  Draft   Fri Mar 20 07:20:47 2026 IC, VMUnder ProcessShift summary  Work on orbit at 70 MeV for X rays 

7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h55 HV is ON

10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers adjusted, Laser phase 56 dg., Sect. Att. 0.191 dB, Sect. phase 255 dg. charges around -100 pC, laser att. 323,

Goal: same orbit as for 50 MeV for X rays.

Work on 70 MeV orbit.

Orbits were obtained near IP. Receipt 70 MeV: recipe_recipe_LI_TL_RI_all_20260320_12_35_26.txt

Work on 61.5 MeV

Receipt 61.5 MeV: recipe_recipe_LI_TL_RI_all_20260320_16_26_35.txt, F=500.034945 MHz

 

Attachment 1: xorbit70MeV_Xrays_20032026.png
xorbit70MeV_Xrays_20032026.png
Attachment 2: yorbit70MeV_Xrays_20032026.png
yorbit70MeV_Xrays_20032026.png
Attachment 3: Screenshot_from_2026-03-20_15-49-43.png
Screenshot_from_2026-03-20_15-49-43.png
Attachment 4: Y_orbit61.5MeV4Xrays.png
Y_orbit61.5MeV4Xrays.png
Attachment 5: X_orbit61.5MeV4Xrays.png
X_orbit61.5MeV4Xrays.png
  242   Mon Jan 10 22:14:14 2022 Entered by Nicolas Delerue from 80.119.21.73 on Mon Jan 10 22:14:00 2022FixedFixDiag WAC reset 

Les wavecatchers ont été réinitialisés pour qu'ils se déclenchent correctement.

  595   Tue Oct 18 17:39:58 2022 Entered by Super Team from 134.158.195.142 on Tue Oct 18 17:39:43 2022Not FixedProblemLaser Voyant rouge en salle Laser icon1.gif 

Voyant apparu vers 17h

SPR est passé voir : peut-etre en lien avec la clim

ce serait la centrale de traitement d'air dont le premier filtre est encrassé. Voyant rouge sur la CTA. 

Est-ce que quelqu'un sait à quoi est relié ce voyant rouge ?

 

  88   Mon Oct 4 19:19:24 2021 Entered by Hayg Guler from 134.158.195.141 on Mon Oct 4 19:19:08 2021Under ProcessInfoLinac Commissionning Vide pendant la prise de données icon1.gif 
Attachment 1: Screenshot_from_2021-10-04_19-21-32.png
Screenshot_from_2021-10-04_19-21-32.png
  5   Tue Dec 1 09:57:09 2020 Entered by Moutardier from 134.158.76.123 on Tue Dec 1 09:56:35 2020 Inforesumes Verrification pour le démarrage a blanc 

Verification de l'état de la Synchro : OK, tout les signaux sont en trigger externe.

Verification de l'état des diagnostiques :
- Libera 3 : n'est pas encore cofiguré (pas génant pour le démarrage a blanc)
- Caméra TL/DG/SST.03-CCD.01 : débranché (pas génant pour le démarrage a blanc)
- Moteur des fentes (TL/DG/SRH.01-MoG.01 et TL/DG/SRH.01-MoG.02) éteint (pas génant pour le démarrage a blanc)
-> OK pour le démarrage a blanc

  1129   Fri Sep 26 09:01:14 2025 ND Shift summaryLI | Diag Verifications IHM_cyclage 

9:00 Accès pour FPC

Recherche des problemes de plantage de l'IHM cyclage.

Plantages difficiles a reproduire (pas de plantage quand j'essaie).

Quelques optimisation du code.

git pull

 

Ajustement des contantes Ks des BPM LI, TL, EL en fonction des attenuations de cables.

Recherche du probleme de profondeur memoire des BPMs.

 

  45   Thu Jul 1 10:04:01 2021 Entered by Nicolas Delerue from 134.158.89.243 on Thu Jul 1 10:03:48 2021Not FixedInfoDiag Veni vedi exit 

Sommes venus pour la reunion SST (ecrans) .

Personne en salle de controle.

Sommes repartis... Appelez nous dans notre bureau quand vous etes prets.

  116   Tue Oct 12 16:01:41 2021 Entered by sophie chance from 134.158.195.142 on Tue Oct 12 16:01:27 2021FixedLinacLinac Commissionning Valeurs transport linac pour tests radioprotection 

Attenuation canon : 2 dB car des claquages sont apparus lors de l'augmentation de l'intensité dans les solénoïdes, mesure à l'oscillo Pic = 140 mV environ --> 77 MV/m

Phase canon = 40 degres energie max pour le transport

Charge à énergie max = 60 pC environ

Attenuateur laser = 295 en position (LI/OP/OPT01.Att01)

Attenuation section : 1.50 dB

Phase section (LI/HFI/DEP01-MOT01) = 3100 steps pour l'attenuation de 1.5 dB

bobines col02 = 138A et col01 = 20A

Steerers = STR01 - H01 = -1.80A, STR01-V01 = -1.00A

L'IHM Alim doit être récupéré pour l'instant dans /data/shared/IHM/PowerSupply/powersupply.py

 

Travail sur la mesure de charge en cours et sur la Faraday cup

Travail sur les BPMs en cours

Nécessité de faire l'alignement

  584   Tue Oct 11 11:09:21 2022 Entered by Marie Jacquet from 134.158.89.45 on Tue Oct 11 11:09:03 2022Not FixedProblemLinac Commissionning Valeurs des BPM LI et TL_1 surestimees ? 

Ci-jointes des donnees BPM et YAG LI et TL_1, prise le 20/06 puis le 06/10, en fonction de valeurs des steerers 1 (pour LI) et 3 (pour TL)

--> Les valeurs mesurees au BPM ont l'air surestimees d'environ 30%.

Attachment 1: 2022-10-11-BPM-YAG-STR.pdf
  753   Wed May 17 09:16:47 2023 VK, IC. AL Shift summaryRing Commissioning Understanding of the shift in RF frequency 

8:40 Start warming up, problem with PSS. It was restarted.

Problems to start and tune the RF cavity. A clear working procedure and reliable tuning should b defined to optimize the Ring comissioning progress.

Feedback for teh RF has the suspicious behavior. At motor position close to the nominal, the feedback ofsets the motor in the negative direction for 100k steps and then, comes back from negative to the requested position.

Sometimes the we lost the power in the RF cavity.

Start of the ring. RF power is ~10-30 kV and freq = 500.0202 MHz. We loaded the machine with the yesterday's setting.  Optimizattion of the storage and orbit/tune. No stored beam achived. Only a few tens of turns achieved.

We decided to ramp the RF frequency up to 100 kV. We could not tune the RF cqvity to our previous value 500.41. We found the plunger position only for 500.38 MHz, so we started to work on this frequency.

After optimization work, we have achieved the storage (see the figs attached) with a reasonable orbit.

By setting the sextupoles and optimizing the quadrupoles we achived to have the kind of clean storage, stable orbit. 

By injector optimization we reduced the betattron oscilation at the injection. From time to time, the RF section phase ans power should be corrected. The further orbit correction should be done.

The estimated tunes are  (~0.19, ~0.66).

Then, we started to go back to the nominam RF freauency 500.0202 MHz.

Tuning of the cavity. Power is 40 kV.

The difference in orbit is attached in the scrennshot. Then, after the optimization it was almost the same as this morning.

By calculating the FFT on the mixed signal with the scope (see screenshot), we found the following frequency 16.68*30 = 500.4 MHz.

Without RF power, it was not possible to measure the revolution frequency as the FFT had two-peak strucutes, which is complicated to interpratate/understand.

At the nominal frequency, no storage is achieved. We wants to measure the revolution frequency operating at 500.4 MHz. Start of the ramping the power at this frequency. Big problem to tune the RF cavity. We can not inject the power in the cavity.

=> The clear observation that the ring is more stable and the storage is possible with the frequency around 500.4 MHz. it means that the circumference normally is shorter by ~ 10 mm. Investigations arer ongoing.

 

Attachment 1: Screenshot_from_2023-05-17_14-51-18.png
Screenshot_from_2023-05-17_14-51-18.png
Attachment 2: Screenshot_from_2023-05-17_14-49-52.png
Screenshot_from_2023-05-17_14-49-52.png
Attachment 3: Screenshot_from_2023-05-17_14-48-39.png
Screenshot_from_2023-05-17_14-48-39.png
Attachment 4: Screenshot_from_2023-05-17_14-48-16.png
Screenshot_from_2023-05-17_14-48-16.png
Attachment 5: Screenshot_from_2023-05-17_14-47-56.png
Screenshot_from_2023-05-17_14-47-56.png
Attachment 6: Screenshot_from_2023-05-17_14-45-20.png
Screenshot_from_2023-05-17_14-45-20.png
Attachment 7: Screenshot_from_2023-05-17_14-33-57.png
Screenshot_from_2023-05-17_14-33-57.png
Attachment 8: Screenshot_from_2023-05-17_14-39-15.png
Screenshot_from_2023-05-17_14-39-15.png
Attachment 9: Screenshot_from_2023-05-17_14-36-23.png
Screenshot_from_2023-05-17_14-36-23.png
Attachment 10: Screenshot_from_2023-05-17_14-38-07.png
Screenshot_from_2023-05-17_14-38-07.png
Attachment 11: Screenshot_from_2023-05-17_14-30-55.png
Screenshot_from_2023-05-17_14-30-55.png
Attachment 12: anabpmnfirstturns0_17052023.png
anabpmnfirstturns0_17052023.png
Attachment 13: closed_orbit_17052023.png
closed_orbit_17052023.png
Attachment 14: anabpmnfirstturns01_17052023.png
anabpmnfirstturns01_17052023.png
Attachment 15: anabpmnfirstturns02_17052023.png
anabpmnfirstturns02_17052023.png
Attachment 16: Screenshot_from_2023-05-17_15-41-19.png
Screenshot_from_2023-05-17_15-41-19.png
Attachment 17: Screenshot_from_2023-05-17_16-17-01.png
Screenshot_from_2023-05-17_16-17-01.png
Attachment 18: Screenshot_from_2023-05-17_16-31-56.png
Screenshot_from_2023-05-17_16-31-56.png
  706   Mon Mar 6 12:16:31 2023 MJ HG KD VCNot FixedUrgentLinac Commissionning URGENT SST off  

Camera SST inutilisable en debut de shift. IL FAUT ABSOLUMENT ARRETER de faire des trucs sur les cameras entre 2 shifts ! je n'ai pas les competences pour remettre les sst en marche. Les boutons n'y font rien;

Nicolas peux-tu agir pour qu'on puisse commencer le shift. Merci

Force kill force start des servers necessaire pour toutes les cameras (merci Hayg)

phase charge max max foc 331 bpmLI 0.6/1.6

charge 65 pC

energie max -50

scan soleno yag1

passage section phase 110 1.42db
scan soleno yag2 a la main car script ne marche pas : shutter pc ne marche plus  ER/HF/RAC.17-API.DO1/DO14

passage TL phase section 110 1.45db

ihm SST HS : se ferme ou pas selon la camera demandee, selon le sens du vent peut-etre, qui sait ...

Plantage camera --> Force kill force start des servers necessaire pour toutes les cameras

modulateur tombe 14h34

Modulateur ON

Synthe_ring passe de 500 a 500.5MHz --> image 2023-03-06_14-44-27.png

Synthe_ring passe de 500.5MHz  a 500 --> image 2023-03-06_14-49-54.png

pB synchro corrigé

données enregistrées (dans mesure)

connecteur ressere ~ 17h20

donnee PiS BPMTL2 enregistree

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: SST_HS_023-03-06_12-14-40.png
SST_HS_023-03-06_12-14-40.png
Attachment 2: 2023-03-06_14-44-27.png
2023-03-06_14-44-27.png
Attachment 3: 2023-03-06_14-49-54.png
2023-03-06_14-49-54.png
  636   Wed Nov 30 11:44:22 2022 HG/CB/KDUnder ProcessLinacLI | Linac Commissionning Twiss = F(Solé) 

Phase de Q max : 195, on decale de -50 degrés

IRIS :0.7 mm, att  400, charge 100 pC --> laser sauvé, sigma x,y rms 0.21 mm

coil2 betax0 betay0 alphax0 alphay 0

variation du coil 2 de 160A à 200A. On s'attarde sur le cas 200A pour lequel un halo est présent necessitant d'affiner l'analyse de l'image

15h20 modulateur tombé

valeurs sauvées dans le fichier excell

point 208A 1.3/1.5

on passe à 355 d'atténuateur, iris 1.3 (0.3 rms)

on refait la mesure (208Ac) - attention NB cann un peu désapdaté

Prendre ce point de t^te de ligne demain

208A sur le coil2

 

 

 

 

 

 

 

 

 

  Draft   Fri Sep 17 09:12:29 2021 Entered by mohamed el khaldi from 134.158.76.146 on Fri Sep 17 09:12:06 2021FixedAnneau  Tuning des HOM's de la cavité RF anneau en stand by aprés les coupures d'électricité  

le tuning automatique des HOM's de la cavité RF anneau fonctionnait bien avant les coupures d'éléctricité.

à mon retour des vacances je voulais reprendre les tests mais en vain

deux hypothéses se présentent:

1/ soit le hardware (carte redpitaya) est en panne ( la fonction de conversion analogique-numérique n'est plus possible) : nous voulons vérifier le hardware mais les tests devraient se faire sous Tango ==> besoin d'assistance de CC

NB:  meme si on veut utiliser une carte spare pour vérifier,  on a un souci il faut que la carte spare soit configurée avec une adresse IP qui dépend de son adresse MAC  ( faire le ticket ==> il faut prévoir min une semaine pour avoir une adresse IP) ==> solution soit anticiper la configuration des spares sous le réseau bien avant  sinon on perd beaucoup de temps pour ces manips qui pourraient se résoudre en une heure) ou proposer une  autre solution (adresse IP doit etre attribué automatiquement au composant possédant une adresse MAC)

2/ soit problème de Software (DS carte redpitaya: ER/RF/RAC.14-ELR.01-RDP.01) ==> le DS met 0 v sur la lecture (channel "A" indique toujours 0 V) même si la tension à la sortie de comparetur de phase varie ===> besoin d'assitance de CC

je vais faire un ticket espérant une intervention rapide

  172   Fri Nov 19 09:24:41 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Fri Nov 19 09:24:11 2021 UrgentInfra Trou dangereux !!! 

Ce matin en verifiant les orientations des jauges dans l'anneau pour faire des simulations correcte j'ai du entrer dans l'anneau.

En resortant je suis pris les pieds dans le trou sous l'escalier (cf photo) et j'ai failli tomber !!!

Ce trou est extrement dangereur car dans le passage a un endroit ou l'on voit dificilement nos pied. Il faudrait le reboucher le plus vite possible pour éviter un accident.

Attachment 1: trou_escalier_anneau.jpg
trou_escalier_anneau.jpg
  889   Tue Jul 23 17:43:23 2024 MJ LinacLI Trends - conditionnement section 23 juillet 

Je viens de sauvegarder les trends conditionnement d'aujourd hui dans data/shared du jour

  107   Mon Oct 11 13:46:11 2021 Entered by Super Team from 134.158.195.142 on Mon Oct 11 13:45:53 2021Under ProcessOtherLinac Commissionning Travaux 

Travaux en cours à l'extérieur, le goudron sur le chemin a été enlevé, une pelleteuse bloque le passage vers ThomX, le passage est possible mais difficile

  403   Thu Mar 17 15:27:35 2022 Entered by HG/JNC/SC from 134.158.195.142 on Thu Mar 17 15:27:21 2022Under ProcessLinacLinac Commissionning Transport faisceau 

Modulateur en marche

Transport faisceau jusqu'à TL/DG/SST.01 

Charge = 55 pC, Energie laser non mesurée aujourd'hui

Image laser :

Scan charge phase de ce matin :

Transport faisceau jusqu'à TL/DG/SST.01 , transmission de la charge plutôt bonne jusqu'après la section

Etude ecran / BPMs

 

 

  182   Thu Nov 25 10:52:26 2021 Entered by Super Team from 134.158.195.142 on Thu Nov 25 10:52:12 2021Under ProcessLinacLinac Commissionning Transport 

Optimisation charge et transport. Charge 100 pC ok.

Optimisation phase canon faite

Optimisation phase section en cours

  778   Mon Jun 26 09:27:46 2023 ND, LSNew SolutionShift summaryDiag ThomX operations 26/6 

9:26 Mise en chauffe

9:40 Cycling the magnets

11:45 Beam ON

12:23 Study signal in FC

WAC2 delay:  -6.15us

WAC3 delay: -6.45us

12:30 Prise image TL/FC.01

12:45 Difficultés allumage kicker extraction

13h45 Trasnport dans EL jusqu'à l'écran

14h33 Visualisation du signal dans EL/FC.01 => changement retard synchro sur WAC3

17h15 Arret Machine

  814   Fri Nov 3 10:02:49 2023 Entered by Super Team from 134.158.195.141 on Fri Nov 3 10:02:34 2023 ProblemLI ThomX aujourd'hui 

10h02 : ce matin intervention de Dalkia, coupure de la ventilation, signal sonore en salle de controle, affichage debit ventilation insuffisant.

Remise en route à 11h ?

Problème laser pompe qui ne s'allume pas, Viktor investigue.

Aujourd'hui, livraison du laser de PERLE, ouverture des portes pour le rentrer dans l'igloo, heure de livraison non connue.

Pas de faisceau aujourd'hui

10h30 : tentative de redemarrage des DSs des cameras : impossible de redemarrer le server via astor ou via healthcheck, error server camera sur toutes les cameras sauf TL/DG/SST.01 (cf image)

Meme probleme sur camera laser

11h30 Camera laser en route, problème résolu (cf image) merci Philippe.

13h09 L'ampli Laser ne démarre pas (cf message Viktor), debit ventilation toujours insuffisant.

13h50 Retour de Dalkia pour remise en route de la ventilation, demande de leur hiérarchie de couper la ventilation pour cause de coupure électrique. Probablement une erreur.

14h15 Mise en chauffe modulateur pour tests RFs, mise en route frigo et chillers

Tests de certains IHMs et DSs associés :

Refroidissement + Chillers : ok

Modulateur : HT = 1090V, trig ok

Alimentations : LI + TL ok sans les dipoles

Caméras LI/TL + moteurs : ok

Pas d'acces à ThomX script pour la fermeture de la machine (probablement un redémarrage est nécessaire)

 

Résumé :

Uniquement courant obscurité ce jour

L'ampli laser ne fonctionne pas : demande envoyée à Amplitude

Les DSs testés fonctionnent sur la partie Linac

ThomX script ne s'ouvre pas

Tests en charge de l'igloo lundi (8h30/9h)

 

 

 

 

Attachment 1: erreur_server_images.png
erreur_server_images.png
Attachment 2: image_cameras_ok.png
image_cameras_ok.png
ELOG V3.1.4-395e101