Tue Mar 18 07:56:38 2025 |
KD, IC, RC, DN, VM | Under Process | Shift summary | Laser | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 18 mars 2025 - Mesure tailles transverses H et V de la source | |
7h55: mise en chauffe en remote (modulateur, laser, frigo/chiller, cyclage)
*** programme ***
- préparation de la machine pour la seconde session d'imagerie (du 19 au 21 mars)
- mesure et optimisation de la longueur de paquet dans le linac
-----------------------------------------------------------------------------
09h20 HV is 'ON'
09h30 RF gun phase is 10 dg., Sect Phase is 209 dg. Sect Att. is 2.57 dB, Charges: -107 pC
09h45 the modulator was set to the standby mode. Access to the bunker
Mesures X-rays in X-Hutch
** Verification Photonic Science avec le cable "Soleil" : ok
** Mesures tailles transverses source (H et V):
Fermeture partielle des fentes 1
Det Photonic sur bras detecteur (a 280 mm du zero hexapode)
Prise d'images des bords de la fentes (a differents voltages cavite RF, de 50 a 280 kV)
19h10 Stop ThomX |
| Attachment 1: Screenshot_from_2025-03-18_18-04-13.png
|
 |
| Attachment 2: Screenshot_from_2025-03-18_16-50-47.png
|
 |
| Attachment 3: closed_orbit_18032025.png
|
 |
| Attachment 4: closed_orbit_woCOR_18032025.png
|
 |
| Attachment 5: 2025-03-18_17_38_46_OBL_DG_MRSV_01-CCD_01_RAW.png
|
 |
|
Draft
|
Wed Dec 17 07:17:06 2025 |
KD, IC, MV, DN, | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 17 décembre 2025 | |
7h15: mise en chauffe en remote (chiller/frigo, laser, modulateur, cyclage)
8h33 HV ON
09h30 Beam is in the ring 40 MeV, RF 100 kV ==> 150 kV I3+I4 up to 14000 pA. Vertical step at IP from -2 mm to +2 mm. MRSW 24.5 pix. Receipt recipe_recipe_LI_TL_RI_all_20251217_09_17_49.txt
10h19 Hor. tune 0.177, sum of TbTsum 2e11. TL/BPM02 X=+3 mm, RF cavity phase 5 dg. Sect Att. 3.967 dB, Sect. phase 197 dg. RF gun phase 222 dg. Charges: -165, -157, -159, -161, -158 pA Laser Att. 300, Sol. 223 A
*** Programme ***
* faire 1 à 2 tomographie à 40 Mev avant de passer aux manips à 70MeV (besoin de flux pour la rapidité d'acquisition)
* passage à 70MeV, mesure de dosimétrie et spectre angulaire |
|
1188
|
Thu Feb 5 13:18:03 2026 |
KD, HG, VM | Fixed | Info | LI | TL | LE | Ring | CC | Laser | Opt | MECA | SY | Vide | Electronique |
|
Laser PC status | |
** l'iris a été changée et est opérationnelle
/!\ problème dans l'offset il faut ajouter 0.5mm à la valeur relu par Tango (pour 1.3mm il faut mettre 0.8 mm dans l'ATK panel)
** Laser PC ***
- Sortie Laser: 85 - 90 uJ (avant 250 uJ)
- Injectée ligne transport: 80 uJ (235 uJ)
- Sortie ligne transport: faisceau trop gros pour une mesure correct (188 uJ)
- Sortie Iris (ouverture max): 65 uJ (175 uJ)
- Sortie iris (1.3mm): 28uJ (51 uJ)
- injectée canon (iris 1.3 mm, 420 pas) : 22 uJ (43 uJ)
On a environ 2 fois moins de puissance laser disponible pour les e-, les 100pC devrait etre atteignable
/!\ refaire un alignement cathode ! le point à bougé (ouverture canon, réalignement laser).
*** Synchro ***
non testée pour le feedback de phase.
16h00 HV is on
Section and RF gun processing
17h05 HV 990 V, RF gun att. 0 dB, interlocks
It seems that the brakdowns are in the waveguides, not in the RF gun.
17h31 HV 1010 V, Sect Att. 22 dB, RF gun Att. 10 dB
17h34 HV 1030 V, Sect Att. 22 dB, RF gun Att. 10 dB, interlocks
17h45 Stop ThomX |
| Attachment 1: Screenshot_from_2026-02-05_17-11-35.png
|
 |
|
844
|
Thu Feb 8 08:31:19 2024 |
KD, HG, VC, RC | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 8 février 2024 | |
8h20 : Mise en chauffe de la machine pour shift de la journée
Charge Phase :
Remarque sur les scan charge phase pour trouver l'energie Max:
en fonction des outils utilisés et des consignes des experts de dynamique faisceau, le choix de la phase à Energie max varie de 10°
soft de Nicolas : automatique 180° (phase charge max (juste avant perte charge) 240° ) => E max --- Qmax- 60°
calcul de Hayg : 185° (à l'oeuil phase charge max (juste avant perte charge) 235°) => Emax ---- Q max - 50°
Sotf de Kevin : 182° semi auto (automatique phase charge max (jhaut de la courbe) 232° ) => Emax --- Qmax - 50°
Qui a raison?
Oscillations dans les BPMs (TL):
Oscillations observées dans TL/DG/BPM02
ainsi que dans le PiC, voir la PJ
Les data de la RF (trend) sont dans le dossier du jour.
Injection dans l'anneau :
la recette a fonctionné pour une injection dans l'anneau.
Optimisation : Xopt
Elle a retrouvé une injection correcte. A creuser pour garder la meilleure solution.
Intervention sur la machine de Ronic: Apres midi
|
| Attachment 1: RF_PiCanon.png
|
 |
| Attachment 2: Screenshot_2024-02-08_11-41-09-BPMtldgbpm.02-lib0.2.png
|
 |
|
Draft
|
Thu Apr 10 09:03:35 2025 |
KD, HG, ND, ML, VM | Under Process | Shift summary | Diag | Linac Commissionning | Ring Commissioning |
|
shift du 10 avril 2025 | |
9h : mise en chauffe en remote (frigo/Chiller, Modulateur, laser, cyclage)
*** programme ***
- alignement du rayonnement synchrotron et mesure longueur de paquet dans l'anneau.
- mise en place de la visu du MRSV
17h13 50 MeV. Receipt from 20250313_17_59_00 (Storage X ray 40k pA ) loaded, but Linac steerers set to H [0.73 -2.82], V [-2.5 2.92], RCDS on injection. Saved as 20250410_17_32_06.
RF gun phase is 235 dg., Sect. phase is 222 dg., Att. is 2.4 dB. TL/BPM2 X= 3.5 mm, tunes are: H 0.165, V 0.526
18h49 Stop ThomX |
| Attachment 1: Screenshot_from_2025-04-10_17-10-09.png
|
 |
| Attachment 2: Screenshot_from_2025-04-10_17-09-56.png
|
 |
|
1068
|
Tue May 13 08:05:21 2025 |
KD, HG, ME | Under Process | Linac | TL | LE | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
shift du 13 mai 2025 : conditionnement GUN | |
8h: mise en chauffe à distance modulateur et frigo/chiller
Demarrage à 10H
HV 1215V
consigne temp canon 29.4°C
att 3dB (3.8 MW)
att 1.25 (7.5MW) consigne temp 29.15°C
att 0 dB (Pic =7.5 MW) consigne 29.05 °C ( 3 µs et 6.26 Hz)
redémarrage conditionnement par Maher à 12h25, att 6 db jusqu'à 0.75 db ( 13h57 ) Il y a des coups " ratés " dans le timing modulateur (voir image jointe)
att 0.25 db 14h05
Il y a toujours des coups " ratés " dans le timing modulateur (voir image jointe) ==> Nicolas est intervenu, le problème de "missed triggers rate " est résolu
Att 0 dB (7.5MW) @ 3µs & 12.5 Hz _Solenoides on (Ifoc=230 A et ICC=66A) ==> consigne temp 28.45 °C (voi images)
fin de conditionnement 18:05
|
| Attachment 1: RF_0dB_3US_6Hz.png
|
 |
| Attachment 2: Vide_0dB_3us_6Hz.png
|
 |
| Attachment 3: Yag_Intensite_Trend_3us_6Hz.png
|
 |
| Attachment 4: Rates_Synchro.png
|
 |
| Attachment 5: RF_0dB_3us_12.5Hz_consi_temp_28.45_2025-05-13_17-57-53.png
|
 |
| Attachment 6: vide_odB_3us_12.5Hz_Ifoc230A_Icc66.4A_2025-05-13_18-00-06.png
|
 |
|
Draft
|
Tue Dec 13 11:31:17 2022 |
KD, HG | Under Process | Linac | LI | TL | LE |
|
Run Linac | |
Energie laser : 240 µJ en sortie Laser
Si la charge est basse il faut donc revoir la ligne de transport
- Energie en sortie de canon : Ekin = 4.71 MeV @ Energie Max (Phase = 269°)
- Transport section : Energy=49.82MeV (@110°)
13h: réalignement laser/photoCathode :
*** plus de charge (max 150pC au lieu de 100 pC)
*** profile de faisceau plus jolie (plus uniforme : pas de forme de sablier ou double faisceau)
===> verifier cathode
phase section 103° (1.2dB), phase canon (foc max -50°) 270° ==> energie : 50.92 MeV
|
|
664
|
Tue Jan 10 09:20:23 2023 |
KD, HG | Under Process | Shift summary | LI | TL | LE | Linac Commissionning |
|
shift du 10 janvier 2023 | |
9h: mise en chauffe modulateur, chiller, laser.
Vidange de la fosse
Plusieurs configurations ont été testées sur la section en terme d'atténations. Les valeurs Energie vs Phase seront rajoutées ultérieurement.
à une atténuation donnée correspond une valeur de phase qui maximise l'énergie et une qui minimise la dispersion en énergie. Les deux sont très proches (en théorie).
Nous resterons à 1.25 dB sur la section.
l'optimum pour le transport n'est pas encore trouvé. On parle bien d'optimum = transport max de charge avec un jitter faible.
Demain on continue, avec aussi un tour dans la LE et une mesure de charge sur la FC.
**** Programme ****
- Controler l'énergie du faisceau d'électron (sortie canon, sortie LIL) en fonction de l'atténuation
- Aller dans la LE (hier les dipoles DPE et EL/PS/DP fonctionnaient parfaitement)
|
| Attachment 1: E_phase_for_different_Att.png
|
 |
|
665
|
Wed Jan 11 15:15:30 2023 |
KD, HG | Under Process | Shift summary | LI | Linac Commissionning |
|
shift du 11 janvier 2023 | |
15h16 : Démarrage après chauffe de la machine
16h15 : Linac aligné et faisceau "stable" avant l'anneau (cf. courbes BPM), mais dérive (-3mm en X en 10 min sur TL/BPM.02).
énergie : 51MeV (mesure steerer TL/STR.01), 1.25dB (1090 V)
17h50 : Signal dans la FC de la LE -> Nicolas en ligne pour régler le timing de la FC
19h : fin de run : Il faut confirmer la valeur de la charque dans le Dump de la LE, et maximiser le transport. Jouer sur les 2 dernier quad de la TL pour optimiser le transport de la charge. Recettes sauvées. A voir la reproductibilité.
*** Programme ***
- Aller dans la LE, faire une mesure de signal FC
- sauver point de fonctionnement
- Investiguer la stabilité Linac VS phase RF (Canon et section) |
| Attachment 1: BPM_stable_16h18.png
|
 |
| Attachment 2: faisceau_TL_YAG3.png
|
 |
| Attachment 3: FC_Beam_OFF.png
|
 |
| Attachment 4: FC_BeamON.png
|
 |
|
947
|
Mon Oct 28 18:56:01 2024 |
KD, HG | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 28 octobre 2024 | |
17h: faisceau machine.
** On fait un scan de TL/STR1 avec QP1 à QP4 à 0, faisceau aligné (QP1-QP3) coil afin d'avoir un faisceau sur l'écran TL/SST2 "focalisé".
==> MadX prévoit un couplage de 0.3mm sur Yag pour 1mm de déplacement en entrée dipole, code Matlab prévoit 4.5mm sur Yag pour 1mm de déplacement en entrée dipole
==> la courbe montre position TL/BPM01 (avant dipole) et position sur TL/SST.02 (après dipole)
** On injecte avec recette canon 0dB et recette canon 0.5dB meme performance avec meme paramètres BPM (2E-6 tbtsum pour 0dB et 1.5E-6 pour 0.5dB).
On mets RiC1/BPM01 et 02 en gain automatique, tbtsum retrouve des niveau "correte" quelques 1E-7. (on désactive le gain auto après)
** on est dans l'anneau avec un "bon stockage" canon 0dB ==> à affiner : recette dans "all_20241028_19_19_52"
19h42: arret machine
|
| Attachment 1: scan_TL_STR1_VS_TL_YAG2.png
|
 |
| Attachment 2: Screenshot_2024-10-28_19-40-50_BPM_ring.png
|
 |
|
1069
|
Wed May 14 08:07:26 2025 |
KD, HG | Under Process | Shift summary | LI | Opt | Linac Commissionning |
|
shift du 14 mai 2025 | |
8h: mise en chauffe à distance (modulateur, frigo/chiller, laser)
10h30: on a du faisceau atténuateur à 260pas pour 100pC.
Nouveau point cathode : [H,V] = [4.81, 3.62]
11h: stockage dans l'anneau avec la recette 50MeV de 100pC
Problem de lecture des charges (Wavecatcher) quand les kickers sont en marche (trig sur du bruit). Le problème n'existe pas quand le kicker est éteint.
17h: Variation de la charge uniquement (machine non touchée). Charge max ~ 500pC pour iris à 1.3mm
==> Stockage ok à 500pC (sans rien faire), il faut optimiser et regarder plus en détail car il n'y a pas un facteur 5 sur la charge stockée (juste 3).
18h : la charge (GUN) oscille, cf plot.
18h30 : soleno scans à differentes charges : 100 pC / 500 et 600 pC (max)
**** Programme ****
refaire du faisceau et retrouver le point de fonctionnement à 100pC avec la nouvelle cathode |
| Attachment 1: Probleme_charge.png
|
 |
| Attachment 2: Probleme_charge2.png
|
 |
| Attachment 3: stockage_100pC.png
|
 |
| Attachment 4: stockage_250pC.png
|
 |
| Attachment 5: stockage_500pC.png
|
 |
| Attachment 6: Charge_oscillation.png
|
 |
| Attachment 7: Size_vs_SolenoScan_18-25-30.png
|
 |
| Attachment 8: Size_vs_SolenoScan_18-30-49.png
|
 |
| Attachment 9: Size_vs_SolenoScan_18-35-05.png
|
 |
|
797
|
Thu Sep 28 08:44:37 2023 |
KD, DN, IC, VM, VK | Fixed | Shift summary | LI | TL | Ring | Opt | Linac Commissionning | Ring Commissioning |
|
run du 28 septembre 2023 | |
8h40: mise en chauffe de la machine (modulateur, chiller, laser, cyclage aimants)
==> La clim de la casemate a été redémarrer ce jour : quelqu'un avait déverouillé manuellement la régulation et éteint le groupe froid à l'extérieur (Sabotage ?) Désecente de la température de la casemate pendant la journée, de 25°C à 21°C
*** Programme ***
- injection dans l'anneau et obtenir un stockage stable
* evaluation des performances de stockage
- stocker de la puissance dans la cavité de facon stable
- trouver les rayons X en mode désynchronisé
- synchroniser la cavité FP et l'anneau
- trouver les rayons X en mode synchrone
Scan charge phase
Align on QP3 with steerer
load recipie 08/28 16.45.
Kevin align laser 5.24; 2.91
No storage.
Problems found: timing of pulsed elenets was wrong, kicker was not triggered.
10.51 Storage
Modulator V : 1100 . pour éviter un point autour de 1.64dB de la séction qui "claque" beaucoup
Problems with timing system, jitter between ring and linac. Kevin intervention(15.10) 2x times lower jitter.
Laser phase and energy manual tuning along the run , each 10 mins.
Work on the orbit at 500.25, established good storage, stable orbit, tune = 3.17 .
Recipie: # 500.25 MHz MCF 0.02 TL BPM2 4mm Att 1.842 Good storage At IP BPM readings x =3 mm y = -2
file: recipe_recipe_LI_TL_RI_all_20230928_15_43_43.txt
# 500.25 MHz MCF 0.02 TL BPM2 4mm Att 1.842 Good storage At IP BPM readings x =3 mm y = -2
LI/PS/COL.01/currentSetpointPM : <type 'float'> : 63.58
LI/PS/COL.02/currentSetpointPM : <type 'float'> : 220.0
EL/PS/QP.01/currentSetpointPM : <type 'float'> : 2.7
EL/PS/QP.02/currentSetpointPM : <type 'float'> : -3.8
EL/PS/QP.03/currentSetpointPM : <type 'float'> : 6.4
EL/PS/QP.04/currentSetpointPM : <type 'float'> : 5.6
EL/PS/QP.05/currentSetpointPM : <type 'float'> : -4.7
EL/PS/QP.06/currentSetpointPM : <type 'float'> : 0.0
EL/PS/QP.07/currentSetpointPM : <type 'float'> : -3.0
LI/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -1.26361302428
LI/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.181343322373
LI/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 0.298179622745
LI/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 0.0577819455818
EL/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 0.0
EL/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/QP.01/currentSetpointPM : <type 'float'> : -0.08
TL/PS/QP.02/currentSetpointPM : <type 'float'> : 3.5
TL/PS/QP.03/currentSetpointPM : <type 'float'> : -3.4
TL/PS/QP.04/currentSetpointPM : <type 'float'> : 2.11
TL/PS/QP.05/currentSetpointPM : <type 'float'> : 1.53
TL/PS/QP.06/currentSetpointPM : <type 'float'> : -4.2
TL/PS/QP.07/currentSetpointPM : <type 'float'> : 4.0
RI-C1-C2/PS/SP.03/currentSetpointPM : <type 'float'> : -2.10232230226
RI-C1/PS/QP.01/currentSetpointPM : <type 'float'> : 2.98190476016
RI-C1/PS/QP.02/currentSetpointPM : <type 'float'> : -1.38381809221
RI-C1/PS/QP.03/currentSetpointPM : <type 'float'> : -1.37381809221
RI-C1/PS/QP.04/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C1/PS/QP.05/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1/PS/QP.06/currentSetpointPM : <type 'float'> : 1.14141079069
RI-C1/PS/QP.07/currentSetpointPM : <type 'float'> : 5.73197488985
RI-C1/PS/QP.08/currentSetpointPM : <type 'float'> : -4.95095010278
RI-C1/PS/QP.09/currentSetpointPM : <type 'float'> : -4.95595010278
RI-C1/PS/QP.10/currentSetpointPM : <type 'float'> : 5.73697488985
RI-C1/PS/QP.11/currentSetpointPM : <type 'float'> : 1.14641079069
RI-C1/PS/QP.12/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1-C2/PS/SP.01/currentSetpointPM : <type 'float'> : -1.05429041718
RI-C2/PS/QP.01/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C2/PS/QP.02/currentSetpointPM : <type 'float'> : -1.36881809221
RI-C2/PS/QP.03/currentSetpointPM : <type 'float'> : -1.37881809221
RI-C2/PS/QP.04/currentSetpointPM : <type 'float'> : 2.97690476016
RI-C2/PS/QP.05/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C2/PS/QP.06/currentSetpointPM : <type 'float'> : 1.14641079069
RI-C2/PS/QP.07/currentSetpointPM : <type 'float'> : 5.72197488985
RI-C2/PS/QP.08/currentSetpointPM : <type 'float'> : -4.94595010278
RI-C2/PS/QP.09/currentSetpointPM : <type 'float'> : -4.95095010278
RI-C2/PS/QP.10/currentSetpointPM : <type 'float'> : 5.73197488985
RI-C2/PS/QP.11/currentSetpointPM : <type 'float'> : 1.14141079069
RI-C2/PS/QP.12/currentSetpointPM : <type 'float'> : -3.35285061025
RI-C1-C2/PS/SP.02/currentSetpointPM : <type 'float'> : 4.28000131
TL/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : 0.0
TL/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : -5.0
TL/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : 1.0
TL/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : -4.075
TL/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : -4.508
TL/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : 4.471
TL/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 8.107
TL/PS/DPI.01/currentSetpointPM : <type 'float'> : 7.8
RI-C1/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : -0.348755052057
RI-C1/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -6.03938458444
RI-C1/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : 1.81059006906
RI-C1/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : -2.8368718
RI-C1/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : -4.1069025178
RI-C1/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : 2.91014798531
RI-C1/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : -1.59301651177
RI-C1/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 2.76102662193
RI-C1/PS/STR.05-V.01/currentSetpointPM : <type 'float'> : -0.699808993922
RI-C1/PS/STR.05-H.01/currentSetpointPM : <type 'float'> : -2.81346754046
RI-C1/PS/STR.06-V.01/currentSetpointPM : <type 'float'> : 0.633858774544
RI-C1/PS/STR.06-H.01/currentSetpointPM : <type 'float'> : -6.58936968674
EL/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : 0.0
EL/PS/DPI.01/currentSetpointPM : <type 'float'> : 1.5
RI-C2/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : -0.541923964033
RI-C2/PS/STR.01-H.01/currentSetpointPM : <type 'float'> : -7.62132043322
RI-C2/PS/STR.02-V.01/currentSetpointPM : <type 'float'> : -1.65386120138
RI-C2/PS/STR.02-H.01/currentSetpointPM : <type 'float'> : -2.06590600871
RI-C2/PS/STR.03-V.01/currentSetpointPM : <type 'float'> : 1.74569887902
RI-C2/PS/STR.03-H.01/currentSetpointPM : <type 'float'> : 3.15410183944
RI-C2/PS/STR.04-V.01/currentSetpointPM : <type 'float'> : -2.15975369706
RI-C2/PS/STR.04-H.01/currentSetpointPM : <type 'float'> : 2.33603780651
RI-C2/PS/STR.05-V.01/currentSetpointPM : <type 'float'> : 2.02230798878
RI-C2/PS/STR.05-H.01/currentSetpointPM : <type 'float'> : -1.51084876179
RI-C2/PS/STR.06-V.01/currentSetpointPM : <type 'float'> : -1.79544220942
RI-C2/PS/STR.06-H.01/currentSetpointPM : <type 'float'> : -4.21190265909
EL/PS/STR.01-V.01/currentSetpointPM : <type 'float'> : 0.0
RI-C1/PS/DP.01/currentSetpointPM : <type 'float'> : 159.299592181
TL/PS/DP.01/currentSetpointPM : <type 'float'> : 159.3
EL/PS/DP.01/currentSetpointPM : <type 'float'> : 160.0
TEST/HL/ThomX_PhotoCathode/Horizontal_Iris_Position_set : <type 'float'> : 5.24
TEST/HL/ThomX_PhotoCathode/Vertical_Iris_Position_set : <type 'float'> : 2.91
er/pe/inj_kick_ps/Voltage : <type 'float'> : 5580.26513672
er/pe/inj_kick_ps/Current : <type 'float'> : 5.0
er/pe/pass_sept_ps/Current : <type 'float'> : 5.0
er/pe/pass_sept_ps/Voltage : <type 'float'> : 106.125869751
|
| Attachment 1: Screenshot_from_2023-09-28_16-03-17.png
|
 |
|
1113
|
Thu Sep 4 07:38:32 2025 |
KD, DN, HG, JM | Under Process | Shift summary | Laser | Linac Commissionning |
|
shift du 4 septembre 2025 | |
7h40: mise en chauffe à distance (modulateur, frigo/chiller, laser, cyclage)
Réailgnement ligne UV Laser Photocathode
- énergie sortie laser : 245uJ
- énergie injection ligne de transport : 170uJ (avant), 220uJ (après)
- énergie sortie ligne de transport : 170uJ
- énergie sortie iris (1.3mm) : 53uJ
- énergie injection canon (iris 1.3mm, atténuateur @420pas) : 43uJ
13h30 :
on a continué à faire des mesures d'émittance à 500 pC et plusieurs valeur de Soleno.
Les résultats sont cohérents sauf pour 250 A avec une emittance qui explose en Y. les résultats sont dans today, avec un travail en off à faire pour comparer à Bmad.
D'autres mesures seront nécessaires pour conclure sur la TL.
18h : Stop
/!\ l'iris est morte et a été débranchée. Elle est réglé sur 1.3mm
**** Programme ****
- réalignement ligne UV
- déblocage de l'iris laser PhotoCathode
|
|
878
|
Mon Jun 10 13:36:25 2024 |
KD, CJ, WE, GO, VC, ND | Under Process | Shift summary | Linac Commissionning |
|
claquage et test micros | |
9h: accès sous-sol
12h: démarrage modulateur pour test micro (atténuateur à 15dB)
** Les micros sont positionné à différents endroit pour voir leur réponse (2 micros au même endroit)
sur la bride d'entrée diviseur de puissance (cf image)
sur la bride d'entrée atténuateur (cf image)
** les micros sont mis : sur la bride du diviseur, un sur la bride de l'atténuateur
** puis on fait varier l'atténuateur pour voir si ca change quelques chose. Les claquage à 5dB sont moins fréquents (toutes les minuetes) qu'à 15dB (à peine qq secondes)
** à 5Hz les claquage sont moins réguliers encore (toutes les 3mins)
*** Conclusions ***
Il semblerait que le diviseur ET l'atténuateur claquent (cf courbes à 5dB)
Il y a toujours des micros claquages (même sans interlock) visibles (cf courbe à 4dB)
|
| Attachment 1: claquage_micro_bride_entree_diviseur.png
|
 |
| Attachment 2: claquage_micro_bride_entree_attenuateur.png
|
 |
| Attachment 3: claquage_micro_bride_entree_diviseur_attenuateur.png
|
 |
| Attachment 4: claquage_micro_bride_entree_diviseur_attenuateur_zoom.png
|
 |
| Attachment 5: claquage_micro_bride_entree_diviseur_attenuateur_bis.png
|
 |
| Attachment 6: claquage_micro_bride_entree_diviseur_attenuateur_ter.png
|
 |
| Attachment 7: claquage_micro_bride_entree_diviseur_attenuateur_5dB.png
|
 |
| Attachment 8: claquage_micro_bride_entree_diviseur_attenuateur_5dB_zoom.png
|
 |
| Attachment 9: claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis.png
|
 |
| Attachment 10: claquage_micro_bride_entree_diviseur_attenuateur_5dB_bis_zoom.png
|
 |
| Attachment 11: standard_micro_bride_entree_diviseur_attenuateur_4dB.png
|
 |
|
750
|
Fri May 5 08:47:28 2023 |
KD VM VK JN SL | Under Process | Shift summary | Ring Commissioning |
|
shift du 5 mai 2023 | |
8h30 : accès casemate controlé
==> septum et kickers OFF et cavité RF OFF
==> problème cavité RF, mux 3 défaut de communication
==> impossible d'acquité les interlocks et redémarrer la cavité.
Morning restart of machine was easy for the same parameters from day before.
Problem with network was fixed by G. Philippon, it was due to the limited number of allowed ports in the new swith that was recently replaced.
Still we cannot start RF Cavity with Jean Noel. Ampli is working, but no communication of Consigne from Tango to LLRF hardware.
14.30 Cavity on, getting power.
Frequency 500.41->500.4094, and phase manual optimisation.
Power in cavity is changing from 60 kV to 80kV for 80kV setpoint.
Saving data for postprocess. Orbit correction.
Beam is stable and stored. Orbit is positive. energy is about 50.075MeV, ring dipoles 160A. Sextupoles on.
Extraction kicker started to extract just before injection.
|
| Attachment 1: Screenshot_from_2023-05-05_17-25-28.png
|
 |
| Attachment 2: Screenshot_from_2023-05-05_17-13-31.png
|
 |
| Attachment 3: Screenshot_from_2023-05-05_17-13-41.png
|
 |
| Attachment 4: Screenshot_from_2023-05-05_17-52-52.png
|
 |
| Attachment 5: Screenshot_from_2023-05-05_17-50-31.png
|
 |
|
Draft
|
Mon Feb 24 08:00:09 2025 |
KD VC VM | Under Process | Shift summary | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 24 février 2025 | |
8h: mise en chauffe de la machine (Frigo/chiller, laser, modulateur et cyclage aimants).
9H demarrage faisceau
Charge gun 110pC
10h go to the ring => optimisation Finished
Waiting from X ray
feedback injection:
/data/shared/commissioning_scripts/Linac/Alignements/feedback_linac_injection.py
/data/shared/commissioning_scripts/Linac/Alignements/feedback_ring_injection.py
15h stop machine pour check fente ligne X
17H redemarrage machine
|
|
1108
|
Thu Aug 21 08:07:06 2025 |
KD VC IC RC (VM) | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 21 aout 2025 | |
8h: mise en chauffe à distance (chiller/frigo, modulateur, laser, cyclage)
9h Start of the machine at 70 Mev, Charge 95 pC
10h Start from the previous receipt for 70 MeV (see June, 6). Beam is injected only for about 50 turns. Try to understand the problem. It seems that the energy from the injector + injection by itself does not match the saved receipt.
It was observed that the x-position at TL BPM2 sometimes changes in kind of steps (perhaps effect of regulation ?), see screenshot.
Orbit correction.
After several iterations the good storage obtained similar to June,6. The vertical orbit is flat at the IP. The receipts are saved.
We performed the vertical FPC scan. The vert beam size is 122 um. The max signal measured I3+I4 = 40k pA
We started to increase the charge to investigate the linearity in X-ray flux. Due to the problem with phtocathode laser the max charge achieved is 225 pC. The obtained results are plotted and attached (the data should be available via archivage)
Up to 225 pC the linearity is quite good.
The EL is set for 70 MeV as well and the beam is seen on the EL SST.
it was observed that the EL dipole affects the SR beam via orbit distortion. The SR orbit was recorrected to account for this effect. The receipt is saved for the whole machine.
18h STOP ThomX
*** Programme ***
- Stockage à 70MeV
- caractérisation X (taille faisceau, spectre ou autre)
difficulté à passer le modulateur à 1215V... (45mn)
Col0.1 et col0.2 en défaut
|
| Attachment 1: Screenshot_from_2025-08-21_13-59-45.png
|
 |
| Attachment 2: Screenshot_from_2025-08-21_14-38-23.png
|
 |
| Attachment 3: Screenshot_from_2025-08-21_17-06-02.png
|
 |
| Attachment 4: Screenshot_from_2025-08-21_14-29-45.png
|
 |
| Attachment 5: Xray_vs_GunCharge_1png.png
|
 |
| Attachment 6: VerticalScanSynch.png
|
 |
| Attachment 7: Screenshot_from_2025-08-21_13-59-55.png
|
 |
| Attachment 8: Screenshot_from_2025-08-21_13-58-05.png
|
 |
| Attachment 9: 2025-08-21_17_36_40_el_dg_sst_01-ccd_01_RAW.png
|
 |
| Attachment 10: Screenshot_from_2025-08-21_13-36-11.png
|
 |
| Attachment 11: Screenshot_from_2025-08-21_17-57-58.png
|
 |
|
1112
|
Wed Sep 3 07:47:42 2025 |
KD VC HG JM | Under Process | Shift summary | Linac Commissionning |
|
shift du 3 septembre 2025 | |
7h47: mise en chauffe en remote (modulateur, frigo/chiller, laser, cyclage)
8H50 demarrage machine
load recette godd_20250821_17_14_40
faisceau ligne dispersive (phase canon 272° phase section 247° DP.01 253.77A image 2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW)
quad scan
10H Moddulateur en standby PPS PA exploi OFF
14h30: Mesures d'émittance à QP3 pour différentes conditions de charge 100pC et 170 pC, fits et scans dans le dossier today
Soucis Iris : Moteur en erreur, valeur 1.35 mm (pas sûre ...)
but des mesures : vérifier le code Matlab (Viktor)
A faire : Xcheck avec le code py (Hayg)
Autre aspect : faire attention aux images saturées, ça change le scan, et donc l"emittance calculée.
17h45 : fin du shift, Kevin va venir voir le shutter.
==> il faut réaligner la ligne UV, charge max < 200pC |
| Attachment 1: 2025-09-03_09_40_36_tl_dg_sst_02-ccd_01_RAW.png
|
 |
|
1141
|
Thu Oct 23 07:45:25 2025 |
KD RC VC MJ | Under Process | Shift summary | LI | TL | LE | Ring | Linac Commissionning | Ring Commissioning |
|
shift du 23 octobre 2025 | |
7h45: mise en chauffe en remote (modulateur, laser, frigo/chillers, cyclage)
8h45 : mise en route Modulateur
recette "50MeV_smallorbit_with EL_20251016_19_49_25.txt" fichier VIDE
pB RI-C2 QP2 => serrage des cosses sur le Qpole +redemarrage serveur => résolu
alignement Quad
Feedback ring injection ON
RF ring cavity 150KV (phase 3° freq 500.100450MHz)
10h26 RF Gun laser state went 'Fault'
La streak a ete "importee" en sdc, elle est maintenant pilotable en sdc
Programme : spectres a different temps d'extraction
** Calib du CdTe avec feuille de Sn
** Mapping avec Script fwhm 25 positions CdTe (-40 a +40 environ)
** Prise de spectres autour de la position zero mapping
** Prise de spectres a 12.5 Hz a differents temps d'extraction (de 10 ms a 70 ms)
** Prise de spectres a 1.5 Hz a differents temps d'extraction (10, 50 et 100 ms)
|
|
Draft
|
Thu Nov 13 08:00:59 2025 |
KD MJ VM HG | Fixed | Shift summary | LI | TL | LE | Ring | Opt | Linac Commissionning | Ring Commissioning |
|
shift du 13 novembre 2025 - spectres a differentes valeurs de bpmTL2_X | |
Apres que Kevin a regle tous les problemes synchro signal bpm etc etc etc
L'interface SST ne fonctionne pas - URGENT ==> probleme resolu
Libera 2 et 4 reboote une 2eme fois ...
Faisceau dans l'anneau
15h15 toujours impossible de locker la cavite FP, pour une raison inconnue ==> Shift reporte
Several manual BBA steps were performed in the Hor. plane for Ri-C1/QP01 to find the offset change in Ri-C1/BPM01.
16h46 Stop ThomX
|