| ID |
Date |
Author |
Status |
Type |
Category |
Location |
Title |
Text |
 |
|
364
|
Tue Sep 17 12:48:13 2024 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Finding correct motors position and parameters to keep the lock during a move | this morning with Daniele, we did a quite
long run with this motor position and it
seems we don't lose the lock too much. |
|
|
363
|
Mon Sep 16 12:03:30 2024 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Finding correct motors position and parameters to keep the lock during a move | this morning, I try
to find a new region for MOT.03 and MOT.06
where we can move them without unlocking |
|
|
362
|
Mon Sep 9 11:00:43 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | this morning, with Vincent :
- we added the 10Hz trigger to
the CH2 on the remote scope (192.168.229.21) |
|
|
361
|
Fri Sep 6 17:27:20 2024 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | could it be possible this 20Hz oscillations
comes from anouncements in the bunker, puting
the housing+table in vibration ? |
|
|
360
|
Fri Sep 6 17:21:51 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | I changed a little bit the locking parameters
(see picture) for the RF/FPC loop and it
locked rapidely. |
|
|
359
|
Fri Sep 6 15:20:20 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | now, the Ring RF frequency is set to 500.067MHz.
so the CFP/laser frequency should
be 500.067MHz/15 = 33.3378MHz. |
|
|
358
|
Fri Sep 6 12:10:51 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | after redoing the alignment of the CVBG,
we got back the initial power in the FPC
(87kW) |
|
|
357
|
Fri Sep 6 11:56:53 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | this morning with Daniele, we realigned
the amplifier beam axis on the iris position.
it was pretty fast an easy => we |
|
|
356
|
Thu Sep 5 09:53:10 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | 1) this morning, I aligned to CFP to get
back 82kW in the cavity for 33% of amplifier
ratio. |
12x |
|
355
|
Thu Sep 5 09:51:22 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | the CVBG of the compressor module seems
to have an issue.
here is the plan of the work : |
|
|
354
|
Fri Aug 30 17:59:01 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | amplifier power measurement before the
compressor CVBG.
we used a mirror in between the amplifier |
|
|
353
|
Fri Aug 30 12:05:38 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | After the summer power shutdown, I restarted
all the equipements and got quickly ~80kW
for 33% amplifier ratio with CEP optimization |
|
|
352
|
Fri Aug 30 10:50:45 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | this morning with Daniele, we are measuring
the amplifier power just before the FP-cavity.
Casemate temperature @19.5°C |
|
|
351
|
Tue Aug 27 12:31:19 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | after doing some alignment (walking procedure
on the Y axis), and CEP optimization, I got
83kW for 33% on the laser amplifier with |
|
|
350
|
Tue Aug 27 11:33:24 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | we had to move the laser cavity motor to
find the resonances and change a lot the
CEP. |
|
|
349
|
Tue Aug 27 10:19:08 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | I refilled the chiller and the stabilized
temperature is @ 25°C
we started the 3rd stage of the |
|
|
348
|
Tue Aug 27 09:59:18 2024 |
Ronic Chiche | Fixed | info | lasers and optics | detectors and electronics | software | ThomX igloo | restarting CFP system after the long summer shutdown (RF section conditionning) and Alphanov amplifier issue | temperature in the casemate ~ 19.5°C
stable
this morning, I measured the power |
 |
|
347
|
Tue Jul 23 09:37:24 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | picture of the connectors used to carry
signals between the amplifier pump module
and the rack under the table. |
 |
|
346
|
Mon Jul 22 09:54:24 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | Guillaume and Julien Bour from Alphanov
will come on wednesday 24/07 to have a first
look and check the amplifier. |
|
|
345
|
Wed Jun 19 09:14:14 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | ThomX igloo | Alphanov amplifier issue | the present situation is :
Guillaume asked me to disconnect
the "Laser head" cable from the |
|