  Draft   Tue Mar 18 07:56:38 2025 KD, IC, RC, DN, VMUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 18 mars 2025 - Mesure tailles transverses H et V de la source 

7h55: mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)

*** programme ***
     - préparation de la machine pour la seconde session d'imagerie (du 19 au 21 mars)
     - mesure et optimisation de la longueur de paquet dans le linac

-----------------------------------------------------------------------------

09h20 HV is 'ON'
09h30 RF gun phase is 10 dg., Sect Phase is 209 dg. Sect Att. is 2.57 dB, Charges: -107 pC
09h45 the modulator was set to the standby mode. Access to the bunker

Mesures X-rays in X-Hutch

 ** Verification Photonic Science avec le cable "Soleil" : ok

 ** Mesures tailles transverses source (H et V):
      Fermeture partielle des fentes 1
      Det Photonic sur bras detecteur (a 280 mm du zero hexapode)
      Prise d'images des bords de la fentes (a differents voltages cavite RF, de 50 a 280 kV)

19h10 Stop ThomX

Attachment 1: Screenshot_from_2025-03-18_18-04-13.png
Screenshot_from_2025-03-18_18-04-13.png
Attachment 2: Screenshot_from_2025-03-18_16-50-47.png
Screenshot_from_2025-03-18_16-50-47.png
Attachment 3: closed_orbit_18032025.png
closed_orbit_18032025.png
Attachment 4: closed_orbit_woCOR_18032025.png
closed_orbit_woCOR_18032025.png
Attachment 5: 2025-03-18_17_38_46_OBL_DG_MRSV_01-CCD_01_RAW.png
2025-03-18_17_38_46_OBL_DG_MRSV_01-CCD_01_RAW.png
  Draft   Wed Dec 17 07:17:06 2025 KD, IC, MV, DN,Under ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 17 décembre 2025 

7h15: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)

8h33 HV ON

09h30 Beam is in the ring 40 MeV, RF 100 kV ==> 150 kV I3+I4 up to 14000 pA. Vertical step at IP from -2 mm to +2 mm. MRSW 24.5 pix. Receipt  recipe_recipe_LI_TL_RI_all_20251217_09_17_49.txt

10h19 Hor. tune 0.177, sum of TbTsum 2e11. TL/BPM02 X=+3 mm, RF cavity phase 5 dg. Sect Att. 3.967 dB, Sect. phase 197 dg. RF gun phase 222 dg. Charges: -165, -157, -159, -161, -158 pA Laser Att. 300, Sol. 223 A

 

 

*** Programme ***

* faire 1 à 2 tomographie à 40 Mev avant de passer aux manips à 70MeV (besoin de flux pour la rapidité d'acquisition)

* passage à 70MeV, mesure de dosimétrie et spectre angulaire

  1188   Thu Feb 5 13:18:03 2026 KD, HG, VMFixedInfoLI | TL | LE | Ring | CC | Laser | Opt | MECA | SY | Vide | Electronique Laser PC status 

** l'iris a été changée et est opérationnelle

/!\ problème dans l'offset il faut ajouter 0.5mm à la valeur relu par Tango (pour 1.3mm il faut mettre 0.8 mm dans l'ATK panel)

** Laser PC ***

- Sortie Laser: 85 - 90 uJ (avant 250 uJ)

- Injectée ligne transport: 80 uJ (235 uJ)

- Sortie ligne transport: faisceau trop gros pour une mesure correct (188 uJ)

- Sortie Iris (ouverture max): 65 uJ (175 uJ)

- Sortie iris (1.3mm): 28uJ (51 uJ)

- injectée canon (iris 1.3 mm, 420 pas) : 22 uJ (43 uJ)

On a environ 2 fois moins de puissance laser disponible pour les e-, les 100pC devrait etre atteignable

/!\ refaire un alignement cathode ! le point à bougé (ouverture canon, réalignement laser).

*** Synchro ***

non testée pour le feedback de phase. 

16h00 HV is on

Section and RF gun processing

17h05 HV 990  V, RF gun att. 0 dB, interlocks

It seems that the brakdowns are in the waveguides, not in the RF gun.

17h31 HV 1010 V, Sect Att. 22 dB, RF gun Att. 10 dB

17h34 HV 1030 V, Sect Att. 22 dB, RF gun Att. 10 dB, interlocks

17h45 Stop ThomX

Attachment 1: Screenshot_from_2026-02-05_17-11-35.png
Screenshot_from_2026-02-05_17-11-35.png
  844   Thu Feb 8 08:31:19 2024 KD, HG, VC, RCUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 8 février 2024 

8h20 : Mise en chauffe de la machine pour shift de la journée

Charge Phase : 

Remarque sur les scan charge phase pour trouver l'energie Max:

en fonction des outils utilisés et des consignes des experts de dynamique faisceau, le choix de la phase à Energie max varie de 10°

soft de Nicolas : automatique 180° (phase charge max (juste avant perte charge)  240°  ) => E max --- Qmax- 60°

calcul de Hayg : 185° (à l'oeuil  phase charge max (juste avant perte charge)  235°)   => Emax ---- Q max - 50°

Sotf de Kevin :  182°   semi auto   (automatique phase charge max (jhaut de la courbe)  232°  )   => Emax --- Qmax - 50°

Qui a raison? 

 

Oscillations dans les BPMs (TL): 

Oscillations observées dans TL/DG/BPM02
ainsi que dans le PiC, voir la PJ
Les data de la RF (trend) sont dans le dossier du jour. 

Injection dans l'anneau : 

la recette a fonctionné pour une injection dans l'anneau. 

Optimisation : Xopt
Elle a retrouvé une injection correcte. A creuser pour garder la meilleure solution.  

Intervention sur la machine de Ronic: Apres midi 

 

Attachment 1: RF_PiCanon.png
RF_PiCanon.png
Attachment 2: Screenshot_2024-02-08_11-41-09-BPMtldgbpm.02-lib0.2.png
Screenshot_2024-02-08_11-41-09-BPMtldgbpm.02-lib0.2.png
  Draft   Thu Apr 10 09:03:35 2025 KD, HG, ND, ML, VMUnder ProcessShift summaryDiag | Linac Commissionning | Ring Commissioning shift du 10 avril 2025 

9h : mise en chauffe en remote (frigo/Chiller, Modulateur, laser, cyclage)

 

*** programme ***

 - alignement du rayonnement synchrotron et mesure longueur de paquet dans l'anneau.

 - mise en place de la visu du MRSV

17h13 50 MeV. Receipt  from 20250313_17_59_00 (Storage X ray 40k pA ) loaded, but Linac steerers set to H [0.73 -2.82], V [-2.5 2.92], RCDS on injection. Saved as 20250410_17_32_06.

RF gun phase is 235 dg., Sect. phase is 222 dg., Att. is 2.4 dB. TL/BPM2 X= 3.5 mm, tunes are: H 0.165, V 0.526

18h49 Stop ThomX

Attachment 1: Screenshot_from_2025-04-10_17-10-09.png
Screenshot_from_2025-04-10_17-10-09.png
Attachment 2: Screenshot_from_2025-04-10_17-09-56.png
Screenshot_from_2025-04-10_17-09-56.png
  1068   Tue May 13 08:05:21 2025 KD, HG, ME Under ProcessLinacTL | LE | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning shift du 13 mai 2025 : conditionnement GUN 

8h: mise en chauffe à distance modulateur et frigo/chiller

Demarrage à 10H
HV 1215V
consigne temp canon 29.4°C
att 3dB (3.8 MW)

att 1.25 (7.5MW) consigne temp 29.15°C

att 0 dB (Pic =7.5 MW) consigne 29.05 °C ( 3 µs et 6.26 Hz)

 

redémarrage conditionnement par Maher à 12h25, att 6 db jusqu'à 0.75 db ( 13h57 ) Il y a des coups " ratés " dans le timing modulateur (voir image jointe)

att 0.25 db 14h05

Il y a toujours des coups " ratés " dans le timing modulateur (voir image jointe) ==> Nicolas est intervenu, le  problème de "missed triggers rate " est résolu

Att 0 dB (7.5MW)  @ 3µs & 12.5 Hz _Solenoides on (Ifoc=230 A et ICC=66A) ==> consigne temp    28.45 °C (voi images)

fin de conditionnement 18:05

 

 

Attachment 1: RF_0dB_3US_6Hz.png
RF_0dB_3US_6Hz.png
Attachment 2: Vide_0dB_3us_6Hz.png
Vide_0dB_3us_6Hz.png
Attachment 3: Yag_Intensite_Trend_3us_6Hz.png
Yag_Intensite_Trend_3us_6Hz.png
Attachment 4: Rates_Synchro.png
Rates_Synchro.png
Attachment 5: RF_0dB_3us_12.5Hz_consi_temp_28.45_2025-05-13_17-57-53.png
RF_0dB_3us_12.5Hz_consi_temp_28.45_2025-05-13_17-57-53.png
Attachment 6: vide_odB_3us_12.5Hz_Ifoc230A_Icc66.4A_2025-05-13_18-00-06.png
vide_odB_3us_12.5Hz_Ifoc230A_Icc66.4A_2025-05-13_18-00-06.png
  Draft   Tue Dec 13 11:31:17 2022 KD, HGUnder ProcessLinacLI | TL | LE Run Linac  

 

Energie laser : 240 µJ en sortie Laser
Si la charge est basse il faut donc revoir la ligne de transport

- Energie en sortie de canon : Ekin = 4.71 MeV @ Energie Max (Phase = 269°)
- Transport section : Energy=49.82MeV (@110°)

13h: réalignement laser/photoCathode :
      *** plus de charge (max 150pC au lieu de 100 pC)
      *** profile de faisceau plus jolie (plus uniforme : pas de forme de sablier ou double faisceau)
===> verifier cathode

phase section 103° (1.2dB), phase canon (foc max -50°) 270° ==> energie : 50.92 MeV
 

 

 

  664   Tue Jan 10 09:20:23 2023 KD, HGUnder ProcessShift summaryLI | TL | LE | Linac Commissionning shift du 10 janvier 2023 

9h: mise en chauffe modulateur, chiller, laser.
Vidange de la fosse

Plusieurs configurations ont été testées sur la section en terme d'atténations. Les valeurs Energie vs Phase seront rajoutées ultérieurement. 
à une atténuation donnée correspond une valeur de phase qui maximise l'énergie et une qui minimise la dispersion en énergie. Les deux sont très proches (en théorie).

Nous resterons à 1.25 dB sur la section. 

l'optimum pour le transport n'est pas encore trouvé. On parle bien d'optimum = transport max de charge avec un jitter faible. 

Demain on continue, avec aussi un tour dans la LE et une mesure de charge sur la FC. 

**** Programme ****

- Controler l'énergie du faisceau d'électron (sortie canon, sortie LIL) en fonction de l'atténuation

- Aller dans la LE (hier les dipoles DPE et EL/PS/DP fonctionnaient parfaitement)

 

Attachment 1: E_phase_for_different_Att.png
E_phase_for_different_Att.png
  665   Wed Jan 11 15:15:30 2023 KD, HGUnder ProcessShift summaryLI | Linac Commissionning shift du 11 janvier 2023 

15h16 : Démarrage après chauffe de la machine

16h15 : Linac aligné et faisceau "stable" avant l'anneau (cf. courbes BPM), mais dérive (-3mm en X en 10 min sur TL/BPM.02). 

énergie : 51MeV (mesure steerer TL/STR.01), 1.25dB (1090 V)

17h50 : Signal dans la FC de la LE -> Nicolas en ligne pour régler le timing de la FC

19h : fin de run : Il faut confirmer la valeur de la charque dans le Dump de la LE, et maximiser le transport. Jouer sur les 2 dernier quad de la TL pour optimiser le transport de la charge. Recettes sauvées. A voir la reproductibilité. 

*** Programme ***

- Aller dans la LE, faire une mesure de signal FC

- sauver point de fonctionnement

- Investiguer la stabilité Linac VS phase RF (Canon et section)

Attachment 1: BPM_stable_16h18.png
BPM_stable_16h18.png
Attachment 2: faisceau_TL_YAG3.png
faisceau_TL_YAG3.png
Attachment 3: FC_Beam_OFF.png
FC_Beam_OFF.png
Attachment 4: FC_BeamON.png
FC_BeamON.png
  947   Mon Oct 28 18:56:01 2024 KD, HGUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 28 octobre 2024 

17h: faisceau machine.

** On fait un scan de TL/STR1 avec QP1 à QP4 à 0, faisceau aligné (QP1-QP3) coil afin d'avoir un faisceau sur l'écran TL/SST2 "focalisé". 

==> MadX prévoit un couplage de 0.3mm sur Yag pour 1mm de déplacement en entrée dipole, code Matlab prévoit 4.5mm sur Yag pour 1mm de déplacement en entrée dipole

==> la courbe montre position TL/BPM01 (avant dipole) et position sur TL/SST.02 (après dipole)

** On injecte avec recette canon 0dB et recette canon 0.5dB meme performance avec meme paramètres BPM (2E-6 tbtsum pour 0dB et 1.5E-6 pour 0.5dB). 

On mets RiC1/BPM01 et 02 en gain automatique, tbtsum retrouve des niveau "correte" quelques 1E-7. (on désactive le gain auto après)

** on est dans l'anneau avec un "bon stockage" canon 0dB ==> à affiner : recette dans "all_20241028_19_19_52"

 

19h42: arret machine

 

Attachment 1: scan_TL_STR1_VS_TL_YAG2.png
scan_TL_STR1_VS_TL_YAG2.png
Attachment 2: Screenshot_2024-10-28_19-40-50_BPM_ring.png
Screenshot_2024-10-28_19-40-50_BPM_ring.png
  1069   Wed May 14 08:07:26 2025 KD, HGUnder ProcessShift summaryLI | Opt | Linac Commissionning shift du 14 mai 2025 

8h: mise en chauffe à distance (modulateur, frigo/chiller, laser)

10h30: on a du faisceau atténuateur à 260pas pour 100pC.

Nouveau point cathode : [H,V] = [4.81, 3.62]

11h: stockage dans l'anneau avec la recette 50MeV de 100pC

Problem de lecture des charges (Wavecatcher) quand les kickers sont en marche (trig sur du bruit). Le problème n'existe pas quand le kicker est éteint. 

 

17h: Variation de la charge uniquement (machine non touchée). Charge max ~ 500pC pour iris à 1.3mm 

==> Stockage ok à 500pC (sans rien faire), il faut optimiser et regarder plus en détail car il n'y a pas un facteur 5 sur la charge stockée (juste 3).

18h : la charge (GUN) oscille, cf plot. 

18h30 : soleno scans à differentes charges : 100 pC / 500  et 600 pC (max) 

**** Programme ****

refaire du faisceau et retrouver le point de fonctionnement à 100pC avec la nouvelle cathode

Attachment 1: Probleme_charge.png
Probleme_charge.png
Attachment 2: Probleme_charge2.png
Probleme_charge2.png
Attachment 3: stockage_100pC.png
stockage_100pC.png
Attachment 4: stockage_250pC.png
stockage_250pC.png
Attachment 5: stockage_500pC.png
stockage_500pC.png
Attachment 6: Charge_oscillation.png
Charge_oscillation.png
Attachment 7: Size_vs_SolenoScan_18-25-30.png
Size_vs_SolenoScan_18-25-30.png
Attachment 8: Size_vs_SolenoScan_18-30-49.png
Size_vs_SolenoScan_18-30-49.png
Attachment 9: Size_vs_SolenoScan_18-35-05.png
Size_vs_SolenoScan_18-35-05.png
  797   Thu Sep 28 08:44:37 2023 KD, DN, IC, VM, VKFixedShift summaryLI | TL | Ring | Opt | Linac Commissionning | Ring Commissioning run du 28 septembre 2023 

8h40: mise en chauffe de la machine (modulateur, chiller, laser, cyclage aimants)

==> La clim de la casemate a été redémarrer ce jour : quelqu'un avait déverouillé manuellement la régulation et éteint le groupe froid à l'extérieur (Sabotage ?) Désecente de la température de la casemate pendant la journée, de 25°C à 21°C

 

*** Programme ***

- injection dans l'anneau et obtenir un stockage stable
    * evaluation des performances de stockage

- stocker de la puissance dans la cavité de facon stable

- trouver les rayons X en mode désynchronisé

- synchroniser la cavité FP et l'anneau

- trouver les rayons X en mode synchrone

Scan charge phase

Align on QP3 with steerer

load recipie 08/28 16.45.

Kevin align laser 5.24; 2.91

No storage.

Problems found: timing of pulsed elenets was wrong, kicker was not triggered.

10.51 Storage

 

Modulator V : 1100 . pour éviter un point autour de 1.64dB de la séction qui "claque" beaucoup

Problems with timing system, jitter between ring and linac. Kevin intervention(15.10) 2x times lower jitter.

Laser phase and energy manual tuning along the run , each 10 mins.

Work on the orbit at 500.25, established good storage, stable orbit, tune  = 3.17 . 

Recipie: # 500.25 MHz MCF 0.02 TL BPM2 4mm  Att 1.842 Good storage At IP BPM readings  x =3 mm y = -2

file: recipe_recipe_LI_TL_RI_all_20230928_15_43_43.txt

# 500.25 MHz MCF 0.02 TL BPM2 4mm  Att 1.842 Good storage At IP BPM readings  x =3 mm y = -2
LI/PS/COL.01/currentSetpointPM : <type 'float'> : 63.58
LI/PS/COL.02/currentSetpointPM : <type 'float'> : 220.0
EL/PS/QP.01/currentSetpointPM : <type 'float'> : 2.7
EL/PS/QP.02/currentSetpointPM : <type 'float'> : -3.8
EL/PS/QP.03/currentSetpointPM : <type 'float'> : 6.4
EL/PS/QP.04/currentSetpointPM : <type 'float'> : 5.6
EL/PS/QP.05/currentSetpointPM : <type 'float'> : -4.7
EL/PS/QP.06/currentSetpointPM : <type 'float'> : 0.0
EL/PS/QP.07/currentSetpointPM : <type 'float'> : -3.0
LI/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -1.26361302428
LI/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.181343322373
LI/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 0.298179622745
LI/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 0.0577819455818
EL/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 0.0
EL/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/QP.01/currentSetpointPM : <type 'float'> : -0.08
TL/PS/QP.02/currentSetpointPM : <type 'float'> : 3.5
TL/PS/QP.03/currentSetpointPM : <type 'float'> : -3.4
TL/PS/QP.04/currentSetpointPM : <type 'float'> : 2.11
TL/PS/QP.05/currentSetpointPM : <type 'float'> : 1.53
TL/PS/QP.06/currentSetpointPM : <type 'float'> : -4.2
TL/PS/QP.07/currentSetpointPM : <type 'float'> : 4.0
RI-C1-C2/PS/SP.03/currentSetpointPM : <type 'float'> : -2.10232230226
RI-C1/PS/QP.01/currentSetpointPM : <type 'float'> : 2.98190476016
RI-C1/PS/QP.02/currentSetpointPM : <type 'float'> : -1.38381809221
RI-C1/PS/QP.03/currentSetpointPM : <type 'float'> : -1.37381809221
RI-C1/PS/QP.04/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C1/PS/QP.05/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1/PS/QP.06/currentSetpointPM : <type 'float'> : 1.14141079069
RI-C1/PS/QP.07/currentSetpointPM : <type 'float'> : 5.73197488985
RI-C1/PS/QP.08/currentSetpointPM : <type 'float'> : -4.95095010278
RI-C1/PS/QP.09/currentSetpointPM : <type 'float'> : -4.95595010278
RI-C1/PS/QP.10/currentSetpointPM : <type 'float'> : 5.73697488985
RI-C1/PS/QP.11/currentSetpointPM : <type 'float'> : 1.14641079069
RI-C1/PS/QP.12/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1-C2/PS/SP.01/currentSetpointPM : <type 'float'> : -1.05429041718
RI-C2/PS/QP.01/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C2/PS/QP.02/currentSetpointPM : <type 'float'> : -1.36881809221
RI-C2/PS/QP.03/currentSetpointPM : <type 'float'> : -1.37881809221
RI-C2/PS/QP.04/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C2/PS/QP.05/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C2/PS/QP.06/currentSetpointPM : <type 'float'> : 1.14641079069
RI-C2/PS/QP.07/currentSetpointPM : <type 'float'> : 5.72197488985
RI-C2/PS/QP.08/currentSetpointPM : <type 'float'> : -4.94595010278
RI-C2/PS/QP.09/currentSetpointPM : <type 'float'> : -4.95095010278
RI-C2/PS/QP.10/currentSetpointPM : <type 'float'> : 5.73197488985
RI-C2/PS/QP.11/currentSetpointPM : <type 'float'> : 1.14141079069
RI-C2/PS/QP.12/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1-C2/PS/SP.02/currentSetpointPM : <type 'float'> : 4.28000131
TL/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : -5.0
TL/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 1.0
TL/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : -4.075
TL/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : -4.508
TL/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : 4.471
TL/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 8.107
TL/PS/DPI.01/currentSetpointPM : <type 'float'> : 7.8
RI-C1/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : -0.348755052057
RI-C1/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -6.03938458444
RI-C1/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 1.81059006906
RI-C1/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : -2.8368718
RI-C1/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : -4.1069025178
RI-C1/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : 2.91014798531
RI-C1/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : -1.59301651177
RI-C1/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 2.76102662193
RI-C1/PS/STR.05-V.01/currentSetpointPM : <type 'float'> : -0.699808993922
RI-C1/PS/STR.05-H.01/currentSetpointPM : <type 'float'> : -2.81346754046
RI-C1/PS/STR.06-V.01/currentSetpointPM : <type 'float'> : 0.633858774544
RI-C1/PS/STR.06-H.01/currentSetpointPM : <type 'float'> : -6.58936968674
EL/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : 0.0
EL/PS/DPI.01/currentSetpointPM : <type 'float'> : 1.5
RI-C2/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : -0.541923964033
RI-C2/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -7.62132043322
RI-C2/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : -1.65386120138
RI-C2/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : -2.06590600871
RI-C2/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : 1.74569887902
RI-C2/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : 3.15410183944
RI-C2/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : -2.15975369706
RI-C2/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 2.33603780651
RI-C2/PS/STR.05-V.01/currentSetpointPM : <type 'float'> : 2.02230798878
RI-C2/PS/STR.05-H.01/currentSetpointPM : <type 'float'> : -1.51084876179
RI-C2/PS/STR.06-V.01/currentSetpointPM : <type 'float'> : -1.79544220942
RI-C2/PS/STR.06-H.01/currentSetpointPM : <type 'float'> : -4.21190265909
EL/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.0
RI-C1/PS/DP.01/currentSetpointPM : <type 'float'> : 159.299592181
TL/PS/DP.01/currentSetpointPM : <type 'float'> : 159.3
EL/PS/DP.01/currentSetpointPM : <type 'float'> : 160.0
TEST/HL/ThomX_PhotoCathode/Horizontal_Iris_Position_set : <type 'float'> : 5.24
TEST/HL/ThomX_PhotoCathode/Vertical_Iris_Position_set : <type 'float'> : 2.91
er/pe/inj_kick_ps/Voltage : <type 'float'> : 5580.26513672
er/pe/inj_kick_ps/Current : <type 'float'> : 5.0
er/pe/pass_sept_ps/Current : <type 'float'> : 5.0
er/pe/pass_sept_ps/Voltage : <type 'float'> : 106.125869751

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: Screenshot_from_2023-09-28_16-03-17.png
Screenshot_from_2023-09-28_16-03-17.png
  1113   Thu Sep 4 07:38:32 2025 KD, DN, HG, JMUnder ProcessShift summaryLaser | Linac Commissionning shift du 4 septembre 2025 

7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)

Réailgnement ligne UV Laser Photocathode

- énergie sortie laser : 245uJ

- énergie injection ligne de transport : 170uJ (avant), 220uJ (après)

- énergie sortie ligne de transport : 170uJ

- énergie sortie iris (1.3mm) : 53uJ

- énergie injection canon (iris 1.3mm, atténuateur @420pas) : 43uJ 

13h30 : 

on a continué à faire des mesures d'émittance à 500 pC et plusieurs valeur de Soleno. 
Les résultats sont cohérents sauf pour 250 A avec une emittance qui explose en Y. les résultats sont dans today, avec un travail en off à faire pour comparer à Bmad. 
D'autres mesures seront nécessaires pour conclure sur la TL. 

18h : Stop  

 

/!\ l'iris est morte et a été débranchée. Elle est réglé sur 1.3mm

**** Programme ****

- réalignement ligne UV

- déblocage de l'iris laser PhotoCathode

 

 

  878   Mon Jun 10 13:36:25 2024 KD, CJ, WE, GO, VC, NDUnder ProcessShift summaryLinac Commissionning claquage et test micros 

9h: accès sous-sol

12h: démarrage modulateur pour test micro (atténuateur à 15dB)

** Les micros sont positionné à différents endroit pour voir leur réponse (2 micros au même endroit)

sur la bride d'entrée diviseur de puissance (cf image)

sur la bride d'entrée atténuateur (cf image)

** les micros sont mis : sur la bride du diviseur, un sur la bride de l'atténuateur

** puis on fait varier l'atténuateur pour voir si ca change quelques chose. Les claquage à 5dB sont moins fréquents (toutes les minuetes) qu'à 15dB (à peine qq secondes)

** à 5Hz les claquage sont moins réguliers encore (toutes les 3mins)

*** Conclusions ***

Il semblerait que le diviseur ET l'atténuateur claquent (cf courbes à 5dB)

Il y a toujours des micros claquages (même sans interlock) visibles (cf courbe à 4dB)

 

 

 

Attachment 1: claquage_micro_bride_entree_diviseur.png
claquage_micro_bride_entree_diviseur.png
Attachment 2: claquage_micro_bride_entree_attenuateur.png
claquage_micro_bride_entree_attenuateur.png
Attachment 3: claquage_micro_bride_entree_diviseur_attenuateur.png
claquage_micro_bride_entree_diviseur_attenuateur.png
Attachment 4: claquage_micro_bride_entree_diviseur_attenuateur_zoom.png
claquage_micro_bride_entree_diviseur_attenuateur_zoom.png
Attachment 5: claquage_micro_bride_entree_diviseur_attenuateur_bis.png
claquage_micro_bride_entree_diviseur_attenuateur_bis.png
Attachment 6: claquage_micro_bride_entree_diviseur_attenuateur_ter.png
claquage_micro_bride_entree_diviseur_attenuateur_ter.png
Attachment 7: claquage_micro_bride_entree_diviseur_attenuateur_5dB.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB.png
Attachment 8: claquage_micro_bride_entree_diviseur_attenuateur_5dB_zoom.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB_zoom.png
Attachment 9: claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis.png
Attachment 10: claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis_zoom.png
claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis_zoom.png
Attachment 11: standard_micro_bride_entree_diviseur_attenuateur_4dB.png
standard_micro_bride_entree_diviseur_attenuateur_4dB.png
  750   Fri May 5 08:47:28 2023 KD VM VK JN SLUnder ProcessShift summaryRing Commissioning shift du 5 mai 2023 

8h30 : accès casemate controlé 

==> septum et kickers OFF et cavité RF OFF

==> problème cavité RF, mux 3 défaut de communication

==> impossible d'acquité les interlocks et redémarrer la cavité.

Morning restart of machine was easy for the same parameters from day before.

 

Problem with network was fixed by G. Philippon, it was due to the limited number of allowed ports in the new swith that was recently replaced.

Still we cannot start RF Cavity with Jean Noel. Ampli is working, but no communication of Consigne from Tango to LLRF hardware.

14.30 Cavity on, getting power.

Frequency 500.41->500.4094, and phase manual optimisation.

Power in cavity is changing from 60 kV to 80kV for  80kV setpoint.

Saving data for postprocess. Orbit correction.

Beam is stable and stored. Orbit is positive. energy is about 50.075MeV, ring dipoles 160A. Sextupoles on.

Extraction kicker started to extract just before injection.

 

 

 

 

 

 

 

 

 

 

Attachment 1: Screenshot_from_2023-05-05_17-25-28.png
Screenshot_from_2023-05-05_17-25-28.png
Attachment 2: Screenshot_from_2023-05-05_17-13-31.png
Screenshot_from_2023-05-05_17-13-31.png
Attachment 3: Screenshot_from_2023-05-05_17-13-41.png
Screenshot_from_2023-05-05_17-13-41.png
Attachment 4: Screenshot_from_2023-05-05_17-52-52.png
Screenshot_from_2023-05-05_17-52-52.png
Attachment 5: Screenshot_from_2023-05-05_17-50-31.png
Screenshot_from_2023-05-05_17-50-31.png
  Draft   Mon Feb 24 08:00:09 2025 KD VC VMUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 24 février 2025 

8h: mise en chauffe de la machine (Frigo/chiller, laser, modulateur et cyclage aimants).

9H demarrage faisceau

Charge gun 110pC

10h go to the ring => optimisation Finished

Waiting  from X ray

feedback injection:

/data/shared/commissioning_scripts/Linac/Alignements/feedback_linac_injection.py

/data/shared/commissioning_scripts/Linac/Alignements/feedback_ring_injection.py

15h stop machine pour check fente ligne X

17H redemarrage machine

 

 

 

 

 

 

 

  1108   Thu Aug 21 08:07:06 2025 KD VC IC RC (VM)Under ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 21 aout 2025 

8h: mise en chauffe à distance (chiller/frigo, modulateur, laser, cyclage)

9h Start of the machine at 70 Mev, Charge 95 pC

10h Start from the previous receipt for 70 MeV (see June, 6). Beam is injected only for about 50 turns. Try to understand the problem. It seems that the energy from the injector + injection by itself does not match the saved receipt.

It was observed that the x-position at TL BPM2 sometimes changes in kind of steps (perhaps effect of regulation ?), see screenshot.

Orbit correction.

After several iterations the good storage obtained similar to June,6. The vertical orbit is flat at the IP. The receipts are saved.

We performed the vertical FPC scan. The vert beam size is 122 um. The max signal measured I3+I4 = 40k pA

We started to increase the charge to investigate the linearity in X-ray flux. Due to the problem with phtocathode laser the max charge achieved is 225 pC. The obtained results are plotted and attached (the data should be available via archivage)

Up to 225 pC the linearity is quite good.

The EL is set for 70 MeV as well and the beam is seen on the EL SST.

it was observed that the EL dipole affects the SR beam via orbit distortion. The SR orbit was recorrected to account for this effect. The receipt is saved for the whole machine.

18h STOP ThomX

*** Programme ***

- Stockage à 70MeV

- caractérisation X (taille faisceau, spectre ou autre)

difficulté à passer le modulateur à 1215V... (45mn)

Col0.1 et col0.2 en défaut

 
 

 

 

Attachment 1: Screenshot_from_2025-08-21_13-59-45.png
Screenshot_from_2025-08-21_13-59-45.png
Attachment 2: Screenshot_from_2025-08-21_14-38-23.png
Screenshot_from_2025-08-21_14-38-23.png
Attachment 3: Screenshot_from_2025-08-21_17-06-02.png
Screenshot_from_2025-08-21_17-06-02.png
Attachment 4: Screenshot_from_2025-08-21_14-29-45.png
Screenshot_from_2025-08-21_14-29-45.png
Attachment 5: Xray_vs_GunCharge_1png.png
Xray_vs_GunCharge_1png.png
Attachment 6: VerticalScanSynch.png
VerticalScanSynch.png
Attachment 7: Screenshot_from_2025-08-21_13-59-55.png
Screenshot_from_2025-08-21_13-59-55.png
Attachment 8: Screenshot_from_2025-08-21_13-58-05.png
Screenshot_from_2025-08-21_13-58-05.png
Attachment 9: 2025-08-21_17_36_40_el_dg_sst_01-ccd_01_RAW.png
2025-08-21_17_36_40_el_dg_sst_01-ccd_01_RAW.png
Attachment 10: Screenshot_from_2025-08-21_13-36-11.png
Screenshot_from_2025-08-21_13-36-11.png
Attachment 11: Screenshot_from_2025-08-21_17-57-58.png
Screenshot_from_2025-08-21_17-57-58.png
  1112   Wed Sep 3 07:47:42 2025 KD VC HG JMUnder ProcessShift summaryLinac Commissionning shift du 3 septembre 2025 

7h47: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)
8H50 demarrage machine
load recette godd_20250821_17_14_40
faisceau ligne dispersive (phase canon 272° phase section 247° DP.01 253.77A image 2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW)
quad scan

10H Moddulateur en standby PPS PA exploi OFF

14h30: Mesures d'émittance à QP3 pour différentes conditions de charge 100pC et 170 pC, fits et scans dans le dossier today
Soucis Iris : Moteur en erreur, valeur 1.35 mm (pas sûre ...)
but des mesures : vérifier le code Matlab (Viktor)
A faire : Xcheck avec le code py (Hayg)
Autre aspect : faire attention aux images saturées, ça change le scan, et donc l"emittance calculée.

17h45 : fin du shift, Kevin va venir voir le shutter.

 

 

 

 

==> il faut réaligner la ligne UV, charge max < 200pC

Attachment 1: 2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW.png
2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW.png
  1141   Thu Oct 23 07:45:25 2025 KD RC VC MJUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning shift du 23 octobre 2025 

7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
recette "50MeV_smallorbit_with EL_20251016_19_49_25.txt"   fichier VIDE
pB RI-C2 QP2 => serrage des cosses sur le Qpole +redemarrage serveur => résolu
alignement Quad
Feedback ring injection ON
RF ring cavity   150KV (phase 3° freq 500.100450MHz)

10h26 RF Gun laser state went 'Fault'

La streak a ete "importee" en sdc, elle est maintenant pilotable en sdc

Programme : spectres a different temps d'extraction

** Calib du CdTe avec feuille de Sn

** Mapping avec Script fwhm 25 positions CdTe  (-40 a +40 environ)

** Prise de spectres autour de la position zero mapping

** Prise de spectres a 12.5 Hz a differents temps d'extraction (de 10 ms a 70 ms)

** Prise de spectres a 1.5 Hz   a differents temps d'extraction (10, 50 et 100 ms)

 


 

 

 

  Draft   Thu Nov 13 08:00:59 2025 KD MJ VM HGFixedShift summaryLI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X 

Apres que Kevin a regle tous les problemes synchro signal bpm etc etc etc

L'interface SST ne fonctionne pas - URGENT  ==> probleme resolu 

Libera 2 et 4 reboote une 2eme fois ...

Faisceau dans l'anneau

15h15 toujours impossible de locker la cavite FP, pour une raison inconnue ==>  Shift reporte

Several manual BBA steps were performed in the Hor. plane for Ri-C1/QP01 to find the offset change in Ri-C1/BPM01.

16h46 Stop ThomX

 