| ID |
Date |
Author |
Status |
Type |
Category |
Location |
Title |
Text |
 |
|
17
|
Thu Oct 14 18:12:39 2021 |
Ronic Chiche | Fixed | info | detectors and electronics | utilities | ThomX igloo | Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum | This afternoon, we continued to clean the
housing with Manar and Daniele.
we did a dust measurement after cleaning |
|
|
1
|
Mon Sep 30 16:32:31 2019 |
Ronic Chiche | Fixed | issue | utilities | Optical room | Chiller of the new laser amplifier | We observed 2 issues for the chiller of
the new CELIA laser amplifier:
setting the water temperature |
|
|
2
|
Tue Oct 1 12:24:11 2019 |
Ronic Chiche | Fixed | issue | utilities | Optical room | Chiller of the new laser amplifier | Today, the chiller worked at 17°C during
3 hours without error, no freezing nor flow
sensor error. |
|
|
42
|
Tue Mar 8 12:40:00 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | - this morning with Aurélien, we
filled the water tank of the chiller and
we opened the water valves (last pipes on |
|
|
43
|
Wed Mar 9 10:51:59 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | - this morning the chiller leakage has
been fixed by adding some Teflon on the faulty
Swagelock adapter. |
 |
|
44
|
Fri Mar 11 12:24:34 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | This morning, I started the chiller and
opened the valves on the external water circuit
=> no water leakage during the morning. |
|
|
46
|
Thu Jan 5 10:16:38 2023 |
Manar Amer | Fixed | info | utilities | ThomX igloo | Alphanov amplifier chiller instruction manual | Adding the instructions manual for the
Alphanov Amplifier SMC Chiller
|
|
|
49
|
Wed Jul 5 16:50:50 2023 |
Ronic Chiche | Fixed | issue | utilities | ThomX igloo | Airflow power breakdown | since around 2 weeks, the airflow above
the optical table housing has a power breakdown
when one tries to switch it on. |
|
|
14
|
Thu Jun 10 17:06:42 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Airflow installation | On the 27th of May, the Airflow has been
dismounted from the optical room to be mounted
around the optical cavity by the AirC2 company. |
|
|
15
|
Thu Jun 10 17:45:09 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Airflow installation | The AC plug and the power cord of the airflow
were quite hot because they have been dimensioned
for 16A current and the total current is |
|