Entry   VC, IC, VK, VM; Commissioning 10x
Demmarrage machine à 8h45

IHM ThomX warm-up

8H55 Chauffage klystron, Frigo  Ampli laser
Entry   VC DN ND, IC, VM, KD, AS RC , VK...; commitionning 27x
8h45 demarrage chauffage Modulateur et frigo

Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible  (pc laser demarré par Kevin)

8h50 demarrage chiller et cycling magnet   => OK
Entry   RC VC MJ ; commitionning 2024-01-31_16_01_44_el_dg_sst_01-ccd_01_RAW.png2024-01-31_16_02_12_tl_dg_sst_01-ccd_01_RAW.png
Chauffage mod 11h

demarrage machine 14H

on suit le star faisceau step par step
Entry   VK VC HG SC ME; commitionning 
8h10 rémarrage machine chauffage klystron frigo et chiller

pB DS   calc/er_sy/rac.17-elr.01-rdp.0X.Y  (tous les DS redpy baie 17 )

Cycling ok
Entry   Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 1 16:30:01 2024; Complement de la fin du elog 837 
En complement de la fin de l'entree elog 837 ou il est ecrit a la fin :

on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie
faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2   sans succes
Entry   Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024; Shift du 2 février 2024 Screenshot_2024-02-02_12-05-19.png
La clé PA est resté enclenchée hier. Il faut penser à la tourner avant de partir (demande de Maher)

8h15 : Mise en chauffe machine (aimants, chillers, laser, modulateur).

Pas de mesure de charge (WAC, délai ?)
Entry   VC MJ KD; commissionning 7x
8h45 demarrage machine

modulateur frigo ampli laser chiller et cyclage des aimants

IHM warm-up done (fin chauffage modulateur (9h50)
Entry   KD, HG, VC, RC; shift du 8 février 2024 RF_PiCanon.pngScreenshot_2024-02-08_11-41-09-BPMtldgbpm.02-lib0.2.png
8h20 : Mise en chauffe de la machine pour shift de la journée

Charge Phase : 

Remarque sur les scan charge phase pour trouver l'energie Max:

en fonction des outils utilisés et des consignes des experts de dynamique faisceau, le choix de la phase à Energie max varie de
Entry   VC, VK, VM, IC, ND; redemarage machine après élongation anneau scan_Laser_vs_RF_phase_2024_02_26_10_41.pngScreenshot_from_2024-02-26_12-13-46.png
9H démarrage machine en mode linac

chauffage klystron ok

chiller ok
Entry   KD, VK, VM; run du 27 février 2024 
9h: mise en chauffe de la machine (chillers, laser, aimants, modulateur)

Mohamed regle la cavité RF sur 500.06MHz
Entry   VC, VM, VK; Commintionning RING health_check_2024_02_28_08_50.pngScreenshot_from_2024-02-28_11-47-13.pngScreenshot_from_2024-02-28_15-34-51.pngScreenshot_from_2024-02-28_16-50-50.png
demarrage machine 8H50

Alim

EL/PS/DPI.01 demarrage à la main (ATK pannel)
Entry   VK, VM, IC; Recomissioning of the SR, search for the revolution frequency  13x
8h50 Start of the machine

Laser amplifier was somehow OFF. Very strange situation and not clear why it happen. To be understood.

Call Viktor, who came and start the laser.
Entry   VK, VM, IC on Thu Feb 29 ; Recomissioning of the SR, search for the revolution frequency  Screenshot_from_2024-02-29_12-15-58.pngScreenshot_from_2024-02-29_14-27-36.pngScreenshot_from_2024-02-29_11-27-21.png
Start of the machine 9h

Optimization of the beam transport to the Ring.

Work on the lattice of the Ring and search for the revolution frequency.
Entry   Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024; Recomissioning of the SR, search for the revolution frequency  
08h50 Start up of the machine

- Problem  with the vaccum, the valves around the RF cavity are down. Eric came. He checked and the problem is with the cable. it should
be changed. Intervention is ongoing.
Entry   IC, VM, VK; Restart and tuning of the injector Screenshot_from_2024-03-05_15-13-48.png
10h Intervention to repair the water leakage. It was repaired.

New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.

12h Warm up of the machine
Entry   IC, VM, VK; X-ray generation Screenshot_from_2024-03-06_10-56-53.pngScreenshot_from_2024-03-06_17-18-12.pngScreenshot_from_2024-03-06_15-08-24.png
8h50 Warming up the machine

10h start the beam

Tuning the injector
Entry   VK, VM, IC; Recomissioning of the SR, search for the X-rays Screenshot_from_2024-03-07_09-02-36.png
8h50 Warming up the machine

Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.

Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure.
Entry   ND, MEK; Conditionnement section condj1.pdf
8:45 Impossible de passer le modulateur en standby.

Probleme d'eau.

Appel Dalkia
Entry   KD; Conditionnement section 16/05 
8h: démarrage Klystron, frigo et chiller
Entry   MEK, RC,VC, VK; Conditionnement section 16/05 vide_cond_16_may_.png
conditionnement démmare à 7.4 dB atténuation section ( ) pour une largeur impulsion RF 1µs et fréquence de repetition
de 1Hz

10h : disjonction du PA @ Att=5.6dB (Pis = 7 MW)