  Status of installation, including shipping and de-installation of test setups., Page 2 of 3  Not logged in ELOG logo
ID Date Author Status Type Categorydown Location Title Text Attachments
  47   Wed Feb 8 11:02:38 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsIf one needs to work with 3rd stage on
the laser amplifier, one needs to make the
safety patrol inspection before closing the
 key_board.jpg 
  48   Wed Feb 8 13:48:33 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsafter finishing the controlled intervention,
you just have to exit the bunker with the
2 keys and place them back in their location
  
  49   Wed Jul 5 16:50:50 2023 Ronic ChicheFixedissueutilitiesThomX iglooAirflow power breakdownsince around 2 weeks, the airflow above
the optical table housing has a power breakdown
when one tries to switch it on.
  
  10   Wed Feb 24 17:35:55 2021 Ronic ChicheFixedreportmechanics | vacuum | utilitiesOptical roomOperations before moving the optical tableOperations before moving the optical table
from the optical room to the Igloo.

— the cavity has been filled
  
  4   Tue Nov 19 17:55:20 2019 Ronic ChicheFixedissuemechanics | vacuumOptical roomNew valves cablingToday, Manu and Eric changed the cavity
valves pressure system to open and close
them.
  
  9   Wed Jul 1 17:00:18 2020 Ronic ChicheFixedreportmechanics | vacuumOptical roomEdge installation19/06/2020

The first part of the edge installation
was on done by Yann and Ronic
  
  20   Fri Oct 15 17:57:54 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateThis afternoon with Manar, we finished
connecting FP-cavity mirrors motors and alignment
mirrors motors to their 3 ISP controllers.
  
  21   Mon Oct 18 09:46:14 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateafter the WE, the right vessel vacuum level
is 1.7e-7 mbar (primary + turbo pumps)

and the left vessel vacuum level
  
  22   Mon Oct 18 15:01:07 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateNow, both vessels are pumped by an ionic
pump (both Turbo pumping entrances have been
closed).
  
  3   Fri Nov 15 14:51:54 2019 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomSmaract Controllers settingScheme of cabling of the SmarAct motors
controllers for acting on Frep and CEP.
 Origami_OneFive_33MHz_laser_SmarAct_controllers_cabling.pdf 
  41   Thu Feb 10 15:08:41 2022 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooshutter base plate, L-shape arm and housing frameThis afternoon with Yann:
- we changed the shutter base plate
position to center the beam axis with the
  
  11   Fri Feb 26 17:04:57 2021 Ronic ChicheFixedreportmechanicsThomX iglooMoving the optical table to the IglooThis morning the Bovis company moved the
optical table from the optical room to the
Igloo without any problem.
 9x 
  13   Thu Jun 10 16:55:37 2021 Ronic ChicheFixedinfomechanicsThomX iglooConnecting the optical table to the ThomX ringOn the 19th of May, the optical table has
been moved inside the ThomX concrete housing
and connected to the Symetrie hexapod and
 Image1.jpgImage2.jpgImage3.png 
  14   Thu Jun 10 17:06:42 2021 Ronic ChicheFixedinfomechanicsThomX iglooAirflow installationOn the 27th of May, the Airflow has been
dismounted from the optical room to be mounted
around the optical cavity by the AirC2 company.
  
  15   Thu Jun 10 17:45:09 2021 Ronic ChicheFixedinfomechanicsThomX iglooAirflow installationThe AC plug and the power cord of the airflow
were quite hot because they have been dimensioned
for 16A current and the total current is
  
  42   Tue Mar 8 12:40:00 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning with Aurélien, we
filled the water tank of the chiller and
we opened the water valves (last pipes on
  
  43   Wed Mar 9 10:51:59 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning the chiller leakage has
been fixed by adding some Teflon on the faulty
Swagelock adapter.
 IMG_20220309_093541.pngChiller_Sub-d15_pinout.jpg 
  44   Fri Mar 11 12:24:34 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlockThis morning, I started the chiller and
opened the valves on the external water circuit
=> no water leakage during the morning.
  
  6   Wed Nov 20 14:52:45 2019 Loïc AmoudryFixedinfolasers and optics | vacuumOptical roomNew valve cabling and 30Hz noise PZTThe Pneumatic valves are still coming back
to "close" position.
Now the air bottle is always "open"
 Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png 
  38   Tue Jan 11 10:32:45 2022 Manar AmerFixedreportlasers and opticsThomX iglooOne Five laser moved The One Five laser and
its controller have been moved from PLIC
to ThomX Iglo.
  