  937   Tue Oct 8 09:05:34 2024 ND, VC, HG, SC, MEK, VK, VMUnder ProcessShift summaryLI | TL | LE | Ring Shift summary 8/10/2024 

9:10 Maher a redemarre l'ordinateur du modulateur

9:15 Cyclage des aimants

Le cyclage de RI-C1/PS/QP.05 a echoue a 10A.

10h00 Le menage est passe en salle de controle

10h20 Beam ON

11h04 Faisceau dans l'anneau. La recette marche tres bien.

Hayg cherche tres attentivement les bumps...

Bumps observes toutes les 2-3 minutes

11h13 Moteurs soleinoides eteints

11h23 Bump

11h50 TL/PS/DP.01 Eteind

Les bumps continuent.

12h05 Passage en config linac

Verification que ce n'est pas correle avec l 'attenuation de TL/DG/BPM.01

12h24 Tous les aimants de la TL sont eteinds

12h26 bump

12h36 LI/PS/STR.02 Eteind

Tout petit bump a 12h41

12h41 Rallumage de LI/PS/STR.02 avec valeurs a 0.

Tout petit bump a 12h47

12h51 Recharge de la recette good_20240926_14_21_46 avec seulement LI allume

12h55 Gros bump...

Hypothese: soit les bump sont lies au courant dans LI/PS/STR.02  soit a la charge transmise par la section via un effet thermique...

12h58 deuxieme gros bump

13:00 Pour reduire la charge on met l'attenuateur laser a 300mm.

Petit bump a 13h05, et 13h11

13h12 on remet l'attenuateur a 370mm.

Gros bump a 13h17.

Cela semble confirmer l'hypothese d'une correlation entre l'amplitude des bumps et la osition de l'attenuateur laser (ie charge).

La frequence reste moins elevee (1 toutes les 5 minutes contre 1 toutes les 2 minutes ce matin).

13:35 Start all magnets

13:45 Changment operateur: VK et VM.

 

 

 

 

 

 

 

 

 

 

Attachment 1: Screenshot_from_2024-10-08_12-47-47.png
Screenshot_from_2024-10-08_12-47-47.png
Attachment 2: Screenshot_from_2024-10-08_13-12-49.png
Screenshot_from_2024-10-08_13-12-49.png
Attachment 3: Screenshot_from_2024-10-08_13-25-19.png
Screenshot_from_2024-10-08_13-25-19.png
  938   Tue Oct 8 15:29:17 2024 VC MJ HG JNUnder ProcessShift summaryLinac Commissionning Shift summary 

Pas de charge (20 pC Q max)  car shutter PSS orange

Apres plus de 30 minutes : shutter vert enfin ...

charge canon 105 pC
Charge transmise 120 pC

 

influence de Li str2 sur les bump après la section

Premier test avec
    str2 à zéro mais allumé
    str1 H -2.5 V 0.62
Il n'y a plus que de petits sauts sur bpmTL1 (~ 0.1 mm)  cf screenshot
   yagTL1     490 / 318
   bpmTL1   1.81 / -1.19

17h32 avec Align QUADS (screenshot kicks)

   YagTL1 365 / 274
   bpmTL1 0.07 / 0.02

   YagTL1 326 / 247
   bpmTL1 -0.04 / 0.34

   YagTL1 368 / 230
   bpmTL1 0.60 / 0.70

   YagLI faisceau pas sur l'ecran
   bpmLI 4.23 / -1.12

18h15 avec Align section + str3V = -5 (screenshot kicks)

   YagTL1 274 / 115
   bpmTL1 -0.87/ 2.96

   YagTL1 261 / 137
   bpmTL1 -1.16 / 2.51

   YagLI faisceau pas sur l'ecran
   bpmLI 4.73 / -2.77

18h35 Acces casemate avec JN pour mettre un fil de masse entre les brides ICT1 pour le courcicuiter

19h appel Maher car la ronde est cassee (sans doute un arret d'urgence appuye sans s en rendre compte). Merci Maher !!!

19h25 Reprise de l'etude kicks faisceau

La tresse de massse sur ICT ne change rien aux kicks (screenshot)

Steerers 20h02
     H1=-1.04   V1=0.10  H2=-0.82  V2=0.66
     Faisceau sur yagtl1 (screenshot)
     Bpmtl1 presque plus de kicks en horizontal - kicks en vertical toujours presents (screenshot)
     bpmLI 0.17 / 1.52
     yagTL 596 / 303
     bpmTL 3.61 / 0.01

Steerers 20h25 : j'essaie de diminuer encore les str horizontaux
     H1=-0.54  V1=0.10  H2=-0.52  V2=0.66  + STRLI_H = -10 pour que le faisceau reste sur le yagTL1
      bpmLI 0.8 / 1.53
     yagTL 628 / 269
     bpmTL 5.48 / 0.73

yagLI 404 / 211

20h50 fin de shift

Attachment 1: bpmTL1_str2_0_str1_H-2.5_V0.62.png
bpmTL1_str2_0_str1_H-2.5_V0.62.png
Attachment 2: bpmtl1_alignQUADs.png
bpmtl1_alignQUADs.png
Attachment 3: bpmtl1_align_SECTION.png
bpmtl1_align_SECTION.png
Attachment 4: bpmtl1_align_SECTION_masseICT.png
bpmtl1_align_SECTION_masseICT.png
Attachment 5: yagtl1_str_20h02.png
yagtl1_str_20h02.png
Attachment 6: bpmtl1_str_20h02.png
bpmtl1_str_20h02.png
Attachment 7: bpmtl1_str_20h25.png
bpmtl1_str_20h25.png
  939   Wed Oct 9 08:04:20 2024 shift teamUnder ProcessShift summaryLinac Commissionning Production de rayons X 

demarrage machine 8h
11h: modulateur passe sur "OFF" sans raison apparente.
12h: faisceau en route 

 

Programme :

* injection faisceau dans l'anneau 

    Phase canon charge max (86°)
    Energie Max (36°) avec 100pC

     -  On essaye d'optimiser l'injection et le stockage car le stockage n'est pas "bon" beaucoup de perte

* Stockage puissance Laser

* Recherche des rayons-X en phase (500MHz, 33MHz)

      -  Pas de rayons-X visible à première vue. On bouge la table hexapode pour trouve le faisceau

      - On scan la table Optique en vertical (en mode désynchro). On trouve les rayonsX vers -1.85mm en Z

      - On essaye de synchroniser

Phase 500MHz (ER/CA/RAC.05-API.AO1/A06), 6.2V

Phase 33MHz 265°

Delay scope Laser/Trig : 1.25ns

On fait un scan vertical de la table en désynchronisé (impossible en synchrone)  

(~80 pC injecté et ~ 83kW dans la cavité)

* Mesure flux, stabilité spectre des rayons-X

Le flux est assez instable à cause de la machine et ou des jitters de synchronisation (on mesure ~ 0.6-0.7 10^10 ph/s : 15 - 20 10^4 pA)

 

Vers 18h :
   La charge est devenue tres instable vers 18h car le feedback ne fonctionnait plus (etait coché pourtant). On l'a redémarré. Stabilité charge revenue apres.
   Idem TBT sum trend plus stable après.

 

Attachment 1: Scan_vertical_recherche_rayonsX.png
Scan_vertical_recherche_rayonsX.png
Attachment 2: Synchronized_Xray.png
Synchronized_Xray.png
Attachment 3: tbtsum_trend_all.png
tbtsum_trend_all.png
Attachment 4: charge_18h.png
charge_18h.png
  940   Tue Oct 22 09:06:50 2024 KD, ND,VCUnder ProcessShift summaryDiag | Linac Commissionning shift du 22 octobre 2024 

9h: mise en chauffe (Klystron, refroidissement, laser)

==> problème Vide (vide8)

==> Problème phase shifter Laser PC (on redémarre le boîtier)

==> la synchro saute à cause des phases : on réajuste le rigole +10° :

Phase voie 1 : 120°

Phase voie 2 : 265°

13h15: intelock vide 8

17h15: arrete machine, acces casemate pour la CFP

 

 

**** Programme ****

- Mise en place du MRSV (vision caméra)

11h le MRSV est en place avec un premier alignement à tester en faisceau. 

- Mesure de l'influence sur les sautes de l'alignement Laser/cathode, de la charge, et alignement Linac

12h: Alignement1 on charge la recette good_20241009_17_38_49

- Quads (courant nominal QP1, QP2, QP3) : -0.08 A, 3.4 A, -3.4 A

- section non tunée

- charge ~ 100pC

LI/STR1 : [H,V] = [2.16,-1.7]

LI/STR2 : [H,V] = [-3.83, 2.20]

==> cf. data Alignement1: saute de 1.4mm en Y et 0.6mm en X en 30min

13h: Alignement2 On règle la section (dispersion min, et énergie tel qu'à 159.3 on soit au centre du BPM/TL2)

==> cf. data Alignement2: saute de 1.2mm en Y et 0.7mm en X en 30min

13h45 charge 50pC
==> cf. data Alignement3: saute de 0.6mm en Y et 0.7mm en X en 30min

réajustement phase canon EmaX et att + phase section

14h52 charge 120pC
==> cf. data Alignement4: saute de 0.6mm en Y et 0.7mm en X en 30min

les sautes cotes linac TL/BPM01 sont visibles mais très atténuées sur  TL/BPM02 (quad 4=0)

 15h40 test action steerer tl1 sur BPM TL1 et 2  (saut de 600µm sur avec steerer 15h42 sur BPM1 et à 15h43 le saut de 600µm est bump)

saut sterrer visible sur BPM2 pas le bump!!!

TEST  1  on prend un trend de la position du faisceau sur YAG TL01 en parrallèle avec TL/BPM01

==> les sautes sont visible sur l'écran: 0.8mm/10pixels

TEST 2 on fait des jumps de la pos laser sur la cathod de 0.1mm (saut 16h30 bump 16h31)

==> déplacement legerement visible sur TL/BPM2, ratio BPM1/BPM2 (0.5mm/0.05mm)

TEST 3 on fait des jumps sur les steerers LI V 1 et 2 (+- .1A à V1 16h41   V2 16h43)

==> saute visible sur les 2 BPM ratio BPM1/BPM2 STR1 : 0.5mm/1mm et STR2: 0.8mm/0.5mm

TEST pompe : on arrete les 2 pompes ioniques LI/VA/PP.05 et LI/VA/PP.06 à 16h58, on les remet à 17h10

==> difficilement quantifiable, il reste des sautes.

 

==> Conclusion sur les différents tests :

* Les sautes ne sont pas visible sur TL/BPM.02 mais visible sur TL/SST1

* Ce n'est pas un artéfacte de mesures de TL/BPM.01

* Il semblerait qu'il y ai un plan image du TL/BPM2

* Le plan image serait autour de LI/STR.02 ou de la cathode. ==> un déplacement laser ?

 

- Mesure performance alignements : Quad courrants initials, Quad courrants nuls, section ? 

Attachment 1: Screenshot_2024-10-22_12-49-54_alignement1.png
Screenshot_2024-10-22_12-49-54_alignement1.png
Attachment 2: Screenshot_2024-10-22_13-40-08_alignement2.png
Screenshot_2024-10-22_13-40-08_alignement2.png
Attachment 3: Screenshot_from_2024-10-22_14-21-12_alignement3.png
Screenshot_from_2024-10-22_14-21-12_alignement3.png
Attachment 4: Screenshot_2024-10-22_16-22-04_BPM1_TL_test1.png
Screenshot_2024-10-22_16-22-04_BPM1_TL_test1.png
Attachment 5: Screenshot_2024-10-22_16-20-33_YAG_TL1_test1.png
Screenshot_2024-10-22_16-20-33_YAG_TL1_test1.png
Attachment 6: Screenshot_2024-10-22_16-33-19_BPM1_TL_test2.png
Screenshot_2024-10-22_16-33-19_BPM1_TL_test2.png
Attachment 7: Screenshot_from_2024-10-22_16-32-56_TL_BPM02_test2.png
Screenshot_from_2024-10-22_16-32-56_TL_BPM02_test2.png
Attachment 8: Screenshot_2024-10-22_16-44-21_BPM1_test3.png
Screenshot_2024-10-22_16-44-21_BPM1_test3.png
Attachment 9: Screenshot_from_2024-10-22_16-55-46_TLBPM2_TEST3.png
Screenshot_from_2024-10-22_16-55-46_TLBPM2_TEST3.png
Attachment 10: Screenshot_2024-10-22_17-14-28_test_pompe.png
Screenshot_2024-10-22_17-14-28_test_pompe.png
  941   Wed Oct 23 08:15:09 2024 KDUnder ProcessShift summaryLinac Commissionning shift du 23 octobre 2024 

8h15: mise en chauffe de la machine (en remote)

11H HT ON! recette goog_20241009_17_38_49

Phase E max : 61° Q 85pC

12h15: test canon fini (le canon semble conditionné et ne claque pratiquement plus)

 

**** Programme ****

- Verifier la dépendance de la position du courant d'obscurité à l'énergie canon 

On baisse l'atténuateur à 0dB. image à 0.5 et à 0dB

Il ne semble pas y avoir de mouvement du barycentre en fonction de l'énergie. 

- aller à 0dB d'attenuation

Fais, il y a quelque claquage, on laisse conditionné gentillement. à 0dB l'énergie est de 5.3MeV (kinétique), 5.8 MeV totale

 

Attachment 1: bary_11h59.png
bary_11h59.png
Attachment 2: 2024-10-23_11_25_24_li_dg_sst_01-ccd_01_RAW.png
2024-10-23_11_25_24_li_dg_sst_01-ccd_01_RAW.png
Attachment 3: 2024-10-23_11_45_23_li_dg_sst_01-ccd_01_RAW.png
2024-10-23_11_45_23_li_dg_sst_01-ccd_01_RAW.png
  942   Wed Oct 23 17:30:58 2024 Entered by Super Team from 134.158.195.141 on Wed Oct 23 17:27:14 2024Under ProcessShift summaryLinac Commissionning   

Gun phase 50 dg., At 0.5 dB; Sect phase 230 dg. At 2.65 dB; Sol. 220 A, Gun charge -131 pC, Linac -112 pC, TL  -120 pC.

Linac steerers: H [2.2 -3.83], V [-1.46 2.1].

It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. 

It was atempt to measure dispersion xith TL/BPM2 and the section attenuator. See figure. It is unpossible  to check TL/BPM2 with the TL/SST.02 camera because a lot of bright spots on the image.

17h50 end of the shift.

Attachment 1: DispersionTLBPM2.png
DispersionTLBPM2.png
  943   Thu Oct 24 07:15:40 2024 KD, VMUnder ProcessShift summaryLinac Commissionning shift du 24 octobre 2024 

7h15: mise en chauffe machine (modulateur, laser, refroidissement, cyclage), en remote

Gun Att. = 0.0 dB, Phase=47 dg., Sect. Att. = 2.555 dB, Phase = 206 dg.

Gun Charge -130pC

Linac steerers H [1.94 -4.0]; V [-1.83 2.25] to  align with QP1 - QP3

RCDS script: /tmp_mnt/data/shared/commissioning_scripts/Ring/Injection_Scans/First_Turns/RCDS/study_RCDS/scan_RCDS500_7Operateur.m

Beam injected to the ring W/O RF. Recipe all_20241024_11_16_58 see screenshots.

Dispersion measurement with Attenuator

About 13h50 beam ustable at TL/BPM04. X position correlates with vertical position at TL/BPM02

14h22 modulator on Standby

A PERLE delivery occured in the afternoon. The entrance door is no longer working...
17h10: Modulator on trig: No RF signal!

Laser position is jittering a lot... Fixed by openinng/closing the gate

Still no RF signal on RF plot...

17h30 Stop ThomX

 

 

 

Attachment 1: TbTSumW_O_RFScreenshot_from_2024-10-24_13-18-57.png
TbTSumW_O_RFScreenshot_from_2024-10-24_13-18-57.png
Attachment 2: Osc_W_O_RFScreenshot_from_2024-10-24_13-21-59.png
Osc_W_O_RFScreenshot_from_2024-10-24_13-21-59.png
Attachment 3: Orbit_WO_RF_TLBPM2plus4mmScreenshotFrom2024-10-24_13-25-15.png
Orbit_WO_RF_TLBPM2plus4mmScreenshotFrom2024-10-24_13-25-15.png
Attachment 4: DispersionTLBPM2.png
DispersionTLBPM2.png
Attachment 5: UnstableTLBPM4Screenshot_from_2024-10-24_14-09-07.png
UnstableTLBPM4Screenshot_from_2024-10-24_14-09-07.png
  945   Fri Oct 25 14:44:05 2024 ND, Manon Philit, Janine IssaUnder ProcessShift summaryLI Shift summary 25/10 

9 : 34 Mise en chauffe

Health check OK (a part les Redpitaya)

10:25 démarrage faisceau

modulateur ne veut pas passer en HV

11:00 Problème résolu en mettant la tension à 800 V puis ne montant progressivement

11:11 Scan charge vs RF phase

11:24 Chargement recette LI_TL_straight_good_20240926_14_21_46

Faisceau observé en bout de LINAC

11:40 Chargement TL_good_20240926_14_21_58

Faisceau sur TL/SST.02, phase section 197deg, TL/DP01=159.30

Faisceau centré sur TL/SST.02 pour att=2.7dB

Monte en energie:

att=2.4dB DP01=167.3 phase=200deg

att=2dB DP01=178.4 phase=202deg

att=1.5dB DP01=196.2 phqse=206deg

att=1dB DP01=218.7 phase=213deg

12:30 stqnd by

13:55 redemarrage

att=2.5dB DP01=162.9 phase=197deg

att=2.25dB DP01=171.50 phase=198deg

att=2dB DP01=179.1 phase=202deg

att=1.75dB DP01=186.8 phase=204deg

att=1.50dB DP01=197.2 phase=206deg

att=1.25dB DP01=208 phase=209deg

att=1.235 dB DP01=210 phase=209deg

att=1 dB DP01=219.5 phase=213deg

att=0.75 dB DP01=233 phase=216deg

14:30 modulator status 12

att=0.5 dB DP01=247.7 phase=220deg

att=0.36 dB DP01=256 phase=225deg

att=0.25 dB DP01=260.3 phase=227 deg

15:24 pour voir le faisceau sur TL/SST.03 il faut mettre l attenuation a 0.47dB

15:42 on ajuste la charge a 100pc

15:45 on eteind le dipole

TL/QP01 = -0.18A

TL/QP02 = 3.40A

TL/QP03 = -3.40 A

16:00 Mesures SPR

16:11 modulator status 12

16:29 modulator status 12

16h36 Scan de QP3 a 70MeV

16h41 Scan de QP3 a 61.5MeV

16h51 Scan de QP3 a 50MeV

17h07 Standby

=> Operateur KD

 

 

 

 

Attachment 1: 2024-10-25_12_25_26_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.png
2024-10-25_12_25_26_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.png
Attachment 2: scan_2024_10_25_16_36.png
scan_2024_10_25_16_36.png
Attachment 3: scan_2024_10_25_16_41.png
scan_2024_10_25_16_41.png
Attachment 4: scan_2024_10_25_16_51.png
scan_2024_10_25_16_51.png
  946   Fri Oct 25 18:07:48 2024 KDUnder ProcessShift summaryLinac Commissionning performance estimation alignement QP 

On aligne dans QP1 et QP3 et on regarde pour une variation de +- 1A la derive sur TL/BPM.01

valeur nominal QP1-QP3 (0.1A, 3.4A, -3.4A)

autour de QP1-QP3 à 0 pour l'alignement :

     * valeur nominal BPM initale (0.3mm, -0.3mm)

     * QP3 +1A : (0.3mm, -0.1mm)

     * QP3 -1A : (0.5mm, 0mm)

     * QP1 +1A : (0.4mm, -0.1mm)

     * QP1 -1A : (0.3mm, -0.2mm)

     * valeur nominal BPM finale (0.3mm, -0.2mm)

autour de QP1-QP3 à aux valeurs nominales pour l'alignement :

     * valeur nominal BPM initale (0.4mm, 0mm)

     * QP3 +1A : (0.3mm, 0mm)

     * QP3 -1A : (0.4mm, 0mm)

     * QP1 +1A : (0.4mm, 0.mm)

     * QP1 -1A : (0.3mm, -0.1mm)

     * valeur nominal BPM finale (0.3mm, -0.1mm)

*** We go to the ring ***

No Steerer and we can transport to the ring. Alignement used : QP1-QP3 @nominale current

==> no  loss of charge. 

==> good beam on last screen

==> I suggest to used this alignement : saved in recipe "all_20241025_19_18_14"

==> with steering impossible to enter in the ring when at 0 on TL/BPM.03 and TL/BPM.04 (on axis beam). Why ? Ring configuration ? Kick from Ring magnets or EP ? Especially in vertical.

==> by setting the nominal current on the steererqs (of TL) we can inject in the ring. The 2 alignement of QP1 - QP3 seems to be close enougth.

 

*** Scan coil Vs beam dim at TL/SST1

==> see figure and data

20h40: stop machine

 

Attachment 1: 2024-10-25_19_18_27_tl_dg_sst_03-ccd_01_RAW.png
2024-10-25_19_18_27_tl_dg_sst_03-ccd_01_RAW.png
Attachment 2: Screenshot_2024-10-25_19-19-29_BPM.png
Screenshot_2024-10-25_19-19-29_BPM.png
Attachment 3: Screenshot_2024-10-25_19-20-50_charge.png
Screenshot_2024-10-25_19-20-50_charge.png
Attachment 4: Screenshot_2024-10-25_19-21-27_steerer.png
Screenshot_2024-10-25_19-21-27_steerer.png
Attachment 5: Screenshot_2024-10-25_19-20-50_charge.png
Screenshot_2024-10-25_19-20-50_charge.png
Attachment 6: charge_VS_coil_20h35.png
charge_VS_coil_20h35.png
Attachment 7: dim_VS_coil_20h35.png
dim_VS_coil_20h35.png
  947   Mon Oct 28 18:56:01 2024 KD, HGUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 28 octobre 2024 

17h: faisceau machine.

** On fait un scan de TL/STR1 avec QP1 à QP4 à 0, faisceau aligné (QP1-QP3) coil afin d'avoir un faisceau sur l'écran TL/SST2 "focalisé". 

==> MadX prévoit un couplage de 0.3mm sur Yag pour 1mm de déplacement en entrée dipole, code Matlab prévoit 4.5mm sur Yag pour 1mm de déplacement en entrée dipole

==> la courbe montre position TL/BPM01 (avant dipole) et position sur TL/SST.02 (après dipole)

** On injecte avec recette canon 0dB et recette canon 0.5dB meme performance avec meme paramètres BPM (2E-6 tbtsum pour 0dB et 1.5E-6 pour 0.5dB). 

On mets RiC1/BPM01 et 02 en gain automatique, tbtsum retrouve des niveau "correte" quelques 1E-7. (on désactive le gain auto après)

** on est dans l'anneau avec un "bon stockage" canon 0dB ==> à affiner : recette dans "all_20241028_19_19_52"

 

19h42: arret machine

 

Attachment 1: scan_TL_STR1_VS_TL_YAG2.png
scan_TL_STR1_VS_TL_YAG2.png
Attachment 2: Screenshot_2024-10-28_19-40-50_BPM_ring.png
Screenshot_2024-10-28_19-40-50_BPM_ring.png
  951   Thu Oct 31 08:19:25 2024 KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024Under ProcessShift summaryRing Commissioning shift du 31 octobre 2024 

8h15: mise en chauffe en remote (modulateur, laser, chiller, Cycling)

Tuning of the linac and injection to the ring

Goal: Search for the non-dispersive orbit and proper RF frequency

We started from F =500.059 MHz

Frequency change from 500.05 to 500.0853 MHz

We stopped at 500.0853 MHz and proceeded with the orbit correction

3 steereres are at max values. Studies continue to understand the other possibilities of corection.

18h Stop ThomX

 

Attachment 1: Screenshot_from_2024-10-31_13-37-11.png
Screenshot_from_2024-10-31_13-37-11.png
Attachment 2: Screenshot_from_2024-10-31_12-07-13.png
Screenshot_from_2024-10-31_12-07-13.png
Attachment 3: closed_orbit_31102024.png
closed_orbit_31102024.png
  952   Tue Nov 5 10:09:35 2024 SC VCUnder ProcessShift summaryLinac Commissionning shift linac 

demarrage modulateur 9H
erreur vanne acquitée
10H intervention Viktor sur le laser PC

alignement laser en cours => pB de passage dans atténuateur (at least)

il faudra vérifier le point de référence alignement faisceau dans COL2 par rapport à la position 

11h15 machine éteinte

priorité à Viktor pour alignement du laser PC;;; aujourd'hui et demain si nécessaire

 

dossier :  /data/shared/Trend_scripts
changer environement : opt
choisir le script : ./trend.sh "nom script"


 

 

  954   Wed Nov 6 08:06:51 2024 VC MJUnder ProcessShift summaryLinac Commissionning shift  

demarrage chauffage 8h
autorisation PSS zone modulateur  interdite => il faut venir valider la zone
PB MPS  appel nourredine
plus les bouton mode de tir (solution mode expert/tir/forçage choix tir) 
acquitement defaut vide:  (solution mode expert /vide/validation)
pb MPS regle
shutter orange - on laisse refroidir 10 min - shutter vert

camera laser a bouge le  point cathode est perdu

phase ch max = 58
charge = 180 pC avec att laser = 320

Essai de Realignement point cathode

Script alignement_photocathode_BPM (phase_max -5) --> va completement dans le decor (pos x=21 et posy=-6 !!) ... cf screenshot signal BPMLI
Je relance le script en partant d'une autre position depart pour M4 (13h56)
script arreté à  pos (pos x=31 et posy=-17 !!)

Viktor réaligne le laser PC sur les références physiques 
M4.01 (Cathode H) 470
M4.02 (Cathode V) 5488

On retroouve le faisceau sur YAGLI pour
M4.01 (Cathode H) 800
M4.02 (Cathode V) 5120
Mais le faisceau n'est plus sur la camera
Viktor acces casemate pour rerentrer le faisceau image laser sur la camera UV avec les miroirs de renvoie (16h19)

on regle à la main alignement laser sur cathode
optimisation sur BPM
M4.01 (Cathode H) 880
M4.02 (Cathode V) 5133

réaligneent avec script BPM

pos asservissement 
H iris pos 6.33 mm (855)
V iris pos 3.56 mm (5133)

Point cathode realigne pour prochain shift 

Prise de donnees rapide a la fin (note sur une feuille papier pour l'instant)

(Une belle journee de mer ...)

 

 

 

 

 

 

 

Attachment 1: BPMLI_align_photocathode_13h15.png
BPMLI_align_photocathode_13h15.png
Attachment 2: BPMLI_align_photocathode_13h56.png
BPMLI_align_photocathode_13h56.png
Attachment 3: Laser_sur_cameraUV_16h19.png
Laser_sur_cameraUV_16h19.png
  955   Thu Nov 7 08:53:22 2024 IC, VK, VM, JNUnder ProcessShift summaryRing   

8h50 Start of the modumator and all subsystems

PC client 1 was frozen => we restarted

10h20 HV on 1215 V

RF gun phase 28 dg., Att. 0.0 dB, Charge -106 pC

The beam shape at screen TL/DG/SST.01 is very strange. Big change. Try to allign the QP1 QP3

Steerers: H [2.48 -4.46]; V [-1.86 2.29]

Section Att. 2.77 dB, Phase 208,  TL/BPM2 X= 0.1

11h45 Ring injection. Ri-c2/ps/str.06-h.01 and   Ri-c2/ps/str.06-v.01 tango servers were off

12h59 Measure Beem energy with TL Steerer: 53.2 MeV (screenshot), TL/BPPM2 X about zero.

12h53 Start ring RF

14h0 Section chiller 'off' (unknown reason), Energy start to drop . Switch to 'on'.

15h27 Modulator on Standby

16h30 HV on.

16h37 Modulator 'off' voluntary. Unknown reason.

17h55 HV 'on' 1215 V, Section Phase 217, -125 pC

18h30 'access controle' to install shunt resistances of 33 Ohm at four magnets (close placed).

18h55 HV 'on' 1215 V, Section Phase 217, -125 pC

Orbit at straight sections goes down on 2 mm.

19h13 Stop ThomX

 

 

 

Attachment 1: Screenshot_from_2024-11-07_10-57-55.png
Screenshot_from_2024-11-07_10-57-55.png
Attachment 2: TL_SST1_QP1QP3ZeroScreenshot_from_2024-11-07_10-58-30.png
TL_SST1_QP1QP3ZeroScreenshot_from_2024-11-07_10-58-30.png
Attachment 3: TLSST1QP1QP3onScreenshot_from_2024-11-07_11-00-47.png
TLSST1QP1QP3onScreenshot_from_2024-11-07_11-00-47.png
Attachment 4: Screenshot_from_2024-11-07_19-09-59.png
Screenshot_from_2024-11-07_19-09-59.png
Attachment 5: Screenshot_from_2024-11-07_19-01-44.png
Screenshot_from_2024-11-07_19-01-44.png
Attachment 6: Screenshot_from_2024-11-07_18-56-43.png
Screenshot_from_2024-11-07_18-56-43.png
  956   Fri Nov 8 09:35:41 2024 IC, VK, JNUnder ProcessShift summaryRing ring studies 

8h50 Start of the modumator and all subsystems

Beam studies.

Orbit Correction.

 

Transport only with dipoles -  turn at 161.4A

Frequency from 500.0853 change to 500.0913

Tries BBA

 

16h12 Problem with sudden change of params.

Recepies did nopt store corrected orbit: due to erro in EL steerer.

 

In continuation to yesterday study Jean Noel soldered in parallel 33 ohm : effect on orbit visible . Need to find correct shunt resistance (temperature) and power > 10 W.

Power supply does not show any sign of problem.

 

 

 

 

 

 

 

 

18.40 End of shift

Attachment 1: scan_charge_phase_min_0.0_max_360.0_10_11_13.png
scan_charge_phase_min_0.0_max_360.0_10_11_13.png
Attachment 2: Screenshot_from_2024-11-08_12-01-54.png
Screenshot_from_2024-11-08_12-01-54.png
Attachment 3: Screenshot_from_2024-11-08_12-10-59.png
Screenshot_from_2024-11-08_12-10-59.png
Attachment 4: Screenshot_from_2024-11-08_12-31-24.png
Screenshot_from_2024-11-08_12-31-24.png
Attachment 5: Screenshot_from_2024-11-08_12-31-48.png
Screenshot_from_2024-11-08_12-31-48.png
Attachment 6: Screenshot_from_2024-11-08_12-38-19.png
Screenshot_from_2024-11-08_12-38-19.png
Attachment 7: Screenshot_from_2024-11-08_12-42-58.png
Screenshot_from_2024-11-08_12-42-58.png
Attachment 8: Screenshot_from_2024-11-08_13-16-14.png
Screenshot_from_2024-11-08_13-16-14.png
Attachment 9: Screenshot_from_2024-11-08_13-49-36.png
Screenshot_from_2024-11-08_13-49-36.png
Attachment 10: Screenshot_from_2024-11-08_14-34-45.png
Screenshot_from_2024-11-08_14-34-45.png
Attachment 11: Screenshot_from_2024-11-08_16-12-07.png
Screenshot_from_2024-11-08_16-12-07.png
Attachment 12: Screenshot_from_2024-11-08_18-26-43.png
Screenshot_from_2024-11-08_18-26-43.png
Attachment 13: withWORF5000913Screenshot_from_2024-11-08_12-11-51.png
withWORF5000913Screenshot_from_2024-11-08_12-11-51.png
  957   Tue Nov 12 08:12:06 2024 MJ KD VCUnder ProcessShift summaryLinac Commissionning shift du 12 novembre 2024 

8h10 : mise en chauffe en remote (modulateur, laser, chillers).

redemarrage serveur camera UV
vide canon à sauté
Arret synchro (Dialkia a coupé le courant des ampli 41.6MHz)
intervention dans la fosse (infra)

11H nouvelle ronde

Programme journée
Mesure dans LI pour Kick faisceau
(+Passage LE direct puis par anneau si ya le temps)

 

Mesure dans LI pour Kick faisceau

  • Donnees prises (fichier de mesures dans datashared, a traiter)

Mesures test Alignement DPI et SEPTUM

  • SCAN du premier bpm anneau (ri-ci_bpm02) en fonction du courqnt DPI puis courqat SEPTUM
  • Fichier dans /data/shared dans repertoire Scan_ring_injection

Passage LE direct puis par anneau --> pas eu le temps

 


 

 

 

 

 


 


 

 

 

  959   Wed Nov 13 08:26:05 2024 VCUnder ProcessShift summaryLinac Commissionning Shift summary 13/11/24 

demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC sDev 13pC
Température canon pas optimale: 31.6°C  le reflichi cann remonte en fin de pulse nouvelle consigne à 31.8°

Etude transmission charge à travers section en fonction de Col02n
( Q_transport_vs_Soleno.png   =>faisceau non centré dans la section (recette # good_injection_no_good_storage )

 

Centrage faisceau dans la section ref Elog Commitionning 917_1
    srt1 [H,V] 1.50 , -1.57
    srt2 [H,V] -3.83 , 2.37

Etude transmission charge à travers section en fonction de Col02n (Q 50pC  100pC 205pC 280pC)

 

Centrage faisceau dans la section ref Elog Commitionning 917_2

  srt1 [H,V] 2.26 , -3.30
    srt2 [H,V] -4.42 , 4.16

Etude transmission charge à travers section en fonction de Col02n (Q 180pC, 100pC)

Attention alignement 917_2 très mauvais du point de vue de la charge

 

 

comparaison charge BPM ICT   ==> gros probleme de lecture sur les BPMs somme....
Voir trends en pj dans lesquels on fait varier l'atténuation du laser, et on regarde les variations de charge et du signal Spsum.
Autour de 80pC de charge le signal Spsum fait des sauts pour ensuite à environ 90 pC de charge baisser d'environ 50% ...

Note : la charge a diminué pendant le shift passant de 300 pC à 420 degrés d'atténuation sur le laser à 160 pC .... Il faut monitorer l'energie du Laser ... 

Mesures de la taille en fonction du Soleno : /data/shared/mesure/today/Taille_Soleno/

 

 

Attachment 1: Q_transport_vs_Soleno.png
Q_transport_vs_Soleno.png
Attachment 2: Q_transport_vs_Soleno_Align_917_1.png
Q_transport_vs_Soleno_Align_917_1.png
Attachment 3: Q_transport_vs_Soleno_Align_917_2.png
Q_transport_vs_Soleno_Align_917_2.png
Attachment 4: ICT_Att_320_to_400.png
ICT_Att_320_to_400.png
Attachment 5: SPSum_LI_Att_320_to_400.png
SPSum_LI_Att_320_to_400.png
  Draft   Fri Nov 15 07:56:03 2024 IC, VK, VM, ND Shift summary  Ring studies, MRSV 

07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V

09h52 RF Gun phase 234 dg. Att. 0.0 dB, Charge -110.0 pC; Sect. phase 208 dg., Att. 2.566 dB, TL/BPM2 X +2 mm

10h00 injection to the ring TL/BPM2 X -2 mm

10h02 Ring RF 100 kV

Today compared to yesterday shift the synchrotron oscillation amplitude is very unstable. Phase ? To be investigated.

First beam imaging with the MRSV.

 BBA studies

Horizontal plane

BPM3 (BPM.04-Lib.03) dX=1.1 mm

BPM9 (BPM.04-Lib.05) dX=0.8 mm

BPM5 (BPM.06-Lib.04) dX=0.2 mm

BPM11 (BPM.06-Lib.05) dX=-0.3 mm

BPM4 (BPM.05-Lib.04) dX=-0.3 mm

BPM10 (BPM.05-Lib.05) dX=1.2 mm

Set offsets on X in Liberas (OffX)

BPM.01-Lib.03, 130000+1800000 = 1930000

BPM.02-Lib.03, 70000+400000 = 470000

BPM.04-Lib.03, 40000+1100000 = 1140000

BPM.06-Lib.04, 30000+200000 = 230000

BPM.03-Lib.03, 60000+100000 = 160000

BPM.05-Lib.04, 130000-300000 = -170000

BPM.01-Lib.04, 300000+400000 = 700000

BPM.02-Lib.04, 70000+200000 =  270000

BPM.05-Lib.05, 140000+1200000 = 1340000

BPM.06-Lib.05, -20000-300000 = -320000

BPM.04-Lib.04, -50000+800000 = 750000

BPM.03-Lib.03, 60000+100000 = 160000

Vertical plane

BPM12 ri-c1/dg/bpm.01-lib.03 dY =  -2.4 mm

BPM1 ri-c1/dg/bpm.02-lib.03 dY = - 0.1 mm

BPM2 ri-c1/dg/bpm.03-lib.03 dY = - 0.5 mm

BPM3 ri-c1/dg/bpm.04-lib.03 dY = -0.2 mm

BPM4 ri-c1/dg/bpm.05-lib.04 dY = -1.0 mm

BPM5 ri-c1/dg/bpm.06-lib.04 dY = - 0.7 mm

BPM6 ri-c2/dg/bpm.01-lib.04 dY = - 1 mm

BPM7 ri-c2/dg/bpm.02-lib.04 dY = - 0.1 mm

BPM8 ri-c2/dg/bpm.03-lib.05 dY = -0.3 mm

BPM9 ri-c2/dg/bpm.04-lib.05 dY = -0.6 mm

BPM10 ri-c2/dg/bpm.05-lib.05 dY = + 0.3 mm

BPM11 ri-c2/dg/bpm.06-lib.05 dY = +0.5 mm

Set offsets on Y in Liberas (OffY)

BPM12 ri-c1/dg/bpm.01-lib.03 dY_new  = -300000 -2.4 mm  = -2700000

BPM1 ri-c1/dg/bpm.02-lib.03 dY_new = - 10000 - 0.1 mm = -110000

BPM2 ri-c1/dg/bpm.03-lib.03 dY_new = 105000 - 0.5 mm = -395000

BPM3 ri-c1/dg/bpm.04-lib.03 dY_new = 190000 -0.2 mm = -10000

BPM4 ri-c1/dg/bpm.05-lib.04 dY_new = - 110000  -1.0 mm =  -1110000

BPM5 ri-c1/dg/bpm.06-lib.04 dY_new = -100000 - 0.7 mm = -800000

BPM6 ri-c2/dg/bpm.01-lib.04 dY_new = -20000 - 1 mm = -980000

BPM7 ri-c2/dg/bpm.02-lib.04 dY_new = 150000 - 0.1 mm = 50000

BPM8 ri-c2/dg/bpm.03-lib.05 dY_new = 0 - 0.3 mm = -300000

BPM9 ri-c2/dg/bpm.04-lib.05 dY_new = - 90000 -0.6 mm =  -690000

BPM10 ri-c2/dg/bpm.05-lib.05 dY_new = 70000 + 0.3 mm =  370000

BPM11 ri-c2/dg/bpm.06-lib.05 dY_new = 10000 +0.5 mm = 510000

 

Studies in single trigget mode. See screenshots.

Beam is stored (sligth decay) in the ring around 15 minutes without touching anything. This opens way for beam dynamics studies and for better understanding of machine. Need to find a way to have diagnostics data  (trigger only diag) in such mode.

17h50 Stop ThomX

 

 

 

 

 

 

 

Attachment 1: Screenshot_from_2024-11-15_17-28-09.png
Screenshot_from_2024-11-15_17-28-09.png
Attachment 2: Screenshot_from_2024-11-15_17-14-46.png
Screenshot_from_2024-11-15_17-14-46.png
Attachment 3: Screenshot_from_2024-11-15_17-14-38.png
Screenshot_from_2024-11-15_17-14-38.png
Attachment 4: Screenshot_from_2024-11-15_17-13-08.png
Screenshot_from_2024-11-15_17-13-08.png
Attachment 5: Screenshot_from_2024-11-15_17-12-53.png
Screenshot_from_2024-11-15_17-12-53.png
Attachment 6: Screenshot_from_2024-11-15_17-10-09.png
Screenshot_from_2024-11-15_17-10-09.png
Attachment 7: Screenshot_from_2024-11-15_17-10-00.png
Screenshot_from_2024-11-15_17-10-00.png
Attachment 8: Screenshot_from_2024-11-15_17-06-09.png
Screenshot_from_2024-11-15_17-06-09.png
Attachment 9: Screenshot_from_2024-11-15_17-04-24.png
Screenshot_from_2024-11-15_17-04-24.png
Attachment 10: Screenshot_from_2024-11-15_16-43-47.png
Screenshot_from_2024-11-15_16-43-47.png
Attachment 11: Screenshot_from_2024-11-15_16-42-08.png
Screenshot_from_2024-11-15_16-42-08.png
Attachment 12: Screenshot_from_2024-11-15_16-41-59.png
Screenshot_from_2024-11-15_16-41-59.png
Attachment 13: Screenshot_from_2024-11-15_16-40-52.png
Screenshot_from_2024-11-15_16-40-52.png
Attachment 14: Screenshot_from_2024-11-15_16-40-44.png
Screenshot_from_2024-11-15_16-40-44.png
Attachment 15: 1HzOscScreenshot_from_2024-11-15_16-32-30.png
1HzOscScreenshot_from_2024-11-15_16-32-30.png
Attachment 16: Screenshot_from_2024-11-15_17-33-43.png
Screenshot_from_2024-11-15_17-33-43.png
Attachment 17: Screenshot_from_2024-11-15_17-33-35.png
Screenshot_from_2024-11-15_17-33-35.png
Attachment 18: Screenshot_from_2024-11-15_17-28-09.png
Screenshot_from_2024-11-15_17-28-09.png
Attachment 19: Screenshot_from_2024-11-15_17-14-46.png
Screenshot_from_2024-11-15_17-14-46.png
Attachment 20: Screenshot_from_2024-11-15_17-14-38.png
Screenshot_from_2024-11-15_17-14-38.png
Attachment 21: Screenshot_from_2024-11-15_17-12-53.png
Screenshot_from_2024-11-15_17-12-53.png
Attachment 22: Screenshot_from_2024-11-15_17-10-09.png
Screenshot_from_2024-11-15_17-10-09.png
Attachment 23: Screenshot_from_2024-11-15_17-38-16.png
Screenshot_from_2024-11-15_17-38-16.png
Attachment 24: Screenshot_from_2024-11-15_12-12-55.png
Screenshot_from_2024-11-15_12-12-55.png
Attachment 25: Screenshot_from_2024-11-15_12-12-46.png
Screenshot_from_2024-11-15_12-12-46.png
Attachment 26: Screenshot_from_2024-11-15_12-11-23.png
Screenshot_from_2024-11-15_12-11-23.png
Attachment 27: Screenshot_from_2024-11-15_12-03-43.png
Screenshot_from_2024-11-15_12-03-43.png
Attachment 28: Screenshot_from_2024-11-15_11-55-01.png
Screenshot_from_2024-11-15_11-55-01.png
Attachment 29: Screenshot_from_2024-11-15_11-52-36.png
Screenshot_from_2024-11-15_11-52-36.png
Attachment 30: Screenshot_from_2024-11-15_11-47-59.png
Screenshot_from_2024-11-15_11-47-59.png
Attachment 31: Screenshot_from_2024-11-15_11-47-39.png
Screenshot_from_2024-11-15_11-47-39.png
Attachment 32: Screenshot_from_2024-11-15_11-21-31.png
Screenshot_from_2024-11-15_11-21-31.png
Attachment 33: Screenshot_from_2024-11-15_11-16-37.png
Screenshot_from_2024-11-15_11-16-37.png
Attachment 34: Screenshot_from_2024-11-15_10-59-46.png
Screenshot_from_2024-11-15_10-59-46.png
Attachment 35: Screenshot_from_2024-11-15_17-35-21-2.png
Screenshot_from_2024-11-15_17-35-21-2.png
Attachment 36: Screenshot_from_2024-11-15_17-36-04-2.png
Screenshot_from_2024-11-15_17-36-04-2.png
  964   Tue Nov 19 08:20:29 2024 MJ VC KD RC DNUnder ProcessShift summaryLinac Commissionning Shift summary 19/11/2024 icon3.gif 

8h20 demarrage machine

iris 1.3mm
att 440
phase Qmax 280   110pC
QEmax 90pC Ekin 4.6MeV  Etot 5.1MeV
arret pour cause d'alarme sf6 sur le MPS - cle thomx 0 pour verif pression : 2.4 mBar

Redemarrage

ph ch max  273
ph energie max -50
Recette 20241115_16_28_32
passage section
passage dipole - phase section disp min 207
Mesure energie YagTL1 Ekin=51.0
Faisceau sur Yag_TL3
Injection anneau

Relock de la cavite apres changement freq cavite RF

IP retrouvee - scan FPC pour mesure taille electrons : le flux X voit les kicks faisceau
Data a mettre en mode presentable ...

fin de shift 18h30

 

 

 

 

 

 

 

 

 


 

 

Attachment 1: YAG_TL3_beam.png
YAG_TL3_beam.png
Attachment 2: injection_ring.png
injection_ring.png
Attachment 3: Fluo_det.png
Fluo_det.png
  967   Fri Nov 22 11:18:28 2024 KD, RCUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 22 novembre 2024 

9h30 : mise en chauffe

intervention casemate pour alignement laser et nettoyage optique.

11h : démarrage, charge énergie max 100pC pour atténuateur à 330pas, phase 187°

On charge la recette et on règle le linac (energie et phase); position TL/BPM.02 à 0, et min de dispersion (tout allumé)

11h34 : stockage immédiat dans l'anneau ! C'est TOP !

Après midi compliqué pour trouver les rayons-X et avoir un cavité stable. 

synchronisation X :

* delay 33MHz/Trig ~ 2-4ns

* phase 500MHz CFP: 6.45V

prise de spectres X :

* déplacement du faisceau de rayonx X (à gauche et en bas) du à la nouvelle orbite

* spectro déréglé + trop de flux (saturation de l'acquisition)

 

Mise en place d'un "asservisement" du pointé d'injection dans l'anneau. Semble bien fonctionner (cf. screenshot), meme avec des variations d energie etc. Script dans : data/shared/commissioning_scripts/Linac/Alignements

18h30 : Stop ThomX

*** Programme prochain ***

* trend de flux avec asservissement du pointé d'injection

* affinement de la position du 0 du faisceau X

* mesure spectre angulaire

* prise d'une image du faisceau de rayons X

 

 

 

 

Attachment 1: TL_BPM4_locked.dat