242
Fri Sep 8 18:22:21 2023
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
ThomX igloo
Removing high order modes
here is the picture of the L-shape arm
and the inside of the vessel.
this image corresponds to the "zero"
245
Tue Sep 12 14:28:36 2023
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
ThomX igloo
Removing high order modes
yesterday with Daniele, we tried again
to move the arm horizontally and vertically
from the "zero position" to have
8
Mon Oct 22 11:27:35 2018
Ronic Chiche
Fixed
info
mechanics
Optical room
Remontage mécanique
Mail de Yann du 12/10/2018 :
Je vous fais le bilan des actions
effectuées :
9
Mon Oct 22 11:29:41 2018
Ronic Chiche
Fixed
info
mechanics
Optical room
Remontage des vérins
Mail de Yann du 8/10/2018 :
Bonjour,
Tous les vérins sont maintenant
431
Thu Jun 26 12:37:22 2025
Ronic Chiche
Fixed
info
lasers and optics
ThomX igloo
Recipies for different FPC power
For ~ 46kW power in the FP-cavity:
Alplhanov amplifier ratio
: 20%
432
Tue Jul 1 12:13:18 2025
Ronic Chiche
Fixed
info
lasers and optics
ThomX igloo
Recipies for different FPC power
For ~ 23kW power in the FP-cavity:
Alplhanov amplifier ratio
: 15%
436
Wed Jul 9 14:12:54 2025
Ronic Chiche
Fixed
info
lasers and optics
ThomX igloo
Recipies for different FPC power
For ~ 66kW power in the
FP-cavity:
56
Fri Sep 6 14:48:14 2019
Loïc Amoudry
Fixed
report
mechanics | vacuum
Optical room
Primary vacuum to check dust
The cavity has been cleaned then put under
primary vacuum (primary pump without vacuum
flow control). Dusts presence was checked
93
Wed Feb 19 17:21:28 2020
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Powerup with 2.5ps pulses
A power up has been performed on ThomX
until 65kW intracavity power. We didn't
see any modes but stored power was really
453
Thu Sep 18 18:29:04 2025
Ronic Chiche
Fixed
info
mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities
ThomX igloo
Power shut down on September 23th
to anticipate the power shut down on next
tuesday 23/09,
this afternoon, I switched off all
454
Fri Sep 26 11:08:21 2025
Ronic Chiche
Fixed
info
mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities
ThomX igloo
Power shut down on September 23th
this morning, I restarted all the equipments
of the FPC.
everything was fine after being
455
Fri Sep 26 11:13:35 2025
Ronic Chiche
Fixed
info
mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities
ThomX igloo
Power shut down on September 23th
the 33MHz/500MHz RF frequencies from the
Ring seems different from the previous state
(maybe working at an energy of 50MeV instead
456
Mon Sep 29 10:22:32 2025
Ronic Chiche
Fixed
info
mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilities
ThomX igloo
Power shut down on September 23th
This morning I did a phase alignment on
the PDH signal generator (Rigol DG4102)
this procedure ensure that both phases
199
Mon Mar 20 09:33:54 2023
Ronic Chiche
Fixed
info
utilities
ThomX igloo
Power shut down on Saturday the 18th
All the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th :
201
Mon Mar 20 17:39:28 2023
Ronic Chiche
Fixed
info
utilities
ThomX igloo
Power shut down on Saturday the 18th
Today, I restarted all the equipements
:
Chiller
449
Wed Aug 27 12:01:41 2025
Ronic Chiche
Fixed
info
detectors and electronics
ThomX igloo
Power shut down on August 29th
This morning, all the equipments have been
switched off due to a power shut down
tomorrow morning.
450
Thu Aug 28 18:01:46 2025
Ronic Chiche
Fixed
info
detectors and electronics
ThomX igloo
Power shut down on August 29th
after alignment, CEP adjustment and optimizing
the PDH phase, I got back ~92kW in the FPC
for 33% amplifier ratio.
427
Wed Jun 11 18:59:34 2025
Ronic Chiche
Under Process
issue
mechanics | lasers and optics | vacuum | detectors and electronics
ThomX igloo
Possible causes for the noise in the FP-cavity system
list of possible causes of the high frequency
noise which makes the system loosing the
lock => to be checked.
429
Wed Jun 25 09:57:56 2025
Ronic Chiche
Under Process
issue
mechanics | lasers and optics | vacuum | detectors and electronics
ThomX igloo
Possible causes for the noise in the FP-cavity system
4.3 - Vibrations of the mirror mounts due
to temperature related to cavity power (the
electrons machine is OFF)
42
Wed Jun 12 17:49:20 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Polarization
Polariztion measured with Input vertically/horizontally polarized
(~100% DOLP)
- Transmission (P4) locked on cavity