HOME
SBOX
THOMX
MINICAV
Utilities
THOMX orders
THOMX installation
THOMX commissioning
THOMX control command
Status of commissioning, report also here plots are reports., Page 22 of 24
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
461 Entries
Goto page
Previous
1
,
2
,
3
...
21
, 22,
23
,
24
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
41
Wed Jun 12 12:07:11 2019
Loïc Amoudry
Fixed
report
mechanics | lasers and optics
Other
Amplifier mission Bordeaux
M² mesuré à 10W.
M²x = 1.17
M²y = 1.14
40
Tue Jun 11 18:03:10 2019
Loïc Amoudry
Fixed
report
mechanics | lasers and optics
Other
Amplifier mission Bordeaux
Voyage Bordeaux au CELIA avec Jérôme
LHERMITE (Loïc et Titoutan)
1er jour (34°) :
39
Thu May 23 17:30:03 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Transmission of Sapphire mirror
See image.
38
Thu May 23 10:10:56 2019
Ronic Chiche
Fixed
report
lasers and optics
Optical room
Finesse measurement by decay time technique
5 Files attached:
- Note on the technique and results
for the present cavity on 2019, May 21th
37
Tue May 21 17:49:30 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Finesse after cleaning (new suprasil mirror)
15/05/19-20/05/19:
Cleaning of the mirrors:
Initial finesse 14000 @air
36
Tue May 21 17:44:46 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
New Suprasil mirror from LMA
14/05/19:
New Suprasil mirror received. It
will replace the S-BOX suprasil mirror on
35
Thu Apr 18 16:17:53 2019
Loïc Amoudry
Fixed
issue
lasers and optics
Optical room
33MHz Onefive power overtime decrease
Power of the 33MHz Onfive decreases over
time. Have to pay attention to that.
Note that air dryers have never been
34
Thu Apr 18 16:07:23 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Injection of 33MHz Onefive through fiber
Output power of the Onefive, and power
after injection and different components
have been measured.
33
Wed Apr 10 13:11:46 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Mirror's cleaning and finesse
Summary of what have been cleaned
the last week:
P1 with isopropanol, finesse 11000
32
Mon Apr 8 11:55:40 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
P4 cleaned and finesse measurement
P4 cleaned with isopropanol.
Finesse measured afterward: ~=13
000 (clear increase)
31
Mon Apr 8 10:18:31 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Finesse after 2days
Finesse measured this morning after P1
SUPRASIL being into the cavity for two
days. In order to check if it's getting
30
Fri Apr 5 11:28:39 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Finesse with P1 SUPRASIL
P1 SUPRASIL has been installed instead
of P1 Sapphire. It has been cleaned 3 times
on each face with wipe+isopropanol before
29
Fri Apr 5 11:18:47 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Transmission of the mirrors
P1 transmission out of the mount (means
angle of the mirror is not the real angle):
Pin = 3.2 mW
28
Thu Apr 4 09:42:12 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Transmission of the mirrors
After verification, transmission of P1
correspond to ~150ppm.
The 1337ppm come from a beam leakage.
27
Tue Apr 2 18:05:46 2019
Loïc Amoudry
Fixed
info
lasers and optics
Optical room
Beam size at closest spherical mirrors position
S3 and S2 @ +1 640 000 and P1 and P4 @
-825 000
Diameter in x: 4.7mm
26
Tue Apr 2 18:03:31 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Transmission of the mirrors
We openned the cavity, removed S2 and measured
trans of P1 and same for S2.
Pin ~= 3.91 mW
25
Tue Apr 2 17:59:18 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Finesse after removing wires
19/04/01: We removed the wires from the
beam path in the cavity. Finesse stayed at
3400. FSR: 33.342 MHz.
24
Fri Mar 29 18:33:15 2019
Ronic Chiche
Fixed
issue
mechanics | lasers and optics
Optical room
Alignment procedure
we did again the complete alignment procedure
starting with iris and optimizing injection
motors Ma and Mb, then installing mirror
23
Thu Mar 28 09:25:58 2019
Loïc Amoudry
Fixed
issue
mechanics
Optical room
Motors Z axis reversed
All Z motors (for P1, S2, S3 and P4) have
been initialized again with a proper HOME
command with their own controller with
22
Tue Mar 26 18:32:40 2019
Loïc Amoudry
Fixed
report
mechanics | lasers and optics | cabling
Optical room
Wires in laser path
There was some ceramic wires close to the
beem path right before P4. We moved them
away (we can imagine they could move again
Goto page
Previous
1
,
2
,
3
...
21
, 22,
23
,
24
Next
All
ELOG V3.1.4-395e101