16
|
Thu Oct 14 15:08:56 2021 |
Ronic Chiche | Fixed | info | detectors and electronics | utilities | ThomX igloo | Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum | This morning with Manar, we started to
clean the floor around the cavity, the outside
part of the panels of the housing, and the |
|
|
17
|
Thu Oct 14 18:12:39 2021 |
Ronic Chiche | Fixed | info | detectors and electronics | utilities | ThomX igloo | Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum | This afternoon, we continued to clean the
housing with Manar and Daniele.
we did a dust measurement after cleaning |
|
|
45
|
Thu Aug 25 16:43:01 2022 |
Ronic Chiche | Fixed | info | detectors and electronics | software | ThomX igloo | Scope and Desktop computer removing | this afternoon, because of the test on
the electron beam drive in the ring in the
next days, |
|
|
23
|
Mon Oct 18 15:15:26 2021 |
Manar Amer | Fixed | report | cabling | software | ThomX igloo | Motors Controler and Software |
When connecting
the Ethernet cable from the hub to the computer,
it must be connected to the correct one (shown |
  |
|
8
|
Wed Nov 27 09:48:44 2019 |
Ronic Chiche | Fixed | info | cabling | Optical room | new circuit breaker for the UPS | A new circuit breaker has been installed
today before the UPS to fix the shutdown
issues we observed some months ago when too |
|
|
39
|
Wed Jan 19 18:32:47 2022 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | new power supplies connexions | this afternoon with Viktor, we redid all
the power supplies connexions.
4x cables are now connected to |
|
|
40
|
Thu Feb 10 09:41:54 2022 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | Power supplies switched off | This afternoon, an electrical operation
will be done in ThomX, impacting possibly
the casemate power supplies. |
|
|
50
|
Wed Dec 20 09:35:36 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | Jean-Noel Cayla installed several days
ago a Eaton 9PX 11kVA UPS inside the Igloo,
outside of the ThomX bunker |
|
|
51
|
Wed Dec 20 10:17:19 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | finally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS |
|
|
52
|
Wed Dec 20 12:59:00 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | I was able to lock back the FP-cavity.
at one moment, during the alignment