  435   Mon Apr 11 12:09:18 2022 Mo/JNC/CB Shift summaryLinac Commissionning Demarrage 

12h00 démarrage modulateur et chillers, fermeture casemate

15h : démarrage laser

pb serveur camera via IHM SST à redémarer laser y compris

aquisition image laser

redémarrage IHM Rf pour avoir les redpitaya

tout est OK maintenant, on peut commencer le shift

 

 

 

  437   Mon Apr 11 16:57:32 2022 Mo/JNC/CB Shift summaryLinac Commissionning RE: Demarrage 

Pour ce qui est de la caméra laser, l'interface image_laser ne gère que l'affichage, donc si le server est éteint il faut l'allumer au préalable. Pour ce faire plusieurs solutions :

  • Astor:
    • taper "astor" sur un terminal
    • aller dans divers/srv_4 (caméra)
    • clic droit sur LimaCCDs/ccd2-laser
    • start server
  • IHM_astor_server
    • ouvrir "DS restart" depuis PlateformeIHM
    • Taper "limaccds/ccd2-laser" (nom du server) ou " li/op/las.02" (nom DS)
    • cliqué sur "check server state"
      • Si le seveur est "None" ou "Off", cliquez sur "Start" (ou "Force start" si ça ne suffit pas à l'allumer)
      • Si le serveur est "ON" ou en erreur cliquez sur "Stop" (ou Froce stop si ça ne suffit pas à passer en None). Puis repasser au point au-dessus

Tant qu'il y a un bouton bleu cela veux dire que l'IHM travaille, ne pas appuyer 50 fois, et attendre qu'elle ait fini avant de demander autre chose !

  • Health_check : (C'est le plus simple !)
    • ouvrir "Health check" depuis PlateformeIHM
    • cliquer sur : Laser/Camera_UV
    • cliqué sur "server" lance "IHM_astor_server" avec le nom du DS déjà fournir
    • voir le dernier point d'IHM_astor_server au-dessus

Ceci est valable quel soit le DS à démarrer, SAUF tous les DS CALC qui sont pour l'instant a démarrer manuellement et peut-être quelque autre très particulier.

 

Enfin, pour l'IHM_SST, elle gère toute seule le démarrages des serveurs, mais ça prend un peu de temps (~30s pour que le premier bouton "show caméra" ne soit plus rouge)
Si au bout de 2-3min tous les boutons "show camera" sont encore rouges, la il y a surement un problème. Essayé le bouton "restart server" et si ça ne marche toujours pas, il vaut mieux démarrer les serveurs a la main et relancer une interface SST.

Mo/JNC/CB wrote:

12h00 démarrage modulateur et chillers, fermeture casemate

15h : démarrage laser

pb serveur camera via IHM SST à redémarer laser y compris

aquisition image laser

redémarrage IHM Rf pour avoir les redpitaya

tout est OK maintenant, on peut commencer le shift

 

 

 

 

  508   Wed Jul 13 12:00:19 2022 Mo Shift summaryRF Anneau   

12h00 Arret test modulateur et départ de l'Ingé. de Scandinova

Ouverture de la casemate

  733   Tue Apr 11 22:34:19 2023 Marie Vincent Noureddine Jean-Noel Shift summaryLinac Commissionning   

Debut vers 16h

Passage section avec Isol=200, 1.7 db, ph=110

Avec script alignement QUADS de Kevin

Alignement Q1 avec strLI1                        ---> H = -1.29  V= 0.52

Alignement Q3 avec StrTL1 (et Q1 = 1A)   ---> H = -2.44   V = -0.33

       "          "     "       "        (et Q1 = 0)     ---> H = -3.64    V = 0.12

Alignement Q3 avec StrLI2   (et Q1 = 0)      ---> H = -0.06   V = 0.01    (ca semble pas fonctionner correctement ... a reverifier)

     "            "    "         "        (et Q1 = 1)      --->  H = -0.1  V = 0.01     (ca semble pas fonctionner correctement ... a reverifier)

 

On continue SANS StrTL1, i.e. :

StrLI1H = -1.29   StrLI1V = 0.52 StrLI2H = -0.1 StrLI2V = 0.01

Passage dipole 153.9 A, Q1=-1.2   Q2=3.1   Q3=-1.2  Idip=180  -  Min dispersion pour ph_LIL=106

Images dans SST_TL2_sol180_min_disp

Sans toucher aux quads, dipole=0, image sur SST_TL1 dans SST_TL1_sol180_min_disp

Idip = 190 (toujours sans toucher aux quads)

Images dans SST_TL2_sol190_min_disp

dipole=0, image sur SST_TL1 dans SST_TL1_sol190_min_disp

 

Intention de Quad scan de Q3 (avec Q1=-1.2  Q2=3.1) pour I_dip=180 puis I_dip= 190

--->  scan de -8 a +2 faisceau ok dans cette gamme (le faisceau se deplace beaucoup beaucoup sur SST_TL1 lorsque Q3=-8 a +2 , l'alignement avec STRLI 1 et 2 n'est pas bon je pense)

script Quad scan de Christelle ne marche pas (erreur en rouge, je ne sais plus ce que dit cette erreur)

 

Parallelement : Prises de donnees oscillo

1)  Pilote   -  Klystron  -  Phase pilote/Klystron

2)  Pilote   - PA   -   Phase pilote/PA

et PiS + BPMs en meme temps.

---> A traiter (le faisceau sur BPMTL2 etait hyper bruite et "sautait" pendant toute cette prise de donnees)

Fin vers 20h30

  1164   Fri Dec 5 14:48:46 2025 Marie Julien Hayg Sophie Shift summaryLI | TL | LE | Ring Matching ring-TL - Recherche des bons twiss pour la TL 

Programme shift : etudes matching anneau-TL - Recherche param twiss TL

Valeurs ideales TL "de Julien" : betaX = 36   betaY = 36   alphaX = -4.5   alphaY = -4.5  ( = figure of merit tres petit)

==================================================================

Mesures param twiss Q1 (quad scan Q1) - charge ~ 100 pC - 50 MeV

**** Soleno = 230 

   Compresseur = 55000
       emitX = 1.8 betaX  = 22    alphaX = -7.5
       emitY = 1.5   betaY = 7    alphaY = -1.4

   Compresseur = 45000
       emitX = 1.7   betaX = 14    alphaX = -5.5
       emitY = 1.2   betaY =  4     alphaY = -1.1

   Compresseur = 65000
       emitX = 2.3   betaX = 25    alphaX = -9
       emitY = 3.2   betaY =  7     alphaY = -1.6

   Compresseur = 95000
       emitX = 2.6   betaX = 11    alphaX = -4.
       emitY = 3.3   betaY =  9     alphaY = -2.

**** Compresseur = 95000 

Soleno = 220
       emitX = 7  betaX  = 5    alphaX = -2
       emitY = 5   betaY = 4    alphaY = -0.5

Soleno = 200
       emitX = 13  betaX  = 10    alphaX = 0.85
       emitY = 10   betaY = 35    alphaY = 0.6

Soleno = 240
       emitX = 7.4  betaX  = 18    alphaX = -4.3
       emitY = 12   betaY = 50    alphaY = -6
    SIMU matching : merit = 9

Soleno = 235
       emitX = 2.6  betaX  = 14    alphaX = -4.
       emitY = 5.4   betaY = 21    alphaY = -3.6

Soleno = 238
       emitX = 3.8  betaX  = 18    alphaX = -4.3
       emitY = 7     betaY = 34    alphaY = -5.2
    SIMU matching : merit = 24

Soleno = 245
       emitX = 8.8  betaX  = 30.4    alphaX = -6.5
       emitY = 26   betaY  = 81.6    alphaY = -8.5

    
  SIMU matching : merit = 10^-25  ==> Q1-Q7  NO backracked sortie linac: -2.02   / 4.76  / -3.176  / 2.0    / 1.62   / -4.085 / 3.98 
                                                                            Q1-Q7 BACKTRACKED                   -1.88 /  4.74  / -3.28    / 1.99  / 1.69   / -4.03   / 3.85
 Essai de stockage : cf screenshot
   

2 Remarques : 

1) 2 figures of merit tres petites ~ 10^-20 qui donnent des valeurs de TL differentes ....

    - Valeurs ideales TL "de Julien" : betaX = 36     betaY = 36      alphaX = -4.5    alphaY = -4.5 
    - Valeurs du jour :                        betaX = 30.4   betaY = 81.6   alphaX = -6.5    alphaY = -8.5
A suivre - Trouver Bonne figure of merit + minimisation emittance .... 

2) Valeurs QUADs "QP3" utilisee dans la simu RING (quads autour de l'IP) :

QP3 SIMU julien :  - 6.7 A
QP3 REEL : 
       c1_qp8 = -6.02
       c2_qp8 = -6.03
       c1_qp9 = -6.11
        c2_qp9 = -6.0

==> ~ 0.7 A de difference  - Pour les autres quads : SIMU vs REEL sont proches.

 

Attachment 1: Screenshot_from_2025-12-05_18-26-56.png
Screenshot_from_2025-12-05_18-26-56.png
  448   Mon May 9 10:49:47 2022 MaherEntered by Super Team from 134.158.195.141 on Mon May 9 10:49:29 2022 Shift summaryLinac Commissionning   

10h50 Modulateur en chauffe, chillers en fonctionnement

  812   Mon Oct 30 09:39:05 2023 MaherNot FixedProblemInfra eau refroidissement circuit principal 

Bonjour

J'ai trouvé ce matin ( lundi 30/10 ) la pompe du circuit de refroidissement en défaut, je n'ai pas pu la redémarrer !

Maher

  Draft   Thu Jan 23 08:44:17 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   

08h41 Start Thomx: Modulator, Frigo, Laser

08h46 Start chillers, all magnets sycling

09h50 Start RF

10h55 Linac steerers are about from 22/01/2025: H [0.49 -2.94], V [-3.13 3.39] to align with QP1 - QP3

RF Gun phase is 164 dg., Sect. Att. is 2.64 dB, Sect. phase is 208 dg., Charges: -108 pC, -115 pC, -119 pC

if set QP5 through QP7 and all TL steerers 'Off' but TL/Str01-V1 (-1.6 A): TL/BPM02 X,Y 0,0; TL/BPM03 X,Y -6.0,+2.0, TL/BPM04 X,Y -6.0,+5.0

11h30 Beam is in the ring: TL/BPM02 X,Y 1.2,0.9; TL/BPM03 X,Y -4.6,+3.2, TL/BPM04 X,Y -2.7,+2.7

14h43 Good Receipt 50 MeV for X rays

14h55 FPC table scan: sigma y =140 um

15h16 FPC table scan: sigma y =124 um

16h25 X ray detector level 40000

16h57 RF 150 kV, X ray detector level 50000 (one point)

It seems that Ri-C1 STR06-V01 and  Ri-C2 STR02-V01 have wrong polarity

18h05 Breakdowns in the RF Gun, Vacuum interlock

18h10 Restored

18h20 Stop ThomX

  1005   Fri Jan 24 08:45:26 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   

08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)

Vacuum MPS off (Kevin)

Polarity of 2 vertical steerers in the ring :! ric1/str.06-v.01 and

ric2/str.02-v.01 were changed by Jean Noel, according to our request. 

11h20 HV is 'On'

RF Gun phase is 162 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg. Charges: -107 pC, -112 pC, -117 pC

14h12 FPC table scan. Sigma y = 140um (receipt from 14h14). RF 150 kV

Accelerating section phase often needs  adjasment (from 106 dg. to 112 dg. )

Trying LOCO. 

14h51 the receipt from 14h14 loaded (saved before LOCO). The FPC table at X ray max. (X photodiode reading of 470 pA ). Ramp the RF cavity to 250 kV

14h58 Slava made RCDS on X photodiode readings by adjusting vertical steerers of the ring.   X photodiode reading is 500 pA

15h04 Receipt seved. X photodiode readings reaches 522 pA.

15h15 FPC table scan. Sigma y = 128 um (receipt from 14h14). RF 250 kV

15h22 RF Gun phase is 166 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg.

Beam position at TL/BPM02 unstable from the trigger to the trigger, so the ring storage.

16h00 Going to 61.5 MeV. Sect Att. at 1.1 dB, phase 228 dg. RF at 500.04545 MHz, 50 kV TL/BPM02 X=+4mm

16h38 receipt saved. There is some storage, but orbit is wide

17h30 Optimized configuration for 61.5 MeV very good storaga => Rceipt good_20250124_17_36_24

 

 

 

 

  1006   Fri Jan 24 17:39:00 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   

08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)

Vacuum MPS off (Kevin)

Polarity of 2 vertical steerers in the ring :! ric1/str.06-v.01 and

ric2/str.02-v.01 were changed by Jean Noel, according to our request. 

11h20 HV is 'On'

RF Gun phase is 162 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg. Charges: -107 pC, -112 pC, -117 pC

14h12 FPC table scan. Sigma y = 140um (receipt from 14h14). RF 150 kV

Accelerating section phase often needs  adjasment (from 106 dg. to 112 dg. )

Trying LOCO. 

14h51 the receipt from 14h14 loaded (saved before LOCO). The FPC table at X ray max. (X photodiode reading of 470 pA ). Ramp the RF cavity to 250 kV

14h58 Slava made RCDS on X photodiode readings by adjusting vertical steerers of the ring.   X photodiode reading is 500 pA

15h04 Receipt seved. X photodiode readings reaches 522 pA.

15h15 FPC table scan. Sigma y = 128 um (receipt from 14h14). RF 250 kV

15h22 RF Gun phase is 166 dg. Att. is 0.04 dB, Sect Att. is 2.62 dB, Phase is 212 dg.

Beam position at TL/BPM02 unstable from the trigger to the trigger, so the ring storage.

16h00 Going to 61.5 MeV. Sect Att. at 1.1 dB, phase 228 dg. RF at 500.04545 MHz, 50 kV TL/BPM02 X=+4mm

16h38 receipt saved. There is some storage, but orbit is wide

17h30 Optimized configuration for 61.5 MeV very good storaga the RF cavity at 500.04545 MHz => Rceipt good_20250124_17_36_24

Orbits with and without RF are close

17h40 Stop thomx

 

 

 

 

Attachment 1: Screenshot_from_2025-01-24_17-35-38_61p5MeV.png
Screenshot_from_2025-01-24_17-35-38_61p5MeV.png
Attachment 2: Screenshot_from_2025-01-24_17-34-48_61p5MeV.png
Screenshot_from_2025-01-24_17-34-48_61p5MeV.png
Attachment 3: Screenshot_from_2025-01-24_17-34-23_61p5MeV.png
Screenshot_from_2025-01-24_17-34-23_61p5MeV.png
  999   Fri Jan 17 08:44:09 2025 MV, IC, VKUnder ProcessShift summaryRing Commissioning   

08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets

08h50 Chillers started

09h52 HV is 'On'

10h08 HV=1215V

10h25 RF Gun Phase is 153 dg., Sect Att. is 2.5 dB, Phase is 206 dg. Charges: -107 pC, -107 pC, -113 pC

10h30 Beam injected to the ring, Receipt from 16/01/2025  18:03 TL/BPM02 X=+2mm, without RF the ring orbit is low (all negative)

11h00 RF is 'On', 100kV

11h07 FR 150 kV; to minimize synchrotron oscillations TL/BPM02 X=+2 mm

11h33 Vacuum interlock, restarted

12h28 FPC table Scan

12h40 FPC table scan: sigma Y=171 um

13h33 FPC table scan: sigma Y=156 um

13h57 RF voltage set to 250kV

14h20 FPC table scan: sigma Y=179 um

14h25 The ring optics from 10-Jan-2025 11h03 loaded

Vertiacl tune studies. Steptune 0.05 several tilmes , vertical tune start to be pronounced; Tune correction towards the nominal one 0.64;

15h27 FPC table scan: sigma Y=126 um

16h00 FPC table scan: sigma Y=121 um

For all scans FPC power 90 kW, laser size was 70 um

17h35 Stop Thomx

 

Attachment 1: Screenshot_from_2025-01-17_17-26-25.png
Screenshot_from_2025-01-17_17-26-25.png
Attachment 2: Screenshot_from_2025-01-17_17-20-47.png
Screenshot_from_2025-01-17_17-20-47.png
Attachment 3: Screenshot_from_2025-01-17_16-06-37.png
Screenshot_from_2025-01-17_16-06-37.png
Attachment 4: Screenshot_from_2025-01-17_15-35-59.png
Screenshot_from_2025-01-17_15-35-59.png
Attachment 5: Screenshot_from_2025-01-17_15-06-53.png
Screenshot_from_2025-01-17_15-06-53.png
Attachment 6: Screenshot_from_2025-01-17_15-06-25.png
Screenshot_from_2025-01-17_15-06-25.png
Attachment 7: Screenshot_from_2025-01-17_14-35-44.png
Screenshot_from_2025-01-17_14-35-44.png
Attachment 8: Screenshot_from_2025-01-17_14-21-51.png
Screenshot_from_2025-01-17_14-21-51.png
Attachment 9: Screenshot_from_2025-01-17_14-20-32.png
Screenshot_from_2025-01-17_14-20-32.png
Attachment 10: FIRSTvertSCQN.png
FIRSTvertSCQN.png
Attachment 11: Screenshot_from_2025-01-17_13-44-48.png
Screenshot_from_2025-01-17_13-44-48.png
Attachment 12: Screenshot_from_2025-01-17_13-33-41.png
Screenshot_from_2025-01-17_13-33-41.png
Attachment 13: Screenshot_from_2025-01-17_13-33-32.png
Screenshot_from_2025-01-17_13-33-32.png
Attachment 14: Screenshot_from_2025-01-17_12-53-41.png
Screenshot_from_2025-01-17_12-53-41.png
Attachment 15: Screenshot_from_2025-01-17_12-36-29.png
Screenshot_from_2025-01-17_12-36-29.png
Attachment 16: Screenshot_from_2025-01-17_11-53-49.png
Screenshot_from_2025-01-17_11-53-49.png
  Draft   Fri Jun 6 08:17:31 2025 MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025Under ProcessShift summaryRing Commissioning   

08h15 ThomX was started; Modulator, Frig, Laser

08h21 Chillers were started, cycling all magnets

09h40 HV is 'ON'

Scans of phase charge were performed

10h22 Beam in the ring, receipt from 20250605_17_33_45. Linac steerers: H [0.36 -2.55], V [-2.36 2.66], Phases: RF Gun  165 dg., Sect. 214 dg., Sect Att. 2.6, TL/BPM2 X=0, Charges (BPMs): -114 pC, -113 pC,  -125 pC, -125 pC

MRSV: Hor. Std = 19.2812 pix, Vert. Std = 13.8814 pix

11h40 Going to 70 MeV. Sect. Att. 0.228, Phase 237 dg., RF Gun Phase 150 dg.

 

At F RF cavity 500.0328 MHz interlock on water cooling. Fixed by JN.

Trying to find horizontal tune.

At 70 MeV the MRSV camera saturated.

Work on the orbit correction.

Vertical scan with FPC. Sigma _y = 

The receipy is saved and can be used for the spectrum measurements. Further studies to be continued if needed.

FPC Table Vertical Scan: sigma Y =132 um

17h02 Stop ThomX

Attachment 1: ThomX_PhaseChargeScan20250606.png
ThomX_PhaseChargeScan20250606.png
Attachment 2: ThomX_FPC_TableVerticalScan20250606.png
ThomX_FPC_TableVerticalScan20250606.png
  469   Wed Jun 1 11:02:31 2022 MOEntered by Super Team from 134.158.195.141 on Wed Jun 1 11:02:17 2022 InfoRF D1 remplacement SF6 

11h00 Le SF6 du réseau est vidé, remplacé par SF6 neuf

  613   Thu Oct 27 09:13:49 2022 MO/SC/MJ LinacLinac Commissionning mesure energie impossible (licence) 

MO : Mise en route modulateur et refroidissement

Pas possible de mesurer l energie avec le scipt habituel . Message suivant :

License checkout failed.
License Manager Error -4
Maximum number of users for Image_Toolbox reached.
Try again later.

Troubleshoot this issue by visiting:
https://www.mathworks.com/support/lme/R2018b/4

Diagnostic Information:
Feature: Image_Toolbox
License path:
/data/operateur.thomx/.matlab/R2018b_licenses:/home/debian/R2018B/licenses/license.dat:/home/debian/R2018B/licenses/network.lic
Licensing error: -4,132.

Error in Steerer_Screen_thomx (line 70)
        imageArray=mat2gray(imageArray);

 

  468   Tue May 31 09:21:02 2022 MO/SC/HG, JNC/CBFixedLinacElectronique Demarrage et faisceau 

9h15 : Mise en chauffe modulateur et chiller (SC/MO/HG)

Aujourd'hui : Alignement faisceau (CB, HG, JNC, SC)

Valeur max photodiode : hier on avait 62 mV sur le scope (JNC) et aujourd'hui on a 0.58 de valeur de signal sur taurus (HG, SC)

A 10h21 on a entre 0.6 et 0.62 de signal photodiode

Phase de charge max = 161 (identique à hier)

Mesure stabilité laser :

Perte modulateur 11h04 *2 (de trig à Hv)

Perte modulateur 11h06

mesure puissance RF

PIC = 216.3mV

PIS = 127.53 mV

PHOTODIODE u=66 mV

Valeurs BPMs avant scan

LI/DG/BPM.01-LIB.01 SpX = environ 0.65 mm, Spy = environ 0.45 mm

Position Ecran LI/DG/SST.01 Position X = 15.9 mm  Position Y = -11 mm

TL/DG/BPM.01-LIB.02 SpX = environ 5 mm, SpY = environ -1.2 mm

Position Ecran TL/DG/SST.01 Position X = 17.4 mm Position Y = 7.7 mm

Scan phase section avec COL2 = 187 A
/LI_STR_1H-0.0_LI_STR_1V-0.0_LI_STR_2H-0.0__LI_STR_2V-0.0/Scan_pos_phase_LIL__at_31-05-2022__14-25-49.png

Augmentation du Sp Threshold de TL/DG/BPM.01-LIB.02 à 250 au lieu de 150, cela fait disparaitre les pics parasites observés.

Seuil modifié aussi pour LI/DG/BPM.01-LIB.01 qui passe à 250 au lieu de 150.

COL2 = 187 A Scan phase section :

LI_STR_1H-1.25_LI_STR_1V0.3_LI_STR_2H-0.0__LI_STR_2V-0.0/Scan_pos_phase_LIL__at_31-05-2022__15-04-39.png
LI_STR_1H-0.0_LI_STR_1V-0.0_LI_STR_2H-0.95__LI_STR_2V0.2/Scan_pos_phase_LIL__at_31-05-2022__15-15-40.png
LI_STR_1H0.4_LI_STR_1V-0.4_LI_STR_2H-1.34__LI_STR_2V0.35/Scan_pos_phase_LIL__at_31-05-2022__15-43-06.png- 

-quelques analyses de positionnement du faisceau entrée sortie section avec et sans puissance RF (notes à reporter), on retrouve des tilt de 10 mrad et des offsets de 10mm à mettre à l'entrée de la section pour que le faisceau soit transmis

- Quad scan pour plusieurs valeurs de courant du solénoides 175A, 220A, et 210A

- Energie en fin de section 50.28 MeV, charge 100 pC avant et après section

Arret machine 23h30 (CB, JNC)

quelques arrets modulateur :

- 20h35 standby 1 fois

- 20h37 Hv 3 fois

- 23h13 HV 2 fois

Prochaine manipes la semaine prochaine :

- mesure de dimensions en sortie canon en fonction du courant du solénoides (en s'arrurant charge phase, et energie /phase, et dimension laser)

- encore un peu d'émalioration de l'alignement soléno à faire (en adaptant le script avec la variation de la phase, énergie et courat soléno)

 

 

 

 

 

 

 

 

  399   Mon Mar 14 16:40:24 2022 MO/JNC Shift summaryLinac Commissionning démarrage du 14 mars 

Modulateur 1090, 0 dB voie canon,  1.5dB sur la section

Image laser enregistrée, position h867, v 566 pixels, taille vsig*0.56mm, V 0.38mm rms

Charge phase max 140pC, 134 degrés,

On se décale de 40 degrés, soit 94 degrés,

Remise en eau des alim dipoles, reset fait en local

délocage du laser, on attend

coil2 = 200A, coil1=1, E= 4.43 MeV, Li/BPM, spx= 0.2mm, Spy=0.3mm

sans solenoide : phase 132 degrés, spx= 0.8 mm, spy = 1mm

Mesure énergie en fonction de la phase section Phase=[110 100 90 80 70 60]; energy=[51.2 55.7 49.26 48 42.7 40.1];

perte de charge à 19h48 --> 20h07, il revient le laser ! marche/arret de l'ampli entre deux, on reperd...

 

Le chat noir du laser est revenu...... Viktor où es tu ??

On abandonne

 

 

  888   Tue Jul 23 11:55:42 2024 MO, MELK, MJUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/07 

Reprise de conditionnement section 23/07 @ 10H30: largeur impulsion 0.5 µs @10 Hz ( voir images )

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

* Mettre attenuation section 10 dB

* Augmenter Pik progressivement et en douceur jusqu'à sa valeur nominale Pik=33 MW ( Alim 1215 V & HT  288 kV)

* Puis faire baisser attenuation section de 10 dB progressivement et en douceur

*attenuation section 0.25 dB==> puissance incidente section Pis =23 MW ==> vide section <3.10-9 mbar

* attenuation 0.1 dB (24 MW)==> vide  sortie section 2.5 .10-9 mbar et entrée section 4.6 10-9 mbar

12h00 : largeur 1µs @ 10 Hz

* augmenter attenuation section de 0.1 dB jusquà  10 dB progressivement puis on change la largeur de 0.5 à 1 µs ( Pik =33 MW)
* faire baisser attenuation section de 10 dB à 0.1 dB progressivement et en douceur

* 14h00 attenuation 0.1 dB (Pis= 24 MW)==> vide  sortie section 7 .10-9 mbar et entrée section 6.10-9 mbar. A 14h03 ( 1 claquage dans la section ==>pic de vide  ) voir image RF plots  et Vide plots

* 14h13 attenuation 5 dB puis la faire baisser progressivement . 

* 0.1 dB (Pis=24 MW) de 14h20 à 14h51 il ya un claquage dans la section aprés 30min==> pic vide entrée section (voir images) .

* 14H53 trig @ 0.1 dB . A 15H15 claquage dans la section (Pis=24 MW)==> pic de vide entrée section (voir images )

* Passage att sec @ 2 dB et trig à 15h16, Puis faire baisser l'atténuation progressivement jusquà 0.5 dB (Pis= 22 MW) 15H30.

* 16H att sec 0.25 dB (Pis=23 MW)

* 16H 22 att sec 0.1 dB (Pis=24 MW) jusqu à 16h 35 pas de claquage

NB: signal Pis anomale (amplitude et forme visualisé avec Oscillo ==> vers 16H15  changement de cable BNC défectueux  => la forme et l'amplitude du signal Pis mesuré avec oscillo redevient correct et similaire à celui mesuré avec carte redpitaya (voir images jointes)

** Passage à la largeur d'impulsion 2µs_10Hz  @16H35

*mettre attenuation à 10 dB puis passage à 2 µs & 10Hz

* faire baisser l'atténuation de 10 dB

* 16H45 att.sec 1.5 dB (Pis=17 MW)==>vide < 7.10-9 mbar

* 16h53 att. sec 1.3 dB (Pis=18 MW)==> vide < 8.10-9 mbar

* 17h00 att.sec 1 dB (Pis= 19.5 MW)===> vide entrée et sortie section monte à 1.4 10-8 mbar

*17h12 att.sec 0.8 dB ( Pis= 20.5 MW) ==> vide monte à (sortie sec à 1.6 10-8 mbar et entrée sec à 1.4 10-8 mbar )

* 17h17 att.sec 0.5 dB ( Pis= 22 MW) ==> vide monte à( sortie  sec à 1.7 10-8 mbar et entrée sec à  1.3 10-8 mbar )

* 17h21 att.sec 0.3dB ( Pis= 23MW) ==> vide monte à (sortie  sec à 1.6 10-8 mbar et entrée sec à 1.2 10-8 mbar)

* 17h 24 att.sec 0.1dB ( Pis= 24MW) ==> claquage  dans la section à 17h28 ==> pic vide (voir images saved )

Arret de conditionnement à 17h30 et à reprendre jeudi

 

 

Attachment 1: signaux_rf_scope.png
signaux_rf_scope.png
Attachment 2: signaux_RF_redpitaya_.png
signaux_RF_redpitaya_.png
  1139   Fri Oct 17 09:07:03 2025 MO VC ND VM Shift summaryLI | TL | LE | Linac Commissionning Shift summary 

demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
Recherche du faisceau dans la TL sans le ring =>pas trouvé
mesure OTR
12:17 Intervention de 3 personnes de Dalkia dans la X hutch (ils disent que c'est a la demande de Kevin)

Apres-midi: optimisation anneau et EL

17:00 arret

  705   Mon Mar 6 11:09:50 2023 MO VCUnder ProcessLinacLinac Commissionning | Ring Commissioning Commitionning 

10 H demarrage chauffage modulateur et chillers  (le pc modulateur était planté  => Maher l'a redémarré)

11h20 chauffage Klystron terminé

pause repas

 

  489   Mon Jul 4 09:47:22 2022 MO Shift summaryRF D1   

Mise en route aprés remplissage réseau eau refroidissement

Mise en route modulateur

Mise en route frigo et chillers

 