ID Date Author Status Type Category Important Subject Icon Text Attachments
  Draft   Tue Nov 26 07:53:39 2024 MJ RC KDUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 26 novembre 2024 8h : mise en chauffe en remote (laser,
modulateur, frigo, chiller, cyclage)

 2024-11-26_12_22_06_el_dg_sst_01-ccd_01_RAW_1.png 
  967   Fri Nov 22 11:18:28 2024 KD, RCUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 22 novembre 2024 9h30 : mise en chauffe

intervention casemate pour alignement
laser et nettoyage optique.
 TL_BPM4_locked.dat 
  966   Fri Nov 22 11:04:39 2024 KDNew SolutionLinacLI laser PC  Mesure de ce matin et réalignement:

sortie laser : 298uJ

sortie ligne de transport : 209uJ
 2024-11-22_11_07_23_li_op_las_02_RAW.png2024-11-22_11_07_57_li_op_las_02_RAW.png 
  965   Thu Nov 21 08:27:15 2024 VM Entered by Super Team from 134.158.195.141 on Thu Nov 21 08:26:43 2024Under ProcessInfoRing Commissioning   08H25 Start ThomX

09H45 HV is 'ON'

09h49 Breakdown in the RF Gun
  
  964   Tue Nov 19 08:20:29 2024 MJ VC KD RC DNUnder ProcessShift summaryLinac Commissionning Shift summary 19/11/2024 icon3.gif 8h20 demarrage machine

iris 1.3mm
att 440
 YAG_TL3_beam.pnginjection_ring.pngFluo_det.png 
  963   Fri Nov 15 12:13:42 2024 Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024Not FixedInfoTL Charge excess in the TL By looking at the BPM transmission tool
one can see that there is more charge on
TL/BP.03 than on TL/BPM.02 (see attached
 Screenshot_from_2024-11-15_12-12-55.pngScreenshot_from_2024-11-15_12-12-46.png 
  Draft   Fri Nov 15 07:56:03 2024 IC, VK, VM, ND Shift summary  Ring studies, MRSV 07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V
 36x 
  961   Thu Nov 14 09:21:51 2024 Entered by Viktor Soskov from 134.158.195.153 on Thu Nov 14 09:21:36 2024FixedInfoLaser Etat laser Bonjour, rien n'a change au faisceau
laser (distribution reste le meme,l'energie
sur la cathode =60mkJ, Iris = 1.3mm, Att
  
  960   Thu Nov 14 08:33:34 2024 Entered by Super Team from 134.158.195.141 on Thu Nov 14 08:33:03 2024Under ProcessInfoLinac Commissionning   08h30 Start ThomX

10h00 HV is 'ON'

11h03 RF Gun phase 230 dg. Att.
 15x 
  959   Wed Nov 13 08:26:05 2024 VCUnder ProcessShift summaryLinac Commissionning Shift summary 13/11/24 demarrage machine 8h30
demarrage puissance RF
Phase charge max 286° Qmax 103pC
 Q_transport_vs_Soleno.pngQ_transport_vs_Soleno_Align_917_1.pngQ_transport_vs_Soleno_Align_917_2.pngICT_Att_320_to_400.pngSPSum_LI_Att_320_to_400.png 
  958   Tue Nov 12 10:36:39 2024 Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 12 10:36:24 2024FixedInfoLaser Salle laser ThomX Bonjour , l'intervention du Dalkia
sur le CTA de la salle laser est terminee.

Viktor.
  
  957   Tue Nov 12 08:12:06 2024 MJ KD VCUnder ProcessShift summaryLinac Commissionning shift du 12 novembre 2024 8h10 : mise en chauffe en remote (modulateur,
laser, chillers).

redemarrage serveur camera UV
  
  956   Fri Nov 8 09:35:41 2024 IC, VK, JNUnder ProcessShift summaryRing ring studies 8h50 Start of the modumator and all subsystems

Beam studies.

Orbit Correction.
 13x 
  955   Thu Nov 7 08:53:22 2024 IC, VK, VM, JNUnder ProcessShift summaryRing   8h50 Start of the modumator and all subsystems

PC client 1 was frozen => we
restarted
 6x 
  954   Wed Nov 6 08:06:51 2024 VC MJUnder ProcessShift summaryLinac Commissionning shift  demarrage chauffage 8h
autorisation PSS zone modulateur 
interdite => il faut venir valider la
 BPMLI_align_photocathode_13h15.pngBPMLI_align_photocathode_13h56.pngLaser_sur_cameraUV_16h19.png 
  953   Tue Nov 5 17:30:10 2024 Entered by Viktor Soskov from 134.158.195.153 on Tue Nov 5 17:29:48 2024FixedInfoLaser Laser-cathode Bonjour, le laser (miroirs du parcours
optique) a ete realigne.

L'etat actuel: l'enrgie
  
  952   Tue Nov 5 10:09:35 2024 SC VCUnder ProcessShift summaryLinac Commissionning shift linac demarrage modulateur 9H
erreur vanne acquitée
10H intervention Viktor sur le laser
  
  951   Thu Oct 31 08:19:25 2024 KDn Dupraz from 109.222.35.58 on Thu Oct 31 08:19:12 2024Under ProcessShift summaryRing Commissioning shift du 31 octobre 2024 8h15: mise en chauffe en remote (modulateur,
laser, chiller, Cycling)

Tuning of the linac and injection
 Screenshot_from_2024-10-31_13-37-11.pngScreenshot_from_2024-10-31_12-07-13.pngclosed_orbit_31102024.png 
  950   Wed Oct 30 11:33:04 2024 VM, IC, VKUnder ProcessInfoLI | TL | LE | Ring   9h25 Start ThomX

11h20 HV on, linac RF OK, but there
is no laser on the cathode. Trying to fix.
 6x 
  948   Tue Oct 29 10:31:45 2024 HG, SCUnder ProcessInfoLinac Commissionning Etude faisceau linac 9h30 : Mise en chauffe

10h31 : mise en route faisceau

On se place à 0 dB,
 Soleno_Align_noCol1.png 