VC, IC, VK, VM; Commissioning 10x
|
Demmarrage machine à 8h45
IHM ThomX warm-up
8H55 Chauffage klystron, Frigo Ampli laser |
VC DN ND, IC, VM, KD, AS RC , VK...; commitionning 27x
|
8h45 demarrage chauffage Modulateur et frigo
Pb sur le serveur li/opt.02-las.01-asp.01 connection au device impossible (pc laser demarré par Kevin)
8h50 demarrage chiller et cycling magnet => OK |
RC VC MJ ; commitionning 
|
Chauffage mod 11h
demarrage machine 14H
on suit le star faisceau step par step |
VK VC HG SC ME; commitionning
|
8h10 rémarrage machine chauffage klystron frigo et chiller
pB DS calc/er_sy/rac.17-elr.01-rdp.0X.Y (tous les DS redpy baie 17 )
Cycling ok |
Entered by Marie Jacquet from 134.158.89.45 on Thu Feb 1 16:30:01 2024; Complement de la fin du elog 837
|
En complement de la fin de l'entree elog 837 ou il est ecrit a la fin :
on effectue un scan de de la phase de la section LIL avec un courant dipole de 159.3A (ie
faisceau 50MHz) sur 360° pour retrouver le faisceau sur le BPM et l'ecran TL SST2 sans succes |
Entered by Super Team from 134.158.195.141 on Fri Feb 2 08:16:31 2024; Shift du 2 février 2024
|
La clé PA est resté enclenchée hier. Il faut penser à la tourner avant de partir (demande de Maher)
8h15 : Mise en chauffe machine (aimants, chillers, laser, modulateur).
Pas de mesure de charge (WAC, délai ?) |
VC MJ KD; commissionning 7x
|
8h45 demarrage machine
modulateur frigo ampli laser chiller et cyclage des aimants
IHM warm-up done (fin chauffage modulateur (9h50) |
KD, HG, VC, RC; shift du 8 février 2024 
|
8h20 : Mise en chauffe de la machine pour shift de la journée
Charge Phase :
Remarque sur les scan charge phase pour trouver l'energie Max:
en fonction des outils utilisés et des consignes des experts de dynamique faisceau, le choix de la phase à Energie max varie de |
VC, VK, VM, IC, ND; redemarage machine après élongation anneau 
|
9H démarrage machine en mode linac
chauffage klystron ok
chiller ok |
KD, VK, VM; run du 27 février 2024
|
9h: mise en chauffe de la machine (chillers, laser, aimants, modulateur)
Mohamed regle la cavité RF sur 500.06MHz |
VC, VM, VK; Commintionning RING   
|
demarrage machine 8H50
Alim
EL/PS/DPI.01 demarrage à la main (ATK pannel) |
VK, VM, IC; Recomissioning of the SR, search for the revolution frequency 13x
|
8h50 Start of the machine
Laser amplifier was somehow OFF. Very strange situation and not clear why it happen. To be understood.
Call Viktor, who came and start the laser. |
VK, VM, IC on Thu Feb 29 ; Recomissioning of the SR, search for the revolution frequency  
|
Start of the machine 9h
Optimization of the beam transport to the Ring.
Work on the lattice of the Ring and search for the revolution frequency. |
Entered by Super Team from 134.158.195.141 on Mon Mar 4 08:57:45 2024; Recomissioning of the SR, search for the revolution frequency
|
08h50 Start up of the machine
- Problem with the vaccum, the valves around the RF cavity are down. Eric came. He checked and the problem is with the cable. it should
be changed. Intervention is ongoing. |
IC, VM, VK; Restart and tuning of the injector
|
10h Intervention to repair the water leakage. It was repaired.
New problem with vacuum pomp is found in the ring. The two problems are due to the water leakage. Intervention is ongoing.
12h Warm up of the machine |
IC, VM, VK; X-ray generation  
|
8h50 Warming up the machine
10h start the beam
Tuning the injector |
VK, VM, IC; Recomissioning of the SR, search for the X-rays
|
8h50 Warming up the machine
Problem with the vaccum around the RF cavity (see screenshot attached). Intervention of vacuum team is needed.
Mohamed is installing the powermeter to monitor the incomingt RF power for the accelerating structure. |
ND, MEK; Conditionnement section
|
8:45 Impossible de passer le modulateur en standby.
Probleme d'eau.
Appel Dalkia |
KD; Conditionnement section 16/05
|
| 8h: démarrage Klystron, frigo et chiller |
MEK, RC,VC, VK; Conditionnement section 16/05
|
conditionnement démmare à 7.4 dB atténuation section ( ) pour une largeur impulsion RF 1µs et fréquence de repetition
de 1Hz
10h : disjonction du PA @ Att=5.6dB (Pis = 7 MW) |