partant de la gauche)

** Test de la charge attenuateur :

  • 25 Hz, 1 mu sec, atten 30 dB :  Klystron de 1070 a 1215 V --> tout est OK
  • Idem mais avec 2 mu sec --> OK
  • Idem avec 3 mu sec --> OK

** Test du dephaseur a phi=50 degres sur l'IHM (courbe de calib NON rentree)

Conditions : 25 Hz, 3 mu sec, 1215 V et on bouge l'attenuateur de 30 dB a 0.1 db
On laisse une minute environ a chaque changement de valeur d'attenuateur.
Bilan : 1 claquage a 5 db, 1 claquage a 3 db, 1 claquage a 0.5 db. Claquage unique, le Klystron repart tout de suite. --> tout est ok

** Test dephaseur en mouvement

Conditions : 25 Hz, 3 mu sec, 1215 V, atten=0.1 dB et on bouge la phase de la limite max basse a la limite max haute avec l'ATK panel
Bilan : aucun claquage

** Screen shot typique en pj des signaux qu'on a eu pendant ces 2 heures (je n'ai pas reussi a faire fonctionner le trend ...)

Fin vers 19h30.

Tout est ok, merci JN et la meca !!!

 

Attachment 1: rep_freq_2024-07-18_19-17-18.png
rep_freq_2024-07-18_19-17-18.png
Attachment 2: rep_fre_2024-07-18_19-16-42.png
rep_fre_2024-07-18_19-16-42.png
Attachment 3: 2024-07-18_18-42-24_9db.png
2024-07-18_18-42-24_9db.png
  1177   Thu Jan 8 09:07:08 2026 IC, HG, RC, DN, JMUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Test of the new receipt from BMAD Isol = 242 A 

8h55: mise en chauffe (modulateur, frigo/chillers, laser, cyclage)

10h20 HV ON

Start with the receipt nominal.  problem with the RF gun laser camera. Solved.

Going to the new receipt for Isol = 242 A

Tuning injection. Good storage.

We performed sveral scans with FPC. The measured vert beam siwe is about 82 um. The best X-ray fluc I3+I4 was about 30-40 kpA.

The size at MRSv hor/vert is about 15/19 pixels

Starting from a certain moment, the trig to trig injection stability changed. See the screenshot. This to be understood.

Going to nominal receipt. After the tuning of the injection, the good storage is obtained. Size at MRSV 15/24 pixels

measurements of the dispersion and LOCO studies. First without sextupoles and later with. To be continued.

Going back to new receipt Isol = 242 A. Storage is bad. Retuning of the TL and injeciton. Good storage is obtained with good tunes 0.17/0.7.

Studies with X-rays will be continued tomorrow.

dispersion and beta function measurement as tunes are seems to be quite stable

Switching on the streak camera.

Phases during the day:

RF Gun: 296; 229; 242

RF section: 218; 209; 218


 

Attachment 1: Screenshot_from_2026-01-08_12-19-34.png
Screenshot_from_2026-01-08_12-19-34.png
Attachment 2: Screenshot_from_2026-01-08_12-06-27.png
Screenshot_from_2026-01-08_12-06-27.png
Attachment 3: Screenshot_from_2026-01-08_12-39-03.png
Screenshot_from_2026-01-08_12-39-03.png
Attachment 4: Screenshot_from_2026-01-08_12-39-34.png
Screenshot_from_2026-01-08_12-39-34.png
Attachment 5: Screenshot_from_2026-01-08_12-46-37.png
Screenshot_from_2026-01-08_12-46-37.png
Attachment 6: Screenshot_from_2026-01-08_12-47-55.png
Screenshot_from_2026-01-08_12-47-55.png
Attachment 7: Screenshot_from_2026-01-08_12-50-17.png
Screenshot_from_2026-01-08_12-50-17.png
Attachment 8: Screenshot_from_2026-01-08_13-15-31.png
Screenshot_from_2026-01-08_13-15-31.png
Attachment 9: FWHM_Trend_Screenshot_from_2026-01-08_13-43-57.png
FWHM_Trend_Screenshot_from_2026-01-08_13-43-57.png
Attachment 10: Screenshot_from_2026-01-08_14-14-01NOM.png
Screenshot_from_2026-01-08_14-14-01NOM.png
Attachment 11: Screenshot_from_2026-01-08_14-32-38nominal.png
Screenshot_from_2026-01-08_14-32-38nominal.png
Attachment 12: Screenshot_from_2026-01-08_17-22-16BMAD242.png
Screenshot_from_2026-01-08_17-22-16BMAD242.png
Attachment 13: Screenshot_from_2026-01-08_17-36-18.png
Screenshot_from_2026-01-08_17-36-18.png
  786   Fri Jul 28 17:06:02 2023 VK, IC. VM, LS, JNC Shift summaryRing Commissioning Test of the new optics (27-28 July) 

Start of the modulator and laser at ~9h and hour later start the beam.

Working at 500.38 MHz to retrieve the previous state of the ring. Then switching to 500.33 MHz (assumed ring proper frequency).

- Optimization of the injection and ring (orbit, betatron/synchrotron oscyllations,  tune....)

- Load of the new optics with bigger MCF TDR_0.17_0.64_r56_0.4_sx_Dff41.2_DipMagnL.str : MCF=0.0231  chro=0/0. Optimization of the injector and the ring.

- Change the RF frequency to 500.25 MHz. Optimization of the injector nd the ring. The sufficient storage is obtained.

- Going to the 500.33 MHz and working on the orbit, energy and phase.

Observation: either energy or phase of the injector is not stable, it oscillates, so the amplitude of the synchrotron oscillations changes a lot (seen by the TbTX oscillation amplitude). Like this it is very difficult to find the proper energy and phase for the ring. We saved the trend (max TbTX). to be understand and worked out.

To be continued next week.

Attachment 1: Screenshot_from_2023-07-27_20-33-18_50025MHzgood.png
Screenshot_from_2023-07-27_20-33-18_50025MHzgood.png
Attachment 2: Screenshot_from_2023-07-27_19-47-46_50033NEWOPTICS.png
Screenshot_from_2023-07-27_19-47-46_50033NEWOPTICS.png
Attachment 3: Screenshot_from_2023-07-27_18-34-32_50033MHzOrbCor.png
Screenshot_from_2023-07-27_18-34-32_50033MHzOrbCor.png
Attachment 4: Screenshot_from_2023-07-27_15-01-09_50038.png
Screenshot_from_2023-07-27_15-01-09_50038.png
Attachment 5: Screenshot_from_2023-07-27_16-30-48_50038MCFllarger.png
Screenshot_from_2023-07-27_16-30-48_50038MCFllarger.png
Attachment 6: Screenshot_from_2023-07-28_17-32-59.png
Screenshot_from_2023-07-28_17-32-59.png
  443   Thu Apr 14 16:08:22 2022 Entered by VC/ND from 134.158.195.141 on Thu Apr 14 16:08:07 2022Under ProcessLinacDiag | Linac Commissionning Test mesure de charge 

HV modulateur 1000V

Li/ps/COL2 180A

Li/ps/str.01/H -1A

Li/ps/str.01/V +1A

Test filtre capacitif en sortie de Faraday Cup

meilleur résultat avec filtre 1nF après 1m de cable en sortie de FC

acquisitions faites par Nicolas pour traiter les données

 

  498   Thu Jul 7 10:01:07 2022 ND-VC-VK-LPUnder ProcessShift summaryDiag | Linac Commissionning Test interface démarrage + cyclage dipole 

Demarrage chauffage modulateur 9H30

Maher a complété le manque d'eau*

résistivité 3.67 MO baie 18     ( coté résine 556 KO 16MO) 

""INFO"" le DS qui lit l'oscilloscope en salle laser pour la mesure de la phase entre l'oscillateur Laser et la RF (qui était sur test/cc/osc.01/Measurement1) ne peut plus etre appelé (L'atk pannel ne demaare pas ER/DG/RAC.06-osc.01)

 

- 10h45 Cycling

1-acquité erreur anneaux sur MPS DP1 OK

2- acquité coté alim

3- DS reset -init -ON

4- cyclage sur anneau et TL  (DP et QP ) 

TL/DP OK 100%

TL/QP 1 2 3 4 5 7 OK 100%   defaut sur TL/QP 6 

RI-C1/DP OK 100%  

RI-C1/QP OK 100% 1 2 3 4 7 8 9 10 11 12   

RI-C1/QP 5 6    échouent  à 10% cyclage

RI-C2/QP OK 100% 1 3 4 5 6 7 8 9 10 11 12   

RI-C2/QP 2   échoue  à 10 % cyclage

 

RI-C1/DP 168A 

demarrage faiseau

Temperature chiller section > 33C

Difficulte passage de HV a TRIG (clef non tournee)

11h30 Faisceau

11h40 arret faisceau, pb refroidissement

12h05 EP ON
Temperatures OK

12h10: Demarrage faisceau

Test allumage extenction EP: pas de difference sur le faisceau

13h30 laser ON (attention  le shutter li/op/opt.02-las.01-asp.01 était fermé)

 

 

14h35 Scan charge phase 

Phase de charge max = 136 degres

Prise de données bruit BPMs

Passage section phase energie max (-50 degres), phi section = 115 degres, visu sur ecran TL/DG/SST.01, iris = 1.5 mm, COL.02 = 180A, transmission quasi totale

Petit saut gauche droite de faisceau sur les images, image laser 16h46

17h Prise de données bruits BPMs : correlation images SST vs BPMs

17h34 prise de données sur LI/DG/SST.01

Arret des alimentations TL/PS/DP.01 arret du saut de faisceau

 

 

 

 

Attachment 1: 2022-07-06_12_41_52_li_op_las_02_Iris_1.1_RAW_8_16bits.tiff
  411   Wed Mar 23 12:52:58 2022 Entered by Super Team from 134.158.195.141 on Wed Mar 23 12:52:44 2022Under ProcessLinacElectronique | Linac Commissionning Test des redpitaya baie 17 

Point de départ :

- Signal d'entrée : Générateur AFG Techtro, Sortie sur 50 Ohm
--> Sin(f=10kHz) Amplitude : 200 mV CC
--> Signal non synchrone avec le timing

Redpitaya 4 --> ER/SY/RAC.17-ELR.01-RDP.04   Channel A

Signal entre : -2 et 3 (V ?)

Redpitaya 4 --> ER/SY/RAC.17-ELR.01-RDP.04   Channel B

Signal entre : -4 et 6 (V ?)

Redpitaya 1 --> ER/SY/RAC.17-ELR.01-RDP.01   Channel B

Redpitaya 1 --> ER/SY/RAC.17-ELR.01-RDP.01   Channel A

Redpitaya 3--> ER/SY/RAC.17-ELR.03-RDP.01   Channel B

Redpitaya 3 --> ER/SY/RAC.17-ELR.03-RDP.01   Channel A

 

redpitaya 4

A   sortie   (-2 3)

B   sortie   (-4 6)

redpitaya 1

A   sortie   (-2 3)

B   sortie   (-2 3)

redpitaya 3

A   sortie   (-2 3)

B   sortie   (-2 3)  attention rupture acquisition

 

 

  1007   Mon Feb 10 09:42:13 2025 ND, VC, HG, MJUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Test demarrage 10/02 

9:37 Mise en chauffe

Maher signal que des tests ont ete fait sur le canon, leger risque de claquage.

Pression SF6: 2938mbar

Health Check:

rac.17-elr.01-RDP.01 en defaut.

Vanne OC/VA/aval.01 ne s'ouvre pas.

9:55 cycle magnets

Attenuateur canon 0.5dB (cf infos sur tableau en SdC)

Attenuateur section 2.5dB

10:40 Beam ON

Claquages a 1209V.

11:55 Ca passe a 1210V.

12:58 On atteind enfin 1215V!!!

Faisceau centre' a 238 degrees et 2.dB att section.

13:21 Chargement recette good_20250124_15_05_25

Passage 0dB Canon

Faisceau centre' a 238 degrees et 2.28dB att section.

14:00 Ring ferquency set to 500.100450 MHz

Rigol phase adjusted from 175 to 160 degrees

14:10 Faisceau stocke dans l'anneau

Phase -88

==========================

14:45 ; Gun conditioning

Note : vides

Increase attenuation to find multipacting barriers :
- Start 5dB end 6.5 dB ==> max : around 6.5
 

15h15 : 25Hz to speedup conditioning
16h++ : Soleno @ 300A mais interlocks vide puis soleno 280A

18h : On redescend doucement a 0db pour voir si il y a un effet sur les kicks apres ces qq heures de condition.

Tout a coup, plus de charge - FRIGO OFF tout seul tout a coup - (==>modulateur mis sur HV)

Jean-Noel essaie de redemarrer : en local non plus ça ne fonctionne pas.

Probleme résolu, automate était en mode STOP, mode RUN a tout arrangé.  cool

Mercredi : apres shift alignement données de vide @ différent puissance GUN

Zone multipactor autour de 6dB : vide amélioré ! on passe de 10^-9 à 6.10^-10  (V2, v3) V1 un peu aussi. 

2e zone multipactor :   autour de 14 dB. Il faut aussi la conditionner.  voir le dernier graphe. 

 

 

Attachment 1: 20250210_132244.jpg
20250210_132244.jpg
Attachment 2: Gun_Vaac_vs_Attenuation.png
Gun_Vaac_vs_Attenuation.png
Attachment 3: Gun_Vaac_vs_Attenuation_25Hz_note.png
Gun_Vaac_vs_Attenuation_25Hz_note.png
Attachment 4: Gun_Cond_25Hz_propgress.png
Gun_Cond_25Hz_propgress.png
Attachment 5: Gun_Vaac_vs_Attenuation_Soleno300.png
Gun_Vaac_vs_Attenuation_Soleno300.png
Attachment 6: Screenshot_from_2025-02-10_17-57-08.png
Screenshot_from_2025-02-10_17-57-08.png
Attachment 7: Gun_Cond_2e_zone.png
Gun_Cond_2e_zone.png
ELOG V3.1.4-395e101