413
|
Thu Mar 24 09:26:22 2022 |
Entered by Super Team from 134.158.195.141 on Thu Mar 24 09:25:25 2022 | Under Process | Linac | Diag |
|
ThomX -commitionning diag | |
Demarrage modulateur 9H
demarrage chiller 9h15 |
|
440
|
Thu Apr 14 08:04:58 2022 |
Entered by Super Team from 134.158.195.141 on Thu Apr 14 08:04:41 2022 | Under Process | Other | Diag | Electronique | Linac Commissionning |
|
ThomX -commitionning diag | |
Demarrage modulateur et chiller 8h06 |
|
823
|
Thu Dec 7 14:46:29 2023 |
VC, ND | | Shift summary | SY |
|
Tests synchro | |
Objectif: Test nouveau code CPLD
14:44 Mise en chauffe modulateur
Le code semble fonctionner => tests avec modulateur
15:44 Trig
De nombreux coups manqués. Il va falloir augmenter la largeur des portes echantillonant le 33MHz et le 41MHz. Le nombre de coups manqué est le même à 500,250MHz et à 500.002MHz.
16:50 arrêt |
|
824
|
Mon Dec 11 09:41:41 2023 |
VC,ND | | Shift summary | SY |
|
Tests synchro | |
8H15 démarrage chiller et modulateur
Mesure synchro, cf https://elog.lal.in2p3.fr/THOMX/Synchronisation/76
Mesures utilisant la redpitaya ER/CA/RAC.17-ELR.01-RDP.04.
On voit régulièrement des arrêts de 8 secondes (ou 16 secondes) dans les données envoyées par la RDP.
16h36: Arrêt |
|
881
|
Fri Jun 28 14:37:19 2024 |
Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024 | | Linac | LI | RF D1 |
|
Tests reseau RF : branche attenuateur | |
charge en position après atténuateur, 10Hz, 3us, 1220V
Ca claque à 15dB et 10dB, mais pas à 0.2dB
on essaye de monter la puissance de 0.2dB à 15dB pour voir ou ça claque.
14h33 : <1dB ça ne claque pas
14h38 : 1dB
14h41 : 1.250dB
14h47 1.9 dB
14h48 2.2 dB
14h50 3dB
14h51 6dB claquage à 6dB
14h59 6dB
15h01 0.2dB
15h01 6dB
15h03 8dB
15h08 8.5dB
15h08 passage à 1200V 0.2dB
15h10 5dB
15h11 0.2dB
15h11 passage à 1220V
15h13 8dB
15h17 8.2dB
15h25 toujours 8.2dB
15h26 8.4dB
15h26 8.6dB
15h28 passage à 1200V (8.6 dB)
15h45 0.4dB signaux instables (pompage)
15h54 Arret
Nombreux claquages à 8.6 dB à 1220V et 1220V
Il semble que la partie mobile de l'atténuateur a un problème
|
| Attachment 1: test_sur_charge_config.2.pptx
|
|
880
|
Thu Jun 27 16:14:38 2024 |
Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024 | | Linac | LI | RF D1 |
|
Tests reseau RF | |
Charge en sortie diviseur cote section
HT = 1220V (35MW), 10Hz , 3us
Attenuateur cote canon 30 dB
Enregistrement RF_integral_trends_Oscillo.py , début autour de 16h
Pas de claquages
|
| Attachment 1: test_sur_charge_config.1.pptx
|
|
470
|
Thu Jun 2 14:37:53 2022 |
Entered by SC/MO/VC/FW/MT/HG from 134.158.206.40 on Thu Jun 2 14:37:37 2022 | Under Process | Linac | Linac Commissionning |
|
Tests redpitayas sans faisceau | |
Tests sur les redpitayas (MO,VC,FW,MT,HG,SC)
Reboot du modulateur pour démarrer
Switch RF en rouge sur le PSS (rearmement depassivation) : n'empeche pas de demarrer le linac
Redpitayas de la baie 17 sont toutes sur le plus bas calibre LV (-1/+1V), la correction a été apportée sur tous les DSs des redpitayas.
Visualisation du signal photodiode sur taurus plot

Conclusion : la photodiode doit etre branchée sur 50 ohm. Mettre une 50 Ohm sur Redpi4 chb.
La photodiode est actuellement sur redpi4 cha en lieu et place de la boucle.
Pour un iris ouvert à 2 mm et un attenuateur à 400, on a 40 mV sur la photodiode

Modulateur pret
Signaux redpitayas pour HT = 1000 V (à comparer aux mesures oscilloscopes)

HT = 1000V redpi3 cha Pic = 160 mV redpi3 chb Prc serait d'environ 35 à 40 mV sur la fin
HT = 1020 V Pic =175 mV Prc environ 48 mV
HT = 1040 V Pic =185 mV Prc environ 49 mV
HT = 1060 V Pic = 199 mV Prc environ 49 mV
HT = 1080 V Pic = 211 mV Prc environ 46 mV
HT = 1090 V Pic =217 mV Prc environ 46 mV
A comparer à l'oscilloscope
Fin des tests des redpitayas
Faisceau :
Alignement Soleno :
Comparaison de l'orbite pour 2 positions pour les moteurs. (sensibilité très forte)

le programme est en train d'etre amélioré pour tenir compte qu'il faille changer la phase pour refocaliser le faisceau (Yag pour avoir le visuel).
|
| Attachment 4: Soleno_MJHG.png
|
 |
| Attachment 5: Soleno_MJHG.png
|
 |
| Attachment 6: Soleno_MJHG.png
|
 |
| Attachment 7: Soleno_MJHG.png
|
 |
| Attachment 8: Soleno_MJHG.png
|
 |
|
112
|
Tue Oct 12 09:46:33 2021 |
Entered by sophie chance from 134.158.195.142 on Tue Oct 12 09:46:20 2021 | Fixed | Linac | SY |
|
Tests coupure signaux timing | |
Sur un enregistrement de 70 000 s , il n'y a aucun coup manqué sur le timing linac avec une sdev = 11 ms |
|
7
|
Tue Jun 8 09:31:28 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 09:31:12 2021 | Under Process | Info | etc |
|
Tests RFs | |
Aujourd'hui, démarrage des tests RFs.
Vérification du bon fonctionnement des IHMs, mise en route du MPS et fermeture casemate en fin de matinée
|
|
12
|
Tue Jun 8 14:36:48 2021 |
Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:36:35 2021 | Under Process | Problem | etc |
|
Tests RFs | |
Interlock eau sur modulateur, arrêt du modulateur.
Remise en route
A nouveau interlock modulateur, purge de l'eau
Remise en chauffe modulateur ok |
| Attachment 1: mise_en_chauffe
|
|
200
|
Mon Dec 6 11:30:53 2021 |
Entered by Maher OMEICH from 134.158.91.212 on Mon Dec 6 11:30:27 2021 | Under Process | Anneau | Aimants |
|
Tests EPs | |
Bonjour, demain mardi 07/12 sera une journée casemate ouverte pour les tests des éléments pulsées ( kikers .... )
|
|
718
|
Thu Mar 23 15:15:56 2023 |
SC | Under Process | Problem | CC |
|
Tests CC apres re-démarrage | |
15h16 redémarrage de client 3
Problème avec le commutateur de la baie en salle de controle (celui qui gère les badges), action en cours pour le changer, Nouveau commutateur : thomx baie38-3, RES505
Client 1 ok
Client 2 ok
Client 3 ok
Client 4 ok
Client 5 ok
15h48 : Automate de la baie 5 ne redémarre pas
16h27 : Toujours pas d'automate dans la baie 5
ticket envoyé à CC pour savoir comment on fait quand le ping de automate-b5.thomx.fr donne un Destination Host Unreachable
16h50 Re-démarrage des serveurs pour essayer de relancer l'automate et arret des diags
17h25 Toujours pas d'automate b5, diags à l'arret
A suivre demain |
|
1031
|
Fri Mar 7 11:03:20 2025 |
Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025 | Under Process | Shift summary | LI | Diag |
|
Test streak camera 7/03 | |
9:10 Debut alignement
10:30 Mise en chauffe machine
10:45 Fin alignement
11:30 Demarrage
Puisance reflechie tres forte... On redescend en tension.
Pas de laser sur la camera. Le voyant "Danger laser" n'est pas allum'e en salle laser.
12:45 Toujours pas de laser, machine mise en standby.
Probleme gate_int?
13h50 Laser is back!
On parvient a transporter jusqu'a la camera streak mais on ne voit pas le signal sur la camera...
Realignement...
Toujours rien...
16h50 Arret faisceau
|
|
885
|
Thu Jul 18 19:39:09 2024 |
Jean-Noel, Marie | Fixed | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Test reseau RF: Tout est OK | |
Apres changement du dephaseur : debut des tests RF vers 17h30
** Le defaut est a 25 Hz, impossible de passer a 10 Hz,
ni avec l'IHM "Manual RF conditionning" en cliquand sur 10 Hz (cf screen shot)
ni avec l'IHM Reglage phase RF et taux de repetition" (cf screen shot : "Linac rep. rate" et "commands experts" n'ont strictement aucun effet)
--> on fait les tests a 25 Hz
** Le chassis Trigger bug regulierement : quand il bug, il faut aller appuyer sur un composant dans le chassis pour qu'il remarche (le 2eme composant en partant de la gauche)
** Test de la charge attenuateur :
- 25 Hz, 1 mu sec, atten 30 dB : Klystron de 1070 a 1215 V --> tout est OK
- Idem mais avec 2 mu sec --> OK
- Idem avec 3 mu sec --> OK
** Test du dephaseur a phi=50 degres sur l'IHM (courbe de calib NON rentree)
Conditions : 25 Hz, 3 mu sec, 1215 V et on bouge l'attenuateur de 30 dB a 0.1 db
On laisse une minute environ a chaque changement de valeur d'attenuateur.
Bilan : 1 claquage a 5 db, 1 claquage a 3 db, 1 claquage a 0.5 db. Claquage unique, le Klystron repart tout de suite. --> tout est ok
** Test dephaseur en mouvement
Conditions : 25 Hz, 3 mu sec, 1215 V, atten=0.1 dB et on bouge la phase de la limite max basse a la limite max haute avec l'ATK panel
Bilan : aucun claquage
** Screen shot typique en pj des signaux qu'on a eu pendant ces 2 heures (je n'ai pas reussi a faire fonctionner le trend ...)
Fin vers 19h30.
Tout est ok, merci JN et la meca !!!
|
| Attachment 1: rep_freq_2024-07-18_19-17-18.png
|
 |
| Attachment 2: rep_fre_2024-07-18_19-16-42.png
|
 |
| Attachment 3: 2024-07-18_18-42-24_9db.png
|
 |
|
1177
|
Thu Jan 8 09:07:08 2026 |
IC, HG, RC, DN, JM | Under Process | Shift summary | LI | TL | LE | Ring | Linac Commissionning | Ring Commissioning |
|
Test of the new receipt from BMAD Isol = 242 A | |
8h55: mise en chauffe (modulateur, frigo/chillers, laser, cyclage)
10h20 HV ON
Start with the receipt nominal. problem with the RF gun laser camera. Solved.
Going to the new receipt for Isol = 242 A
Tuning injection. Good storage.
We performed sveral scans with FPC. The measured vert beam siwe is about 82 um. The best X-ray fluc I3+I4 was about 30-40 kpA.
The size at MRSv hor/vert is about 15/19 pixels
Starting from a certain moment, the trig to trig injection stability changed. See the screenshot. This to be understood.
Going to nominal receipt. After the tuning of the injection, the good storage is obtained. Size at MRSV 15/24 pixels
measurements of the dispersion and LOCO studies. First without sextupoles and later with. To be continued.
Going back to new receipt Isol = 242 A. Storage is bad. Retuning of the TL and injeciton. Good storage is obtained with good tunes 0.17/0.7.
Studies with X-rays will be continued tomorrow.
dispersion and beta function measurement as tunes are seems to be quite stable
Switching on the streak camera.
Phases during the day:
RF Gun: 296; 229; 242
RF section: 218; 209; 218
|
| Attachment 1: Screenshot_from_2026-01-08_12-19-34.png
|
 |
| Attachment 2: Screenshot_from_2026-01-08_12-06-27.png
|
 |
| Attachment 3: Screenshot_from_2026-01-08_12-39-03.png
|
 |
| Attachment 4: Screenshot_from_2026-01-08_12-39-34.png
|
 |
| Attachment 5: Screenshot_from_2026-01-08_12-46-37.png
|
 |
| Attachment 6: Screenshot_from_2026-01-08_12-47-55.png
|
 |
| Attachment 7: Screenshot_from_2026-01-08_12-50-17.png
|
 |
| Attachment 8: Screenshot_from_2026-01-08_13-15-31.png
|
 |
| Attachment 9: FWHM_Trend_Screenshot_from_2026-01-08_13-43-57.png
|
 |
| Attachment 10: Screenshot_from_2026-01-08_14-14-01NOM.png
|
 |
| Attachment 11: Screenshot_from_2026-01-08_14-32-38nominal.png
|
 |
| Attachment 12: Screenshot_from_2026-01-08_17-22-16BMAD242.png
|
 |
| Attachment 13: Screenshot_from_2026-01-08_17-36-18.png
|
 |
|
786
|
Fri Jul 28 17:06:02 2023 |
VK, IC. VM, LS, JNC | | Shift summary | Ring Commissioning |
|
Test of the new optics (27-28 July) | |
Start of the modulator and laser at ~9h and hour later start the beam.
Working at 500.38 MHz to retrieve the previous state of the ring. Then switching to 500.33 MHz (assumed ring proper frequency).
- Optimization of the injection and ring (orbit, betatron/synchrotron oscyllations, tune....)
- Load of the new optics with bigger MCF TDR_0.17_0.64_r56_0.4_sx_Dff41.2_DipMagnL.str : MCF=0.0231 chro=0/0. Optimization of the injector and the ring.
- Change the RF frequency to 500.25 MHz. Optimization of the injector nd the ring. The sufficient storage is obtained.
- Going to the 500.33 MHz and working on the orbit, energy and phase.
Observation: either energy or phase of the injector is not stable, it oscillates, so the amplitude of the synchrotron oscillations changes a lot (seen by the TbTX oscillation amplitude). Like this it is very difficult to find the proper energy and phase for the ring. We saved the trend (max TbTX). to be understand and worked out.
To be continued next week. |
| Attachment 1: Screenshot_from_2023-07-27_20-33-18_50025MHzgood.png
|
 |
| Attachment 2: Screenshot_from_2023-07-27_19-47-46_50033NEWOPTICS.png
|
 |
| Attachment 3: Screenshot_from_2023-07-27_18-34-32_50033MHzOrbCor.png
|
 |
| Attachment 4: Screenshot_from_2023-07-27_15-01-09_50038.png
|
 |
| Attachment 5: Screenshot_from_2023-07-27_16-30-48_50038MCFllarger.png
|
 |
| Attachment 6: Screenshot_from_2023-07-28_17-32-59.png
|
 |
|
443
|
Thu Apr 14 16:08:22 2022 |
Entered by VC/ND from 134.158.195.141 on Thu Apr 14 16:08:07 2022 | Under Process | Linac | Diag | Linac Commissionning |
|
Test mesure de charge | |
HV modulateur 1000V
Li/ps/COL2 180A
Li/ps/str.01/H -1A
Li/ps/str.01/V +1A
Test filtre capacitif en sortie de Faraday Cup
meilleur résultat avec filtre 1nF après 1m de cable en sortie de FC
acquisitions faites par Nicolas pour traiter les données
|
|
498
|
Thu Jul 7 10:01:07 2022 |
ND-VC-VK-LP | Under Process | Shift summary | Diag | Linac Commissionning |
|
Test interface démarrage + cyclage dipole | |
Demarrage chauffage modulateur 9H30
Maher a complété le manque d'eau*
résistivité 3.67 MO baie 18 ( coté résine 556 KO 16MO)
""INFO"" le DS qui lit l'oscilloscope en salle laser pour la mesure de la phase entre l'oscillateur Laser et la RF (qui était sur test/cc/osc.01/Measurement1) ne peut plus etre appelé (L'atk pannel ne demaare pas ER/DG/RAC.06-osc.01)
- 10h45 Cycling
1-acquité erreur anneaux sur MPS DP1 OK
2- acquité coté alim
3- DS reset -init -ON
4- cyclage sur anneau et TL (DP et QP )
TL/DP OK 100%
TL/QP 1 2 3 4 5 7 OK 100% defaut sur TL/QP 6
RI-C1/DP OK 100%
RI-C1/QP OK 100% 1 2 3 4 7 8 9 10 11 12
RI-C1/QP 5 6 échouent à 10% cyclage
RI-C2/QP OK 100% 1 3 4 5 6 7 8 9 10 11 12
RI-C2/QP 2 échoue à 10 % cyclage
RI-C1/DP 168A
demarrage faiseau
Temperature chiller section > 33C
Difficulte passage de HV a TRIG (clef non tournee)
11h30 Faisceau
11h40 arret faisceau, pb refroidissement
12h05 EP ON
Temperatures OK
12h10: Demarrage faisceau
Test allumage extenction EP: pas de difference sur le faisceau
13h30 laser ON (attention le shutter li/op/opt.02-las.01-asp.01 était fermé)

14h35 Scan charge phase

Phase de charge max = 136 degres
Prise de données bruit BPMs
Passage section phase energie max (-50 degres), phi section = 115 degres, visu sur ecran TL/DG/SST.01, iris = 1.5 mm, COL.02 = 180A, transmission quasi totale
Petit saut gauche droite de faisceau sur les images, image laser 16h46
17h Prise de données bruits BPMs : correlation images SST vs BPMs
17h34 prise de données sur LI/DG/SST.01
Arret des alimentations TL/PS/DP.01 arret du saut de faisceau
|
| Attachment 1: 2022-07-06_12_41_52_li_op_las_02_Iris_1.1_RAW_8_16bits.tiff
|
|
411
|
Wed Mar 23 12:52:58 2022 |
Entered by Super Team from 134.158.195.141 on Wed Mar 23 12:52:44 2022 | Under Process | Linac | Electronique | Linac Commissionning |
|
Test des redpitaya baie 17 | |
Point de départ :
- Signal d'entrée : Générateur AFG Techtro, Sortie sur 50 Ohm
--> Sin(f=10kHz) Amplitude : 200 mV CC
--> Signal non synchrone avec le timing
Redpitaya 4 --> ER/SY/RAC.17-ELR.01-RDP.04 Channel A

Signal entre : -2 et 3 (V ?)
Redpitaya 4 --> ER/SY/RAC.17-ELR.01-RDP.04 Channel B

Signal entre : -4 et 6 (V ?)
Redpitaya 1 --> ER/SY/RAC.17-ELR.01-RDP.01 Channel B

Redpitaya 1 --> ER/SY/RAC.17-ELR.01-RDP.01 Channel A

Redpitaya 3--> ER/SY/RAC.17-ELR.03-RDP.01 Channel B

Redpitaya 3 --> ER/SY/RAC.17-ELR.03-RDP.01 Channel A

redpitaya 4
A sortie (-2 3)
B sortie (-4 6)
redpitaya 1
A sortie (-2 3)
B sortie (-2 3)
redpitaya 3
A sortie (-2 3)
B sortie (-2 3) attention rupture acquisition
|
|
1007
|
Mon Feb 10 09:42:13 2025 |
ND, VC, HG, MJ | Under Process | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Test demarrage 10/02 | |
9:37 Mise en chauffe
Maher signal que des tests ont ete fait sur le canon, leger risque de claquage.
Pression SF6: 2938mbar
Health Check:
rac.17-elr.01-RDP.01 en defaut.
Vanne OC/VA/aval.01 ne s'ouvre pas.
9:55 cycle magnets
Attenuateur canon 0.5dB (cf infos sur tableau en SdC)
Attenuateur section 2.5dB
10:40 Beam ON
Claquages a 1209V.
11:55 Ca passe a 1210V.
12:58 On atteind enfin 1215V!!!
Faisceau centre' a 238 degrees et 2.dB att section.
13:21 Chargement recette good_20250124_15_05_25
Passage 0dB Canon
Faisceau centre' a 238 degrees et 2.28dB att section.
14:00 Ring ferquency set to 500.100450 MHz
Rigol phase adjusted from 175 to 160 degrees
14:10 Faisceau stocke dans l'anneau
Phase -88
==========================
14:45 ; Gun conditioning
Note : vides
Increase attenuation to find multipacting barriers :
- Start 5dB end 6.5 dB ==> max : around 6.5
15h15 : 25Hz to speedup conditioning
16h++ : Soleno @ 300A mais interlocks vide puis soleno 280A
18h : On redescend doucement a 0db pour voir si il y a un effet sur les kicks apres ces qq heures de condition.
Tout a coup, plus de charge - FRIGO OFF tout seul tout a coup - (==>modulateur mis sur HV)
Jean-Noel essaie de redemarrer : en local non plus ça ne fonctionne pas.
Probleme résolu, automate était en mode STOP, mode RUN a tout arrangé. 
Mercredi : apres shift alignement données de vide @ différent puissance GUN
Zone multipactor autour de 6dB : vide amélioré ! on passe de 10^-9 à 6.10^-10 (V2, v3) V1 un peu aussi.
2e zone multipactor : autour de 14 dB. Il faut aussi la conditionner. voir le dernier graphe.
|
| Attachment 1: 20250210_132244.jpg
|
 |
| Attachment 2: Gun_Vaac_vs_Attenuation.png
|
 |
| Attachment 3: Gun_Vaac_vs_Attenuation_25Hz_note.png
|
 |
| Attachment 4: Gun_Cond_25Hz_propgress.png
|
 |
| Attachment 5: Gun_Vaac_vs_Attenuation_Soleno300.png
|
 |
| Attachment 6: Screenshot_from_2025-02-10_17-57-08.png
|
 |
| Attachment 7: Gun_Cond_2e_zone.png
|
 |