  27   Tue Oct 19 16:38:31 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 15h30 in
the afternoon, the pressure on the mirror
chambers is:
 19102021_vacuum_pressure_on_mirrorsChambers_15h30.jpg 
  28   Wed Oct 20 10:51:29 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 10h in
the morning, the pressure on the mirror chambers
is:
 20102021_vacuum_pressure_on_mirrorsChambers_10h10.jpg 
  29   Thu Oct 21 09:45:03 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 9h30 in
the morning, the pressure on the mirror chambers
is:
 21102021_vacuum_pressure_on_mirrorsChambers_9h30.jpg 
  40   Thu Feb 10 09:41:54 2022 Ronic ChicheFixedinfocablingThomX iglooPower supplies switched offThis afternoon, an electrical operation
will be done in ThomX, impacting possibly
the casemate power supplies.
  
  10   Wed Feb 24 17:35:55 2021 Ronic ChicheFixedreportmechanics | vacuum | utilitiesOptical roomOperations before moving the optical tableOperations before moving the optical table
from the optical room to the Igloo.

— the cavity has been filled
  
  34   Thu Nov 4 12:42:38 2021 Ronic ChicheFixedinfovacuumThomX iglooOpening of the FP cavity valvesas the vacuum level was good enough, I
asked Eric Mistretta to open the 2 valves
of the FP cavity.
 IMG_20211104_112239.jpg 
  35   Mon Nov 8 14:50:45 2021 Ronic ChicheFixedinfovacuumThomX iglooOpening of the FP cavity valvesOn Friday the 5th of November, ThomX suffered
again from a power breakdown.

all the pumping systems had to
  
  38   Tue Jan 11 10:32:45 2022 Manar AmerFixedreportlasers and opticsThomX iglooOne Five laser moved The One Five laser and
its controller have been moved from PLIC
to ThomX Iglo.
  
  4   Tue Nov 19 17:55:20 2019 Ronic ChicheFixedissuemechanics | vacuumOptical roomNew valves cablingToday, Manu and Eric changed the cavity
valves pressure system to open and close
them.
  
  6   Wed Nov 20 14:52:45 2019 Loïc AmoudryFixedinfolasers and optics | vacuumOptical roomNew valve cabling and 30Hz noise PZTThe Pneumatic valves are still coming back
to "close" position.
Now the air bottle is always "open"
 Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png 
  11   Fri Feb 26 17:04:57 2021 Ronic ChicheFixedreportmechanicsThomX iglooMoving the optical table to the IglooThis morning the Bovis company moved the
optical table from the optical room to the
Igloo without any problem.
 9x 
  23   Mon Oct 18 15:15:26 2021 Manar AmerFixedreportcabling | softwareThomX iglooMotors Controler and Software
When connecting
the Ethernet cable from the hub to the computer,
it must be connected to the correct one (shown
 ConnectEthernetToDesignatedOutlet_marked.jpgMototControlerws.jpgPositionOnMoniter.jpeg 
  36   Tue Nov 16 15:23:22 2021 Manar AmerFixedreportutilitiesThomX iglooIris Mounts on Cavity WindowsIn order to find the Alignment of the ThomX
cavity, Yann built mounts that could be placed
directly on the windows outside the cavity,
 Iris_Mounts_On_Windows.jpgP1_Injection_Mirror_Window_Iris_Mount.jpgInkedS3_Mirror_Window_Outside_LI.jpg 
  37   Fri Nov 19 16:33:29 2021 Manar AmerFixedreportutilitiesThomX iglooIris Mounts on Cavity WindowsThe new iris mounts fixed on the small
cavity windows.

Need additional 2 irises.
 Iris_Mounts_On_small_Windows.pngIris_Mounts_Fixed_On_small_Windows.png 
  20   Fri Oct 15 17:57:54 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateThis afternoon with Manar, we finished
connecting FP-cavity mirrors motors and alignment
mirrors motors to their 3 ISP controllers.
  
  21   Mon Oct 18 09:46:14 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateafter the WE, the right vessel vacuum level
is 1.7e-7 mbar (primary + turbo pumps)

and the left vessel vacuum level
  
  22   Mon Oct 18 15:01:07 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateNow, both vessels are pumped by an ionic
pump (both Turbo pumping entrances have been
closed).
  
  9   Wed Jul 1 17:00:18 2020 Ronic ChicheFixedreportmechanics | vacuumOptical roomEdge installation19/06/2020

The first part of the edge installation
was on done by Yann and Ronic
  
  13   Thu Jun 10 16:55:37 2021 Ronic ChicheFixedinfomechanicsThomX iglooConnecting the optical table to the ThomX ringOn the 19th of May, the optical table has
been moved inside the ThomX concrete housing
and connected to the Symetrie hexapod and
 Image1.jpgImage2.jpgImage3.png 
  16   Thu Oct 14 15:08:56 2021 Ronic ChicheFixedinfodetectors and electronics | utilitiesThomX iglooCleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuumThis morning with Manar, we started to
clean the floor around the cavity, the outside
part of the panels of the housing, and the
  